[00:00:12]
SUPERVISOR MILLER IS GOING TO BE ABSENT TODAY.
HE'S AT THE WATER INFRASTRUCTURE FINANCE AUTHORITY OF ARIZONA MEETING WITH A BOARD.
[Items 1-3]
AND FIRST ITEM ON THE AGENDA IS AN EXECUTIVE SESSION.SO, GENTLEMEN, MAY I PLEASE GET A MOTION TO CONVENE TO EXECUTIVE SESSION.
AND SECOND, THOSE IN FAVOR PLEASE INDICATE BY SAYING I I I OPPOSED.
HEARING NONE WE'RE IN EXECUTIVE SESSION.
BACK IN A FEW. GOING TO RECONVENE THE REGULAR SESSION.
MAY I GET A MOTION TO ADJOURN EXECUTIVE SESSION.
SO MOVED. I HAVE A MOTION AND A MOTION AND A SECOND.
THOSE IN FAVOR, PLEASE INDICATE BY SAYING I, OPPOSED HEARING NONE.
MOTION PASSES. THANK YOU VERY MUCH.
WE ARE BACK IN REGULAR SESSION.
[4. Discussion/approval/disapproval to authorize the execution of a conflict waiver as to outside counsel so that outside counsel may represent both Pinal County and Lucid USA in separate, unrelated matters. (Ian Daranyi)]
THAT BRINGS US TO ITEM NUMBER FOUR, WHICH IS WHAT THE HECK IS YOUR DISCUSSION? APPROVAL. DISAPPROVAL TO AUTHORIZE THE EXECUTION OF A CONFLICT WAIVER AS TO OUTSIDE COUNSEL, SO THAT OUTSIDE COUNSEL MAY REPRESENT BOTH PINAL COUNTY AND LUCID USA IN SEPARATE, UNRELATED MATTERS.MR. DURRANI, YOU ARE UP, I BELIEVE.
OH, NO. I'M ACTUALLY. I'M SORRY.
EVEN EVEN BETTER, MISS ROBERTS.
THANK YOU. CHAIRMAN, CHAIRMAN.
BOARD OF SUPERVISORS. I HAVE BEFORE YOU TODAY A REQUEST FOR A CONFLICT WAIVER.
WE. PINAL COUNTY HAS RETAINED DICKINSON WRIGHT TO IN SOME MATTERS REGARDING COMMERCIAL REAL ESTATE TRANSACTION AGAINST LUCID.
LUCID ALSO WOULD LIKE TO RETAIN DICKINSON WRIGHT IN A SEPARATE UNRELATED MATTER TO WHICH PINAL IS NOT INVOLVED AND NOT A DEFENDANT ETHICALLY, IN ORDER FOR DICKINSON RIGHT TO BE ABLE TO REPRESENT BOTH PINAL COUNTY AND LUCID IN THESE UNRELATED MATTERS, THEY HAVE TO BE A CONFLICT WAIVER FROM EACH CLIENT. SO THIS IS WHAT WE'RE WE'RE ASKING APPROVAL FOR.
THERE WOULD BE NO CONFIDENTIAL INFORMATION SHARED BETWEEN THE PARTIES AND SHOULD, SHOULD SOMETIME, IF AT ANY TIME IN LITIGATION ARISES BETWEEN LUCID AND PINAL COUNTY, THEN DICKINSON WRIGHT WOULD HAVE TO REMOVE THEMSELVES FROM THAT SITUATION. RIGHT. THANK YOU. ANY QUESTIONS FROM THE BOARD FOR MISS ROBERTS? NOPE. HEARING AND SEEING NONE.
THANK YOU VERY MUCH. IN THAT CASE, MAKE IT A MOTION ON ITEM NUMBER FOUR.
MR. CHAIR, I'D LIKE TO MAKE A MOTION THAT WE APPROVE.
THE UNDERSTANDING THAT WE JUST WE JUST SAY YOU WANT TO APPROVE WHATEVER NUMBER FOUR SAYS. THAT'S WHAT WE WANT TO DO.
I'D LIKE TO MAKE A MOTION THAT WE VOTE ON NUMBER FOUR AS PRESENTED.
DOES THAT WORK? I THINK WE STUMBLED THROUGH THAT ONE JUST FINE. I HAVE A MOTION.
IS THERE A SECOND? WE HAVE A MOTION AND A SECOND.
THOSE IN FAVOR OF THIS MOTION PLEASE INDICATE BY SAYING AYE.
AYE. AYE. OPPOSED? HEARING NONE.
MOTION PASSES. THANK YOU VERY MUCH.
I DID SLAUGHTER THAT. YOU DID REAL GOOD AT THAT.
READ THE WORDS. OKAY. SO ITEM NUMBER FIVE IS THE WORK SESSION.
[5. Work Session: Presentation and discussion to provide education and understanding of how data centers may influence and impact the county's economic and community conditions. This session will include an overview of data centers, with a more in-depth review of their interactions with water and power resources. Additional in-depth education on other related data center topics will be discussed in a future work session(s). (Joel Millman)]
IT'S A PRESENTATION AND DISCUSSION TO PROVIDE EDUCATION AND UNDERSTANDING ON HOW DATA CENTERS MAY INFLUENCE AND IMPACT THE COUNTY'S ECONOMIC AND COMMUNITY CONDITIONS.THANK YOU. GOOD MORNING, MR. CHAIRMAN. I HOPE I CAN STUMBLE THROUGH THIS INTRODUCTION AS WELL.
SO WITH ADVANCES IN COMPUTING TECHNOLOGIES IN OUR CARS AND OUR APPLIANCES AND OUR WORKSTATIONS HERE. DATA CENTERS HAVE BEEN PROLIFERATED AROUND THE COUNTRY AND INTEREST IN OUR STATE AND IN OUR COUNTY.
SO YOU ALL HAVE ASKED FROM THE DYESS THERE ON MULTIPLE OCCASIONS IF WE CAN DO WORK SESSIONS TO HELP EDUCATE THE BOARD, THE STAFF, THE PUBLIC ON WHAT QUESTIONS, CONCERNS, BENEFITS ARE AROUND THESE DATA CENTERS.
AND WHERE, YOU KNOW, THE TECHNOLOGY HAS BEEN IN THE PAST WHERE IT'S NOW AND WHERE IT'S GOING TO BE IN THE FUTURE.
AND SO WE'VE PUT TOGETHER SOME SPEAKERS TO COME DO JUST THAT.
AND WE THINK THAT WITH THE CONTENT INVOLVED, THERE WILL BE MULTIPLE WORK SESSIONS BECAUSE WE COULDN'T DO IT ALL IN ONE MORNING.
SO, AND FOR THE RECORD TODAY WE DO HAVE A REVISED ARIZONA STATE UNIVERSITY PRESENTATION. WE HAVE A NEW SALT RIVER PROJECT.
SRP PRESENTATION AND A NEW ARIZONA COMMERCE AUTHORITY PRESENTATION THAT WILL BE ADDED TO
[00:05:03]
THE RECORD INTO THE MINUTES.AND I THINK THEY WILL ALL HELP TO GIVE HISTORICAL PERSPECTIVE CONCERNS AROUND THINGS LIKE UTILITIES, WATER ETC..
AND WHERE WE'RE AT TODAY AND WHERE WE'RE GOING IN THE FUTURE.
SO FIRST PRESENTER THIS MORNING, WE HAVE KELLY BARR, WHO IS THE ASSOCIATE VICE PRESIDENT AND CHIEF ALLIANCE OFFICER AT THE GLOBAL FUTURES LABORATORY WITH ARIZONA STATE UNIVERSITY.
WELCOME AND THANK YOU, KELLY, FOR BEING HERE. THANK YOU VERY MUCH.
I'M HAPPY TO BE HERE. GOOD MORNING.
GOOD MORNING. CAN WE PUT THAT ON? OH, THERE YOU GO. PERFECT. AS HE INDICATED, I AM KELLY BARR.
I'M THE ASSOCIATE VICE PRESIDENT AND CHIEF ALLIANCE OFFICER OF THE GLOBAL FUTURES LABORATORY, THE WORLD'S LARGEST, THE LONGEST TITLE EVER.
MOST PEOPLE AREN'T FAMILIAR WITH THE GLOBAL FUTURES LABORATORY. SO IF I CAN JUST TAKE A MINUTE AND EXPLAIN THAT, I MIGHT. IT MIGHT BE HELPFUL TO PROVIDE SOME CONTEXT. ABOUT 7 OR 8 YEARS AGO, ASU PRESIDENT MICHAEL CROW LOOKED AROUND AND SAID, HEY, I SEE THAT WE HAVE NATIONAL LABORATORIES FOR WEAPONS AND FOR NUCLEAR AND FOR JET PROPULSION, BUT WE DON'T HAVE A NATIONAL LABORATORY FOR THE FUTURE OF THE PLANET. AND SO HE DECIDED TO CREATE ONE.
HE, HE STYLED IT IN AN INTERESTING WAY.
HE MADE IT A UNIVERSITY WITHIN THE UNIVERSITY.
AND HE ALLOWED US, IF YOU THINK OF THIS AS ASU HE ALLOWED US TO KIND OF SPAN THE ENTIRE UNIVERSITY AND, AND BY THAT, I MEAN WE ARE ABLE TO REACH DOWN ACROSS THE ENTIRE UNIVERSITY, REACH INTO ENGINEERING, REACH INTO THE BUSINESS SCHOOL, REACH INTO LIBERAL ARTS TO PULL TOGETHER TEAMS OF PEOPLE TO WORK ON COMPLEX GLOBAL CHALLENGES LIKE CLIMATE CHANGE, LIKE WATER QUALITY AND WATER QUANTITY, LIKE ENERGY. WE HAVE ABOUT 950 SCIENTISTS AND SCHOLARS WHO WORK AT THE, AT THE GLOBAL FUTURES LABORATORY.
AND SO I THINK THAT HOPEFULLY THAT HELPS YOU EXPLAIN WHY WE, WHY WE GOT INVOLVED IN DATA CENTERS AND WHY WE'RE INTERESTED IN THIS TOPIC.
BEFORE JOINING ASU, I WORKED AT SRP FOR MORE THAN THREE DECADES.
MY LAST ROLE THERE WAS AS THE CHIEF STRATEGY PLANNING AND SUSTAINABILITY EXECUTIVE.
AND SO I KNOW A LITTLE BIT ABOUT ENERGY.
AND SO ABOUT A LITTLE MORE THAN A YEAR AGO, MY COLLEAGUES AT GFL CAME TO ME AND THEY SAID, HEY, KELLY YOU USED TO WORK AT A UTILITY, LET'S DO SOMETHING ON DATA CENTERS.
AND I SAID, YOU KNOW, I THINK THAT'S A GREAT IDEA.
BUT INSTEAD OF US JUST ASSUMING WE UNDERSTAND WHAT THE NEEDS ARE FOR DATA CENTERS, WHY DON'T WE FIRST INVITE THE ECOSYSTEM, THE DATA CENTER ECOSYSTEM IN TO VISIT WITH US AND SHARE THEIR OPPORTUNITIES AND CHALLENGES? SO FOR MORE THAN A YEAR, WE'VE BEEN MEETING EVERY OTHER WEEK.
IT STARTED OUT TO BE ABOUT TEN SCIENTISTS AND SCHOLARS ON THIS TEAM.
IT'S NOW UP TO 20, AND WE MEET FOR 45 MINUTES.
AND WE BRING PEOPLE IN FROM THE OUTSIDE TO TALK WITH US ABOUT WHAT THOSE OPPORTUNITIES AND CHALLENGES ARE. SO WE HAVE HEARD FROM DATA CENTERS, GOOGLE, AMAZON, QRS, OTHERS, WE'VE HEARD FROM ALL OF THE UTILITIES THEY CAME IN AND VISITED. YOU'LL HEAR FROM THEM TODAY.
WE'VE HEARD FROM CITIES WHO ARE GRAPPLING WITH DATA CENTERS AS, AS THEY GET PLANNED FOR THEIR COMMUNITIES.
WE'VE HEARD FROM ENVIRONMENTAL GROUPS AND FROM COMMUNITY ACTIVISTS, AND WE'VE HEARD FROM ECONOMIC DEVELOPMENT PROFESSIONALS.
AND SO AT THE END OF THAT YEAR TOGETHER, WE SAID, YOU KNOW, WE REALLY LEARNED A LOT AND WE HAD SOME SURPRISING THINGS. AND SARAH PORTER IS GOING TO TALK WITH YOU ABOUT ONE OF OUR SURPRISES, WHICH WAS AROUND WATER USE IN DATA CENTERS.
AND I'M GOING TO LET HER DO HANDLE THAT SURPRISE FOR YOU.
BUT THERE WERE THINGS THAT WE ABSOLUTELY LEARNED.
AND SO WE DECIDED THAT WE WOULD HAVE IN ONE DAY TRY TO SHARE EVERYTHING.
WE LEARNED THAT IT TOOK US A YEAR TO, TO PICK UP.
AND SO ON FEBRUARY 11TH, WE INVITED 300 COMMUNITY FOLKS, FOLKS FROM CITIES, FOLKS FROM THE GOVERNOR'S OFFICE, FOLKS FROM THE LEGISLATURE, FOLKS FROM ALL ACROSS THE STATE TO COME IN AND HEAR A SERIES OF PANELS.
SO WE HAD A PANEL OF DATA CENTERS, A PANEL OF UTILITIES, A PANEL OF ECONOMIC DEVELOPMENT PROFESSIONALS, A PANEL OF WATER OR I'M SORRY, A PANEL OF COMMUNITY FOLKS AND THEN CITIES.
AND INTERSPERSED WAS WITH WITH THOSE PANELS WERE SOME ASU EXPERTS SARAH PRESENTED.
SO YOU'RE GOING TO HEAR IT FROM HER TODAY.
AND SHE SHE TALKED ABOUT WATER.
WE HAVE AN EXPERT AT SRP WHO FOCUSES ON HEAT EMISSIONS FROM DATA CENTERS.
AND A, AN EXPERT ON CHIP SEMICONDUCTOR CHIPS.
LIKE WHAT IS THE FUTURE OF CHIPS? IS IT POSSIBLE WE WOULD BUILD ALL THESE DATA CENTERS AND THEY WOULDN'T BE NECESSARY? SO AS
[00:10:05]
A RESULT OF DOING THAT, ON FEBRUARY 11TH, YOUR TEAM FROM PINAL COUNTY REACHED OUT TO US AND ASKED IF WE MIGHT COME AND SHARE AT LEAST PART OF THOSE LEARNINGS.AND THAT'S WHAT WE'RE GOING TO DO TODAY. SO NEXT SLIDE.
I'M GOING TO HANDLE A QUICKLY DATA CENTERS 101.
I'M GOING TO TURN IT OVER TO SARAH. SARAH IS GOING TO DISCUSS WATER.
AND THEN IN SEPARATE PRESENTATIONS TODAY, YOU'RE GOING TO HEAR FROM BOTH APS AND SRP.
WE'RE GOING TO TALK ABOUT ENERGY RELATED ISSUES.
AND THEN THE LAST PRESENTER TODAY IS GOING TO IS FROM THE ARIZONA COMMERCE AUTHORITY.
AND HE'S JUST GOING TO HE'S GOING TO TALK A LITTLE BIT ABOUT THE THE GROWTH OF DATA CENTERS AND WHO'S INTERESTED IN LOCATING HERE.
SO THAT'S WHAT WE'RE GOING TO DO TODAY. NEXT SLIDE PLEASE.
SO IN TERMS OF NOT COVERED HERE THIS IS AN IMPORTANT SLIDE.
THERE ARE SOME VERY COMPLEX TRADE OFFS ASSOCIATED WITH DATA CENTERS.
AND IT REALLY COMES DOWN TO A COMMUNITY DECISION.
IT REALLY EVERY COMMUNITY IS GOING TO NEEDS TO ASSESS THE BENEFITS AND THE COSTS ASSOCIATED WITH THE DATA CENTERS AND MAKE THEIR OWN DETERMINATION OF WHAT'S RIGHT FOR THEIR OWN COMMUNITY. AND WE ARE NOT TAKING A POSITION ON ANY PARTICULAR DATA CENTER DECIDING A SITING DECISION HERE.
WE WANT TO MAKE THAT CLEAR. THIS IS DURING THAT HOUR, FEBRUARY 11TH EVENT, WE HAD SOME CITIES WHO WERE VERY PRO DATA CENTERS, AND THEY WERE ASKING ALL DATA CENTERS TO COME LOCATE IN THEIR COMMUNITY.
AND WE HAD OTHERS WHO WERE NOT THAT EXCITED ABOUT DATA CENTERS AND LOTS OF FOLKS IN BETWEEN. SO IT REALLY IS SOMETHING THAT EACH COMMUNITY HAS TO DECIDE FOR THEMSELVES.
WHAT WE'RE TRYING TO DO IS JUST PROVIDE FACTS THAT YOU CAN USE TO MAKE THOSE THOSE DECISIONS FOR YOURSELVES.
OKAY. NEXT SLIDE. SO DATA CENTERS ARE THE FASTEST GROWING INDUSTRY IN THE WORLD.
THIS IS REALLY DRIVEN BY OUR INCREASED APPETITE FOR BOTH AI AND CLOUD SERVICES.
BY THE END OF 2026 GLOBAL DATA DATA CENTER USAGE WILL TOP 1050 TERAWATT HOURS.
AND I KNOW FOR PEOPLE WHO ARE NOT IN THE UTILITY INDUSTRY, THAT DOESN'T SEEM LIKE A VERY BIG NUMBER. BUT SO TO PUT THAT IN CONTEXT, IF YOU TREATED THAT LIKE A COUNTRY, THE ENERGY USAGE OF THOSE DATA CENTERS, BY THE END OF 2026, IT WOULD BE THE FIFTH LARGEST COUNTRY IN THE WORLD FOR FOR ENERGY CONSUMPTION. SO THERE IS A LOT OF ENERGY CONSUMED BY DATA CENTERS.
AND THAT IS INTENDED TO GROW OVER TIME.
THIS IS A SLIDE THAT WAS PUT TOGETHER BY THE ELECTRIC POWER RESEARCH INSTITUTE.
AND THIS WAS DONE INTERESTINGLY IN 2023.
AND THEY SAID, HEY, YOU KNOW, WHAT'S WHAT WOULD LOW GROWTH OF DATA CENTERS LOOK LIKE? WHAT WOULD MODERATE GROWTH? WHAT WOULD HIGH GROWTH, HIGHER GROWTH? THAT WAS 2020, 2023, WHERE THEY THOUGHT MAYBE IT WOULD BE KIND OF IN THE BLUE AREA.
IT'S IN THE PURPLE AREA AND IN ARIZONA, IT'S DEFINITELY IN THE PURPLE AREA.
SO VERY SIGNIFICANT GROWTH OF DATA CENTERS.
AND, AND HERE'S WHY. SO GEOGRAPHY MATTERS.
IT'S NOT HAPPENING EVERYWHERE IN EVERY STATE.
IT IS CONCENTRATED IN A FEW STATES.
AND ARIZONA HAPPENS TO BE ONE OF THOSE STATES TEXAS HAS.
IT, ALTHOUGH THIS SLIDE DOESN'T DEPICT IT, IT'S ACTUALLY GROWING VERY, VERY VIGOROUSLY. BUT ARIZONA IS ONE OF THOSE STATES WHERE DATA CENTERS REALLY LOOK TO, TO, TO TRY TO LOCATE HERE.
NEXT SLIDE. AND HERE'S, HERE'S WHY THEY WANT, WHY THEY'D LIKE TO LOCATE IN ARIZONA.
AND SO WHEN OUR DATA CENTER FOLKS CAME IN TO VISIT WITH US, WE ASKED THEM, THIS WAS ONE OF THE QUESTIONS, WHY ARE YOU INTERESTED IN LOCATING HERE? OR WHY HAVE YOU LOCATED HERE? AND THEY TALKED ABOUT THE EXEMPTION FROM THE FROM THE STATE, COUNTY AND LOCAL SALES TAX AND USE TAXES.
THAT'S A SIGNIFICANT INCENTIVE.
AND IT, IT ACTUALLY, IT DRIVES A LOT OF INTEREST IN ARIZONA LOW OPERATING COSTS VERY COMPETITIVE UTILITY RATES FOR WATER AND POWER.
BUSINESS CONTINUITY IN ARIZONA, OF COURSE, WE DON'T HAVE A LOT OF NATURAL DISASTERS. IT'S HOT HERE, BUT THAT CAN BE, THAT CAN BE MONITORED.
WE DON'T HAVE HURRICANES. WE DON'T HAVE FLOODS, WE DON'T HAVE EARTHQUAKES, EARTHQUAKES. AND THEN FINALLY NETWORK EFFICIENCY.
SO DATA CENTERS OBVIOUSLY HAVE TO HAVE ACCESS TO FIBER, AND THEY WANT TO BE AS CLOSE AS POSSIBLE TO THE FINAL END USER.
THIS IS PARTICULARLY RELEVANT FOR AUTOMATED VEHICLES, AUTONOMOUS DRIVING OR VR VIRTUAL REALITY.
SO THEY WANT TO BE LOCATED CLOSE TO KEY MARKETS AND SO THAT THEY LIKED.
PINAL COUNTY, I'M SURE WOULD BE A VERY ATTRACTIVE PLACE FOR THEM TO LOCATE.
THEY LIKE, THEY LIKE THE ARIZONA AREA BECAUSE IT'S CLOSE TO A LOT OF MAJOR CITIES.
[00:15:03]
NEXT SLIDE PLEASE. THERE ARE TWO BASIC TYPES OF DATA CENTERS.AND I'M JUST GOING TO WALK YOU THROUGH THIS REAL QUICK. AND THEN I'M HAPPY TO ANSWER ANY QUESTIONS. AND I SHOULD HAVE SAID THAT AT THE BEGINNING. I SHOULD HAVE EXPLAINED THAT IN ORDER FOR THIS TO BE FUN AND INTERESTING AND ENGAGING, WE'RE HOPING THAT YOU WILL ASK QUESTIONS AND INTERRUPT ALL OF US AT ANY TIME.
AND THAT INCLUDES THE UTILITIES AND MY FRIEND FROM AC AYE.
AT ANY POINT, IF YOU GET TIRED OF LISTENING TO ME DRONE ON, JUST INTERRUPT WITH A QUESTION.
SO THERE ARE TWO. TWO? YES. SO I DO HAVE LOTS OF QUESTIONS, BUT I DON'T WANT TO HIJACK YOUR PRESENTATION.
I THINK WE'RE ALL WAITING TO HEAR WHAT YOU GET TO.
AND THEN WE'LL DO SOME QUESTIONS. SURE.
UNLESS UNLESS WE THINK YOU'RE VEERING OFF OF WHERE A QUESTION MIGHT BE INSERTED.
SO THERE ARE TWO TYPES OF DATA CENTERS, SMALL SCALE.
AND BY THAT I MEAN THAT CAN BE A ROOM IN A BUILDING THAT CAN BE, YOU KNOW, A LOT OF TIMES THERE'S A, A, A SMALL ROOM WITHIN A CORPORATE BUILDING OR A SMALL BUILDING THAT WOULD SERVE A SMALL CAMPUS.
SO PERMISSION TO INTERRUPT WHEN? YEAH. SO, SO YOU'RE NOT JUST TALKING A SERVER.
SOME SOME BIG BUILDINGS HAVE A HUGE SERVER, RIGHT? YOU'RE SAYING THEY'RE BEYOND BEING JUST A SERVER. THEY'RE AN ACTUAL DATA CENTER.
YEAH. AND IT CAN BE A RACK OF DATA SERVERS IN A IN A ROOM, IN A BACK ROOM SOMEPLACE.
BUT THEY'RE USUALLY JUST PROCESSING FOR THE PEOPLE IN THAT BUILDING.
IT'S A VERY SMALL AND AND LOW ENERGY USE, AND THAT'S BEEN HAPPENING FOR A LONG TIME.
IF, YOU KNOW, DATA CENTERS ARE NEEDED FOR ALL KINDS OF PROCESSING OF INFORMATION, BANKING INFORMATION, HOSPITALS, UNIVERSITIES.
WHAT ON THE LARGE SCALE SIDE, THIS IS WHERE WE'RE A LOT OF ENERGY AND EXCITEMENT AND EMOTION HAS ARISEN ON THE LARGE SCALE SIDE.
SO LET ME JUST DESCRIBE BRIEFLY.
AND YOU'RE ALSO YOU'RE GEARING YOUR WHOLE PRESENTATION TOWARDS ARIZONA, BUT THIS IS GOING ON ALL OVER THE WHOLE COUNTRY.
AND IF YOU LOOK IN THE NACO PUBLICATION, EVERY COUNTY IN THE COUNTRY IS BEING BOMBARDED WITH THIS. WE'RE NOT THE ONLY PEOPLE THAT ARE HEARING ABOUT THIS.
SO IT'S ALL OVER. SO SO THAT'S SOMETHING ELSE WE'RE LOOKING AT TOO, WHICH HOPEFULLY WE'LL GET TO.
YES, ABSOLUTELY. THE UNITED STATES IS THE LARGEST HOME OF DATA CENTERS IN THE WORLD.
WE HAVE MORE THAN HALF OF THE DATA CENTERS ARE LOCATED IN IN THE UNITED STATES.
AND JUST GIVEN OUR THIRST FOR AI AND, AND CLOUD SERVICES, WE ANTICIPATE THAT THAT WILL GROW.
BUT IT IS A WORLDWIDE GLOBAL ISSUE.
SO ON THE LARGE SCALE SIDE, THERE'S ENTERPRISE DATA CENTERS, AND THOSE ARE DATA CENTERS THAT ARE OWNED AND OPERATED BY A SINGLE COMPANY.
SO THINK MICROSOFT OR GOOGLE OR META, THEY'LL HAVE A DATA CENTER.
IT'S THEIR DATA CENTER. THEY BOUGHT, THEY BOUGHT THE LAND.
THEY CONSTRUCTED THE DATA CENTER. THEY OWN EVERYTHING IN IT, A CO-LOCATION FACILITY, I THINK, OR A CO-LOCATED THEY'RE ESSENTIALLY BUILDING THE BUILDING AND THEN THEY'RE LEASING OUT SPACE WITHIN THE BUILDING.
AND SO YOU CAN WALK IN ONE OF THOSE.
AND IT'S VERY INTERESTING BECAUSE THEY HAVE, IT'S A VERY LARGE BUILDING AND THEY'LL HAVE CHAIN LINK FENCES AND SERVERS BEHIND THOSE CHAIN LINK FENCES.
AND THAT BELONGS TO ONE ONE CLIENT.
AND THEN BEHIND ANOTHER FENCE IS ANOTHER CLIENT.
SO IT'S A LARGE BUILDING, BUT IT'S IT'S A SHARED USE AND IT'S LEASED TO DIFFERENT TYPES OF CLIENTS. AND THEN FINALLY THERE'S HYPERSCALE AND THOSE ARE VERY LARGE CAMPUSES OF DATA CENTERS.
THIS MIGHT BE HELPFUL HAVING BEEN IN THE UTILITY INDUSTRY.
I THINK IT'S HELPFUL SOMETIMES TO EXPLAIN TO PROVIDE A LITTLE BIT OF CONTEXT.
SO IF YOU THINK ABOUT A WALMART OR A TARGET SUPERCENTER, SO THINK ABOUT THAT SIZE, THE LOAD OF THAT IS ONE MEGAWATT, ABOUT ONE MEGAWATT. OKAY, SO WHEN I WORKED AT SRP, WE WOULD BE OVERJOYED IF WE GOT A 25 MEGAWATT LOAD.
WE WERE THRILLED. THAT'S SO EXCITING.
2525 WALMART'S. THAT IS AWESOME.
WHAT'S HAPPENING NOW IN THESE HYPERSCALE DATA CENTERS IS THEY'RE LOOKING AT 300MW, 500MW, 1000MW OR A GIGAWATT.
AND SO IF YOU THINK ABOUT THAT, THAT'S USING THE SAME ENERGY AS A THOUSAND WALMART OR A THOUSAND TARGET SUPERCENTERS.
SO I HOPE, HOPEFULLY THAT HELPS YOU UNDERSTAND JUST HOW LARGE THESE ENTITIES CAN BE. AND I'M SURE MY UTILITY FRIENDS WILL TALK A LITTLE BIT ABOUT THE CHALLENGES OF SERVING, YOU KNOW, LOADS THAT CAN THAT CAN GROW TO BE THAT LARGE.
AND JUST FOR CLARIFICATION, I MEAN, THE CO-LOCATION, YOU KNOW, YOU SAY IT'S A DATA CENTER. WE USED TO CALL THEM SERVER FARMS, RIGHT? I MEAN, TEN YEARS AGO THAT WAS A SERVER FARM, SERVER FARM. AND YOU WALK IN AND SURE ENOUGH, YOU'RE LOOKING AT YOUR CHAIN LINK FENCE.
[00:20:02]
GROUPINGS OF SERVERS. THAT'S ALL IT IS.RIGHT. SO THIS IS MY LAST SLIDE.
THE NEXT ONE IS MY LAST SLIDE.
AND THIS IT SOUNDS LIKE YOU'VE ALREADY BEEN INSIDE OF A DATA CENTER.
SO YOU'VE SEEN IT. THERE WE GO.
SO YOU'VE SEEN IT BUT IT'S JUST ROWS AND ROWS OF SERVERS IN STACKED IN RACKS.
AND THERE'S A VERY, THEY CREATE A LOT OF HEAT.
AND SO THEY OFTEN HAVE FANS THAT RUN IN THOSE, IN THOSE CORRIDORS TO TRY TO KEEP THE EQUIPMENT COOL.
THIS PICTURE AT THE BOTTOM IS ESSENTIALLY A HYPERSCALE DATA CENTER.
SO IT'S TRYING TO DEPICT A CAMPUS OF DATA CENTER.
SO IT LOOKS LIKE THAT IT CAN TAKE UP A FAIR AMOUNT OF LAND USE.
AND THEY'RE ALL CO-LOCATED IN ONE SPACE.
SO THAT THAT'S MY DATA CENTER 101.
HAPPY TO ANSWER ANY QUESTIONS OR I'LL TURN IT OVER TO, TO MY COLLEAGUE SARAH PORTER TO TALK ABOUT WATER WITH YOUR BIG SURPRISE.
ANY QUESTIONS FROM THE BOARD SO FAR? YES. NO. OKAY. OKAY, HERE WE GO.
ALL RIGHT. THANK YOU VERY MUCH.
SO CAN WE GO TO THE NEXT SLIDE? COULD YOU PLEASE. ARE YOU WHO'S DRIVING THE SLIDES.
WE ARE AUTOPILOT. THERE WE GO.
SELF-DRIVING. JUST SAY NEXT SLIDE.
BUT WOULD YOU PLEASE INTRODUCE YOURSELF. I'M SARAH PORTER.
I AM THE DIRECTOR OF THE KYLE KYLE CENTER FOR WATER POLICY AT ARIZONA STATE UNIVERSITY'S MORRISON INSTITUTE. AND I'M VERY HAPPY TODAY TO COME AND TALK WITH YOU ABOUT THIS ISSUE.
THAT HAS CERTAINLY BECOME AN ISSUE THAT MANY, MANY PEOPLE, MEMBERS OF THE PUBLIC PEOPLE INVOLVED WITH WATER MANAGEMENT AND UTILITIES HAVE BEEN PAYING ATTENTION TO.
AND I, THERE'S NEVER BEEN AN ISSUE IN MY 11 YEARS AS THE DIRECTOR OF THE KYL CENTER FOR WATER POLICY THAT THAT, YOU KNOW, I'VE SEEN AROUSE MORE CONCERN.
AND I'LL SAY THAT THAT CONCERN ABOUT DATA CENTERS COMING IN AND USING UP ALL OUR WATER IS HOW I HEAR IT IS UNDERSTANDABLE BECAUSE WE'RE FACING SOME NEW PRESSURES HERE IN PINAL COUNTY UP IN PHOENIX. WE'RE LOOKING AT DEEP CUTS OF COLORADO RIVER SUPPLIES DEEPER CUTS THAN WE'VE EVER EXPERIENCED.
PINAL COUNTY HAS ALREADY EXPERIENCED THE CUTS TO DATE MORE THAN ANY OTHER PLACE.
AND WE'RE ALSO LOOKING AT THE LIMITATIONS, THE THE PHYSICAL LIMIT OF GROUNDWATER.
AND WE HAVE A MORATORIUM ON SOME TYPES OF LOCAL GROUNDWATER RELIANT DEVELOPMENT THAT YOU'RE ALL I'M SURE FAMILIAR WITH.
I KNOW SUPERVISOR MILLER IS EXTREMELY FAMILIAR WITH THOSE THINGS.
SO IT'S UNDERSTANDABLE THAT WHEN PEOPLE ARE HEARING ABOUT LIMITATIONS RELATED TO WATER, THAT THERE WOULD BE A GREAT DEAL OF CONCERN ABOUT BRINGING IN A NEW INDUSTRY THAT'S REPUTED TO BE VERY WATER INTENSIVE.
WE THE KYL CENTER FOR WATER POLICY IS PART OF A.
KELLY'S GROUP DID A BIG INVESTIGATION ON THE USE OF WATER FOR INDUSTRIAL PURPOSES.
THE TRENDS. WHAT WHAT ARE WE LOOKING AT? AND THAT WOULD INCLUDE DATA CENTERS.
IT WOULD INCLUDE OTHER INDUSTRIES.
AND WE PUBLISHED THIS IN FEBRUARY.
AND HERE'S MY THE PUNCH LINES FROM THAT.
RIGHT NOW, THE USE OF WATER FOR DATA CENTERS OR OTHER INDUSTRIAL PURPOSES IN THE PHOENIX ACTIVE MANAGEMENT AREA AND THE PINAL ACTIVE MANAGEMENT AREA AND IN THE TUCSON ACTIVE MANAGEMENT AREA. THE SIP SERVICE AREA IS NOT A CONCERN.
IT'S ALSO VERY HARD TO QUANTIFY THE USE OF WATER BY DATA CENTERS.
NOW WE DID OUR BEST. I'LL GET TO THAT.
BUT I'LL SAY IT'S A MOVING TARGET BECAUSE THE TECHNOLOGY, THE EFFICIENCY, ALL OF THAT IS RAPIDLY, RAPIDLY CHANGING.
AND THEN FINALLY, IT'S A VERY SITE SPECIFIC DETERMINATION.
AS KELLY SAID, WHETHER OR NOT A DATA CENTER SHOULD USE ANY WATER AT ALL, IT REALLY IS WILL DEPEND ON THE RESOURCES AVAILABLE AT THAT SITE.
OTHER CONSIDERATIONS ABOUT HOW HOW MUCH ENERGY IS AVAILABLE, ALL KINDS OF OTHER THEIR CONSIDERATION.
SO AS THAT SLIDE BEFORE SAID, WE ARE NOT TRYING TO MAKE A RECOMMENDATION, YES OR NO. AS TO DATA CENTERS, WE'RE SIMPLY TRYING TO PROVIDE INFORMATION THAT'S HELPFUL IN YOUR OWN EVALUATION OF THE APPROPRIATENESS.
YES, SIR. SO WOULD YOU SAY THAT THE TECHNOLOGY AND THE ADVANCEMENTS THAT'S BEEN MADE, ARE WE LOSING USING LESS WATER? YES. AND WE CAN GO AHEAD TO THE NEXT SLIDE.
YES. AND THEN WHILE YOU'RE TALKING, I DON'T KNOW MAYBE THIS IS PART OF YOUR PRESENTATION, BUT I THINK WE'VE GOT A LOT OF PROPERTIES AND THINGS OUT HERE THAT HAVE ALREADY BEEN ENTITLED.
SO A LOT OF MORE HOMES THAT ARE GOING TO BE BUILT OUT IN THIS AREA.
AND WHEN WE TALK ABOUT WATER, WE EQUATE IT TO HOW MANY HOMES OR HOW MANY,
[00:25:05]
HOW MANY INDIVIDUALS ARE GOING TO BE UTILIZING THE WATER, SO ON AND SO FORTH. IS THERE ALTERNATIVES WITH THAT? ANYWAY, HOW MANY HOW MANY HOUSEHOLDS? IF YOU WERE TO REPLACE A DATA CENTER, FOR HOW MANY HOUSEHOLDS WOULD THAT REPLACE? SO THIS IS VERY HARD TO ANSWER BECAUSE SOME DATA CENTERS USE A LOT OF WATER AND SOME DON'T USE MUCH. AND YOU, I LIKE TO THINK ABOUT AN ACRE FOOT, A NICE VOLUMETRIC FOR THINKING ABOUT WATER, AN ACRE OF LAND COVERED WITH A FOOT OF WATER.AN ACRE FOOT IS 325,851 GALLONS OF WATER, ROUGHLY 326,000 GALLONS.
AND IN A PLACE LIKE THE NEW DEVELOPMENTS COMING IN AROUND HERE, THREE AND A HALF HOMES WILL USE ONE ACRE FOOT OF WATER PER YEAR ON AVERAGE, AND A GOOD DEAL OF THAT.
ALL OF THE WATER USED INDOORS CAN BE RECLAIMED, SO 30 TO 50 EVEN MORE, A GREATER PERCENTAGE OF THAT WATER CAN BE RECLAIMED IN A DATA CENTER THAT'S USING EVAPORATIVE COOLING DEPENDING ON ITS SIZE.
YOU KNOW, DEPENDING ON THE HEAT, IT'S VERY SEASONAL.
IT MIGHT BE USING THREE ACRE FEET IN A DAY.
IF IT'S A MASSIVE DATA CENTER, A SMALLER DATA CENTER USING EVAPORATIVE COOLING WOULD BE USING LESS, YOU KNOW, DEPENDING ON.
AND THAT'S EVAPORATIVE COOLING IS THE HIGHEST FORM.
BUT WHAT I, YOU KNOW, MY THE BEST ANSWER TO YOUR QUESTION WOULD BE LOOK AT THE DATA CENTER, LOOK AT WHAT ARE THEIR PROJECTIONS FOR WATER USE, AND THEN COMPARE IT TO THREE AND A HALF HOMES PER ACRE FOOT.
OKAY. REMEMBERING THAT ALL ALL OF THE WATER USED INDOORS IN A HOUSEHOLD CAN BE RECLAIMED.
WHEREAS IF A DATA CENTER IS USING WATER FOR EVAPORATIVE COOLING, NONE OF THAT WATER CURRENTLY IS LIKELY TO BE RECLAIMED BECAUSE THE TECHNOLOGY TO DO THAT IS REALLY EXPENSIVE, I.
BUT TECHNOLOGY HAS CHANGED WHERE WE'RE KIND OF CHANGING, EVOLVING AWAY FROM THE EVAPORATIVE PROCESS SO I CAN DO ANOTHER.
OKAY. OKAY. SO SO WHEN WE'RE TALKING ABOUT DATA CENTER WATER IS, I THINK EVEN IN POWER GENERATION, EITHER MOVING AWAY FROM.
AND WE'LL. AND WE CAN TALK ABOUT FOR YOUR ACRE FOOT, ARE YOU SEEING THREE AND A HALF HOMES? AND I READ IN SOME REPORTS WHERE IT'S TWO HOMES, TWO AND A HALF HOMES, YOU'RE SEEING THREE AND A HALF HOMES.
SO, YOU KNOW, I LOOK AT I KIND OF LOOK AT THAT LIKE IT'S ACCOUNTING.
WHAT NUMBER DO I WANT TO SEE AT THE END? AND IT'S, IT'S JUST LIKE, YEAH, I LIVE IN AN OLD PART OF PHOENIX WHERE WE USE MORE THAN A LESS THAN A THIRD OF AN ACRE FOOT, LIKE DEPENDING ON THE NEIGHBORHOOD.
THERE ARE ALL KINDS OF VARIABLES.
OF COURSE, THE THREE AND A HALF HOMES PER ACRE FOOT IS THE DEPARTMENT OF WATER RESOURCES ESTIMATE OF THE AVERAGE WATER USE BY HOMES IN SINGLE FAMILY HOMES IN ARIZONA.
OKAY, BUT THAT'S AN AD NUMBER FROM THE DEPARTMENT OF WATER RESOURCES TO MAKE SURE.
YEAH, I DIDN'T MAKE IT UP. OKAY.
OF COURSE, THERE ARE NEIGHBORHOODS WHERE IT'S MUCH HIGHER THERE. THERE ARE NEIGHBORHOODS WHERE IT'S MUCH, MUCH LOWER.
WE ACTUALLY HAVE A, OH, MAYBE I CAN SEND A LINK TO A TOOL THAT WILL ALLOW YOU TO LOOK AT, IF YOU WANT TO THINK ABOUT THE WATER USE PER ACRE. WE AT THE KYLE CENTER HAVE DEVELOPED A MAP THAT SHOW YOU THE WATER USE PER ACRE IN ALL OF THE CITIES IN THE CAP SERVICE AREA.
AND I CAN SAY THAT THERE ARE SOME CITIES THAT HAVE A.
THEY WERE HISTORICALLY FARMED IN THE SRP WATER SERVICE AREA.
THEY HAVE A VERY HIGH WATER USE PER ACRE, CLOSER TO THREE ACRE FEET PER ACRE.
AND THEN THERE ARE CITIES LIKE HERE AROUND HERE.
AND APACHE JUNCTION WOULD BE AN EXAMPLE.
PARTS OF TUCSON WHERE IT'S LESS THAN ONE ACRE FOOT PER ACRE.
SO IT REALLY VARIES DEPENDING ON THE, YOU KNOW, HOW IS THE LAND BEING USED RIGHT NOW.
BUT THANK YOU VERY MUCH. SO JUST EXCUSE ME.
I'M SORRY. ON THE WATER SIDE OF IT.
YOU KNOW, YOU HEAR ABOUT CLOSED LOOP SYSTEMS AND OH, THEY DON'T USE ANY WATER AT ALL.
WELL, I WATCHED PROBABLY OVER 200 VIDEOS FROM INDEPENDENT JOURNALISTS WHO KEEP.
WELL, BECAUSE WE'RE GETTING BOMBARDED WITH GOOD FOR YOU.
BUT IN DOING SO, I'M WATCHING THESE VIDEOS AND I'M SCRATCHING MY HEAD BECAUSE I KEEP HEARING THE WORD CLOSED LOOP SYSTEMS, WHICH SOUNDS GREAT.
KIND OF LIKE OUR I KNOW NO ONE MAKE FUN OF MY NEW YORK ACCENT, A RADIATOR THAT IT JUST KEEPS USING IT RIGHT.
I GET IT. IT DOES EVAPORATE SOME OF IT, AND IT HAS TO BE REPLENISHED LITTLE BY LITTLE. BUT THEN I ALSO HEAR ABOUT THE WATER CONTAMINATING THESE, ESPECIALLY IN VIRGINIA.
THESE MEGA CENTERS WERE CONTAMINATING THE WATER.
HOW IS THAT HAPPENING? IF IT'S A CLOSED LOOP SYSTEM, AND WHERE IS THAT WATER GOING TO CONTAMINATE THE WATER? SO IF THAT IS HAPPENING, THAT'S A FAILURE OF THE TREATMENT.
THEY'RE OFTEN WITH DIFFERENT SYSTEMS. AND I DON'T THINK, AND I'M NOT SURE I HAVEN'T WATCHED THOSE VIDEOS,
[00:30:02]
BUT A CLOSED LOOP SYSTEM SHOULDN'T.EVAPORATIVE COOLING WILL PRODUCE A BRINE.
AND IF THERE IS A FAILURE OF PROPER WASTEWATER TREATMENT, THERE'S A POTENTIAL FOR CONTAMINATION.
I HAVE NEVER HEARD OF THAT HAPPENING IN CONNECTION WITH A DATA CENTER IN ARIZONA.
BUT THAT'S JUST ALL ABOUT ARE YOU IS THE WATER BEING APPROPRIATELY TREATED BEFORE IT'S PUT INTO THE WASTEWATER TREATMENT STREAM? AND THEN, YOU KNOW, WORKING WITH THE, THE ENTITY THAT'S DOING THE WASTEWATER TREATMENT, TYPICALLY THE WATER PROVIDER, A CITY, MAYBE IN PIMA COUNTY, IT'S PIMA COUNTY, BUT THAT'S REALLY ABOUT WASTEWATER TREATMENT. TYPICALLY A WASTE WATER ISN'T JUST INJECTED.
WE HAVE STATE REGULATION BY THE DEPARTMENT OF ENVIRONMENTAL QUALITY THAT THAT WOULD BE THAT IS THERE TO PREVENT THAT KIND OF CONTAMINATION FROM HAPPENING.
OKAY. BECAUSE, YOU KNOW, WE HAVE TOMORROW WE HAVE A PLANNING AND ZONING MEETING. YOU NEVER HEAR ANYTHING ABOUT WASTEWATER TREATMENT IN WHEN THESE DATA CENTERS COME TO SPEAK BEFORE US.
YEAH. SO AGAIN, NOW I'M LEARNING EVEN MORE.
AND AGAIN, THERE'S A MEETING TOMORROW THAT THESE QUESTIONS NEED TO BE ASKED BECAUSE THEY WANT US TO DO A COMPREHENSIVE PLAN CHANGE, AND THEN THEY WANT TO DO A ZONING CHANGE. BUT WE'RE NOT GETTING ANY OF THESE ANSWERS BECAUSE WE DON'T KNOW THE QUESTIONS TO ASK.
IF THEY WANT TO INJECT BRINE BACK INTO THE AQUIFER, THEY HAVE TO GET A PERMIT FROM THE DEPARTMENT OF ENVIRONMENTAL QUALITY TO DO THAT.
SO THAT WOULD BE THAT WOULD BE THE BIGGEST RISK OF CONTAMINATION.
IF THEY'RE PUTTING WATER INTO A WASTEWATER TREATMENT SYSTEM, THEN THE ENTITY THAT TAKES THAT WATER WILL HAVE.
THEY ALSO HAVE TO SATISFY EPA REGULATIONS, AND THEY WILL REQUIRE THAT BEFORE THAT WATER IS PUT INTO THE WASTEWATER TREATMENT SYSTEM, IT PROBABLY HAS TO BE TREATED TO A CERTAIN QUALITY IF THERE'S ANY KIND OF RISK.
SO. SO BACK TO THIS PRESENTATION.
I APPRECIATE THE QUESTIONS VERY MUCH.
AND SOME OF THOSE ARE, YOU KNOW, ONES THAT WE HAVEN'T HEARD BEFORE, LIKE CONTAMINATION. BUT REALLY THERE ARE TWO WAYS THAT DATA CENTERS USE WATER.
ONE IS THROUGH A COOLING, OFTEN EVAPORATIVE COOLING, AND THE OTHER IS THROUGH BECAUSE IT TAKES WATER TO GENERATE ELECTRICITY.
NOT ALL TYPES, BUT SOME TYPES OF ELECTRICITY.
AND SO THOSE ARE THE TWO USES OF WATER THAT PEOPLE, YOU KNOW ARE ASKING QUESTIONS ABOUT.
NEXT SLIDE PLEASE. WE'VE ALREADY KIND OF TALKED ABOUT THIS, BUT ESSENTIALLY THERE ARE HUGE GAINS IN THE EFFICIENCY OF COOLING FOR FOR DATA CENTERS.
AND THEY'RE REALLY IN TWO WAYS.
ONE IS THAT CHIPS CAN OPERATE AT HIGHER AND HIGHER TEMPERATURES.
SO THERE ISN'T A NEED TO COOL THEM AS LOW AS THEY USED TO BE.
AND THAT IS EVOLVING ALMOST AS WE SPEAK.
WE HAD AT THAT SYMPOSIUM THAT KELLY MENTIONED.
WE HAD AN ASU SCIENTIST TALK ABOUT THIS WORK, THAT HE'S DOING, THIS RESEARCH TO RAISE THE TEMPERATURE OF CHIPS.
AND THEN THERE ARE THESE VARIOUS TYPES OF COOLING THAT ARE CURRENTLY, YOU KNOW, MUCH MORE EFFICIENT THAN TRADITIONAL EVAPORATIVE COOLING, INCLUDING THE CLOSED LOOP SYSTEMS. THERE ARE OTHER VERY LIKE THE CHIPS IN WATER.
YOU KNOW, THERE ARE ALL KINDS OF DIFFERENT SYSTEMS. AND I'M A LAWYER, NOT AN ENGINEER.
SO I'M NOT GOING TO GO INTO DETAILS.
SOMETIMES THE COOLING SYSTEM THAT THAT IS GOING TO WORK BEST FOR A PARTICULAR SITE IS DRIVEN BY POWER CONCERNS.
SO AN EXAMPLE MIGHT BE A DATA CENTER.
THERE'S ONE PROPOSED FOR PHOENIX THAT PROPOSES TO USE A COMBINATION OF AIR COOLING ALL POWER WHERE THE WATER USE IS WAY OFF WHEREVER THE POWER IS BEING GENERATED, OR MAYBE IT'S SOLAR OR RENEWABLE AND NOT USING WATER.
AND THEN BUT THEY ALSO WANT TO HAVE EVAPORATIVE COOLING IN ORDER TO REDUCE THE LOAD ON VERY HOT DAYS.
SO THEY WANT TO HAVE THIS HYBRID SYSTEM WHERE THEY'RE DOING A LITTLE BIT OF EVAPORATIVE COOLING ON VERY HOT DAYS SO THAT THE UTILITY ISN'T BURDENED WITH SUCH A HIGH PEAK DEMAND.
AND AS FAR AS I CAN TELL, THAT PARTICULAR ARRANGEMENT DOESN'T PRESENT A WATER PROBLEM. THERE IT'S IT'S SOME AMOUNT OF WATER IN ORDER TO MITIGATE POWER PEAK.
SO THAT'S JUST AN EXAMPLE OF WHERE YOU MIGHT HAVE A, A LITTLE HIGHER WATER DEMAND IN ORDER TO MEET A PARTICULAR GOAL THAT THEY NEED TO MEET AT THAT PARTICULAR SITE. NEXT SLIDE PLEASE.
SO ON THE SO THAT'S KIND OF DIRECT AND INDIRECT USE.
THINKING ABOUT THE WATER FOR THE INDIRECT USE FOR GENERATION OF ELECTRICITY.
THIS IS AN AREA WHERE THERE'S, YOU KNOW, THERE'S BEEN AN EXPRESSION OF PUBLIC CONCERN. AND IT IS, AGAIN, A BIT OF A MOVING TARGET.
[00:35:04]
BUT WHAT WE CAN, YOU KNOW, WE CAN THINK ABOUT THE WATER CONSUMPTION FACTOR OF DIFFERENT TYPES OF ELECTRIC POWER PRODUCTION.AND YOU KNOW, I LIKE TO PUT IT INTO PERSPECTIVE TO POINT OUT THAT THE USE OF WATER FOR THE GENERATION OF ELECTRICITY IN THE STATE OF ARIZONA REPRESENTS 3% OF TOTAL DEMAND FOR WATER IN THE STATE.
YOU KNOW, AGRICULTURE FAMOUSLY REPRESENTS OVER 70% OF DEMAND.
ALL THE WATER THAT'S DELIVERED TO TAPS FOR CITIES AND BUSINESSES IN THE STATE OF ARIZONA IS APPROXIMATELY 20% DEMAND.
POWER GENERATION REPRESENTS A VERY SMALL FRACTION OF DEMAND IN THE STATE.
IN THE REPORT THAT I MENTIONED, YOU KNOW, WE DISCUSSED THAT PROBABLY AS THE ECONOMY EVOLVES, THERE'S A POSSIBILITY THAT AT SOME POINT, POWER GENERATION WILL REPRESENT A HIGHER PIECE OF THE PIE, MORE POWER DEMAND. BUT THE QUESTION ABOUT, OH, THIS DATA CENTER IS GOING TO USE SO MUCH ELECTRICITY, AND IT'S GOING TO REQUIRE A LOT OF WATER TO GENERATE IS VERY HARD TO TO REALLY NARROW DOWN BECAUSE IT'S VERY HARD TO TRACE WHERE THE ELECTRONS COME FROM.
DO THEY COME FROM SOLAR ENERGY, WHICH IS ALMOST A NO WATER FORM OF POWER GENERATION? DO THEY COME FROM A POWER GENERATION THAT'S USING A HIGH DEGREE OF WATER, AND DO THEY COME FROM ANOTHER PLACE, A WATER RICH PLACE SOMEWHERE ON THE ON THE GRID? SO THAT'S SORT OF OUR, OUR, YOU KNOW, OUR CONCLUSION WHEN WE'RE THINKING ABOUT THE INDIRECT WATER USE FOR DATA CENTERS IS KEEP AN EYE ON WHAT'S HAPPENING WITH THE POWER PORTFOLIO OF THE UTILITY IN QUESTION.
A PSSRP TUCSON ELECTRIC ARE ALL MOVING LOWER AND LOWER IN TERMS OF THEIR WATER PER MEGAWATT OF PRODUCTION AS THEY MOVE TO NATURAL GAS AND RENEWABLES.
SO WE'RE JUST IT'S JUST ONE OF THOSE THINGS WHERE WE SORT OF SAY, KEEP AN EYE ON IT. BUT RIGHT NOW IT DOESN'T IT DOESN'T PRESENT A LOSS OF WATER RESILIENCE OR WATER INSECURITY FOR THE REGION.
WHAT HAPPENS IF YOU HAVE BEHIND THE METER GOING ON.
WELL, BEHIND THE METER IS COMPLICATED.
BUT IT WOULD AGAIN IF I WERE JUST LOOKING AT IT FROM A WATER PERSPECTIVE, I WOULD ASK HOW MUCH, YOU KNOW, IS IT A FORM OF POWER GENERATION BEHIND THE METER THAT IS GOING TO BE WATER CONSUMPTIVE? AND THEN I WOULD LOOK AT THAT WATER CONSUMPTION AND SAY, WHAT IS THE WATER SUPPLY FOR THAT? WHO ARE THE OTHER PEOPLE WHO MAY BE IMPACTED BY THAT WATER CONSUMPTION? AND I THINK KELLY CAN TALK ABOUT THE REASONS WHY BEHIND THE METER ISN'T SOMETHING WE'RE SEEING A LOT OF IN THE STATE OF ARIZONA.
SO RICH HAS BEEN WATCHING MORE YOUTUBE THAN I HAVE, SO I EXPLAIN TO ME BEHIND THE METER.
I'M LOST ON THAT ONE. WELL, THAT WOULD BE WHERE THE DATA CENTER IS PRODUCING ITS OWN POWER AND NOT EVEN NOT EVEN FEEDING INTO THE GRID.
AND AS, AND I MIGHT GET THIS MIXED UP A LITTLE BIT, BUT ESSENTIALLY THE TAX, THE USE TAX BREAKS THAT DATA CENTERS BENEFIT FROM IN ARIZONA AREN'T AVAILABLE UNLESS I THINK THIS IS RIGHT, UNLESS THEY'RE CONNECTED INTO THE GRID.
SO THERE'S A HUGE DISINCENTIVE BECAUSE THOSE USE TAX BREAKS ARE VERY SIGNIFICANT.
SO SO THIS ISN'T SOMETHING THAT WE'RE SEEING IN ARIZONA.
GO FOR IT. YEAH. ACTUALLY THEY THEY LOSE THE TAX BREAK IF IT'S CONNECTED TO THE GRID AND THEY THEY SELL ELECTRONS OFF OF THE DATA CENTER PROPERTY.
SO IF THEY'RE GOING TO PROVIDE THEIR OWN GENERATION BEHIND THE METER.
THEY HAVE TO REALLY ISLAND THEMSELVES OFF, WHICH IN OUR EXPERIENCE, DATA CENTERS ARE NOT THAT INTERESTED IN DOING BECAUSE, YOU KNOW, YOU WRITE, YOU HAVE TO BUILD A LOT OF EXTRA POWER BECAUSE AT SOME POINT ONE OF THOSE NATURAL GAS UNITS MAY GO DOWN.
THEY JUST REALLY WOULD PREFER, I THINK, TO RELY ON THE UTILITY FOR SERVICE.
SO YOU'RE BASICALLY TALKING ABOUT WHAT I'M TRYING TO DO AT MY CABIN BEHIND THE METER.
GOT IT. SO SO WHAT I WANTED TO ASK ON THAT THOUGH IS HOW WOULD WE REGULATE OR KNOW IF THEY ARE. BECAUSE I NO ONE'S COMING AND THEY'RE GOING TO ASK.
THAT'S GOING TO COME BEFORE US. HOW DO WE REGULATE THE WATER? YOU WOULD FIRST OF ALL, IT'S HARD.
WELL, IT'S A VERY GOOD QUESTION.
HERE IN PINAL COUNTY AND THIS IS LATER IN A SLIDE, BUT I'M GOING TO GET TO IT IN PINAL COUNTY.
IS THAT A SURPRISE? LIKE IF YOU HAVE A NEW USE FOR A LARGE VOLUME OF WATER, IT IS CHALLENGING. THERE ARE LIMITED OPTIONS.
WE'RE LOOKING AT CUTS IN SEA WATER AND THE.
AND THE ENTITIES THAT HAVE ENTITLEMENTS TO CAP WATER ARE SCRUTINIZING VERY CAREFULLY ANY NEW NEW LARGE VOLUME USER.
IF THEY HAVE THE WATER, THEY'RE THINKING, WHAT IS THE OPPORTUNITY
[00:40:02]
COST? AND AND THEY KNOW THEY'RE GOING TO BE EXPERIENCING CUTS.WE HAVE LIMITATIONS ON DEVELOPMENT USING THE ONLY OTHER.
WELL, THERE'S RECLAIMED WATER, BUT LET'S GET.
THE OTHER BIG WATER SUPPLY IS WATER IN THE GROUND, GROUNDWATER. YOU CAN TECHNICALLY, YOU COULD BE A DATA CENTER DEVELOPER, AND YOU COULD GO TO THE STATE OF ARIZONA AND GET A PERMIT FOR AN INDUSTRIAL USE.
WELL, TO WITHDRAW GROUNDWATER TO COOL A DATA CENTER, THAT WATER WOULD NOT HAVE TO BE REPLENISHED.
AND SO THAT IS THAT IS A QUESTION THAT I WOULD BE ASKING A DATA CENTER DEVELOPER IF THEY WERE PLANNING TO USE AN REPLENISHED GROUNDWATER.
I'D WANT TO KNOW HOW MUCH, AND I'D WANT TO KNOW.
YOU KNOW, I'D THINK ABOUT WHAT ARE THE OTHER GROUNDWATER USES IN THE AREA.
THE STATE ACTUALLY HAS THE AUTHORITY TO LIMIT THOSE PERMITS.
THE DIRECTOR OF WATER RESOURCES HAS THE AUTHORITY TO LIMIT THOSE PERMITS.
I THINK I HAVE THE OFFICIAL LANGUAGE LATER IN A SLIDE. BUT ESSENTIALLY IF HE IF HE CONCLUDES THAT ISSUING THE PERMIT WOULD GET IN THE WAY OF THE STATE MEETING THE GOALS FOR THE GROUNDWATER REGULATION IN PLACE.
SO THAT'S IT'S THESE ARE QUESTIONS THAT ARE QUESTIONS THAT NEED TO BE ASKED OF ANY DATA CENTER DEVELOPER THAT'S PROPOSING TO USE WATER, EITHER FOR ENERGY OR COOLING.
BUT I'LL ALSO SAY, COMPARED TO WHAT PINAL COUNTY IS HISTORICALLY AN AGRICULTURAL REGION VERY OFTEN. WHATEVER IS GROWN WILL USE PROBABLY.
YOU KNOW, THEY MAY IT MAY BE USING A SIMILAR AMOUNT OF WATER PER ACRE.
SO I'M HAPPY TO HELP YOU WITH COMPARISONS.
I DIDN'T BRING THEM ALONG, BUT YOU'D WANT TO LOOK AT LIKE, WELL, OKAY, IT'S GOING TO USE A LOT OF WATER, BUT COMPARED TO WHAT? AND THEN WEIGH THE THE COSTS AND BENEFITS, HAVING THAT INFORMATION.
OKAY. SO YEAH, IN SAYING THAT, SO I CAN COME TO YOU WHEN A DATA CENTER COMES TO US AND TELLS US THEY'RE USING X AMOUNT OF WATER, I CAN COME TO YOU AND YOU CAN TELL ME WHETHER IT'S TRUE OR FALSE.
NO, I COULDN'T VERIFY ANYTHING A DATA CENTER SAYS, BECAUSE THAT'S OF COURSE, INFORMATION THAT THEY HAVE EXCLUSIVE ACCESS TO. BUT WHAT I CAN TALK ABOUT IS WHAT ARE OTHER WATER REQUIREMENTS FOR DIFFERENT LAND USES? I HAVE A LOT OF DATA ABOUT THAT.
BUT YEAH, AT SOME POINT YOU'RE, YOU KNOW, IF SOMEBODY IS PROPOSING TO DIG A WELL, THEN IT WOULD BE UP TO THE DEPARTMENT OF WATER RESOURCES, REALLY TO VERIFY WHETHER OR NOT THAT WELL, YOU KNOW, IS GOING TO BE ABLE TO PUMP THAT WATER OUT.
THERE'S A VERY WELL DEVELOPED GROUNDWATER MODEL FOR FOR THIS REGION, FOR THE FINAL ACTIVE MANAGEMENT AREA.
AND SO THE DEPARTMENT OF WATER RESOURCES WOULD HAVE THE COMPETENCE TO GIVE YOU SOME REALLY GOOD INFORMATION ABOUT THAT.
SO IT'S FAIR TO TO SAY THEN THAT ANY OF THESE DATA CENTERS, JUST LIKE ANY DEVELOPMENT THAT TAKES PLACE ON A, ON A, ON A RESIDENTIAL DEVELOPMENT, THEY HAVE TO GO THROUGH ADW, THEY HAVE TO GO THROUGH ALL THE PROCESSES AND EVERYTHING TO, TO PROVE THAT THEY'VE GOT THE WATER SUPPLY, TO BE ABLE TO MEET THE DEMANDS IF THEY ARE GOING TO USE LOCAL GROUNDWATER, IF THEY'RE GOING TO USE A WELL AND PUMP GROUNDWATER OUT FOR THE DATA CENTER, THEN THEY WOULD NEED TO GET A PERMIT FROM THE DEPARTMENT OF WATER. THAT WILL BE THAT'S ALL SPELLED OUT ALREADY, CORRECT? NO QUESTION THERE. WELL, DRILLER WON'T DRILL A WELL UNLESS THEY HAVE THE PERMIT. WE JUST NEED TO MAKE SURE OF THAT WHEN THEY COME IN. RIGHT NOW IF THEY'RE GOING TO A WATER PROVIDER, YOU KNOW, LET'S SAY ARIZONA WATER SAYS, SURE, WE'VE GOT THE WATER, THEN THAT'S UP TO REALLY UP TO THE WATER PROVIDER TO, TO VERIFY AND BE, YOU KNOW, OKAY, TO SCRUTINIZE. BUT THERE, THERE ARE A LOT OF MECHANISMS IN PLACE.
YEAH. OKAY. SO WE'VE NOT LEFT HIM LOOKING AT YOUTUBE THEN.
YEAH. WELL, I MEAN, I THINK IT'S, I GUESS WHAT YOUR QUESTIONS ARE ALL SPOT ON, BUT THE REALITY IS WE'RE A SCARCE WATER STATE.
SO WE ALREADY HAVE A BIG REGULATORY FRAMEWORK AROUND NEW HIGH VOLUME WATER USES.
SO EVEN MORE SO THAN ANY OTHER STATE, I WOULD SAY.
I MEAN, I THINK TO SOME EXTENT THAT'S A FAIR STATEMENT.
I WOULD SAY THAT OURS ARE VERY WELL TAILORED TO MEET THE NEEDS OF THE STATE.
YOU KNOW, ESPECIALLY WE'RE PARTICULARLY FORTUNATE BECAUSE WE'RE HERE.
WE ARE IN PINAL COUNTY ACTIVE MANAGEMENT AREA.
SO THIS IS AN EXTREMELY HIGHLY REGULATED AREA COMPARED WITH OTHER EVEN OTHER PARTS OF ARIZONA AND OTHER STATES WHERE IF YOU OWN THE LAND, YOU CAN DRILL A WELL AND USE AS MUCH WATER AS YOU WANT.
YOU CAN'T DO THAT IN PINAL COUNTY ACTIVE MANAGEMENT AREA.
YOU CAN'T DO THAT IN THE PHOENIX ACTIVE MANAGEMENT AREA.
NEXT SLIDE. SO THIS IS WHERE DATA CENTERS ARE. WE LOOKED AT A BUNCH OF DATA CENTER
[00:45:02]
MAPS. WE WE REALLY LOOKED IN THE CAP SERVICE AREA.THIS IS JUST SO THAT YOU HAVE A SNAPSHOT OF WHAT'S GOING ON RIGHT NOW.
WE LOOKED AT ALL THE DATA CENTERS THAT WE COULD LOCATE BASED ON SEVERAL NATIONAL DATA CENTER MAPS IN THE THREE COUNTY SERVICE AREA TO SEE, ARE THEY USING REPLENISHED GROUNDWATER? ARE THEY SERVED BY A WATER PROVIDER WITH A LARGE WATER USER ORDINANCE? ARE THEY IN THE COMPARATIVELY WATER RICH SRP SERVICE AREA? I THINK THAT'S NOT APPEARING HERE.
AND THEN I WON'T GO INTO A LOT OF DETAILS, BUT ARE THEY SERVED BY A WATER PROVIDER WITH A DESIGNATION OF ASSURED WATER SUPPLY, WHICH IS A WATER PROVIDER WHO IS NO LESS FREQUENTLY THAN EVERY 15 YEARS, PROVING TO THE STATE THAT IT HAS A HUNDRED YEAR SUPPLY OF WATER GOING FORWARD.
AND YOU CAN SEE BY ALL THE WHY'S ON THERE, THE LARGE WATER USER ORDINANCES, ALL THE DESIGNATION OF ASSURED WATER SUPPLY, AND EVEN THE KIND OF LOW VOLUME OF REPLENISHED GROUNDWATER USE.
UNFORTUNATELY, YOU KNOW, THERE'S SOME BUT ESSENTIALLY RIGHT NOW THERE'S NOT A SIGNIFICANT PRESENCE OF DATA CENTERS WHERE, WHERE A LOT OF, YOU KNOW SCRUTINY ISN'T ALREADY OCCURRING.
TEN WATER PROVIDERS IN THE STATE OF ARIZONA HAVE LARGE VOLUME WATER USER ORDINANCES.
MOST OF THE WATER PROVIDERS TO, TO DATA CENTERS ARE DESIGNATED ASSURED WATER SUPPLY PROVIDERS, WHICH MEANS THEY'RE NOT GOING TO AGREE TO SERVE THAT DATA CENTER IF IT WOULD IMPINGE UPON THEIR ABILITY TO MEET DEMAND FOR THE NEXT 100 YEARS.
NEXT SLIDE. AND TO SUM IT UP, I GUESS THIS IS JUST MORE BIG PICTURE.
BUT, YOU KNOW, OF 7 MILLION OR SO ARIZONANS, OVER 5 MILLION ARIZONANS ARE PROTECTED FROM DATA CENTERS COMING IN AND THREATENING THEIR WATER SUPPLIES.
BECAUSE OF THESE REGULATIONS, THE ASSURED WATER SUPPLY PROTECTIONS.
NEXT SLIDE PLEASE. SIMILARLY, 4 MILLION US ARIZONANS IN THE SIP SERVICE AREA HAVE PROTECTION BECAUSE THEIR OWN PROVIDERS HAVE ENACTED LARGE VOLUME WATER USER ORDINANCES, INCLUDING EPCOR.
THIS IS SOMETHING THAT IF YOU'RE IN CONVERSATIONS WITH WATER PROVIDERS, YOU KNOW IT'S WORTH ASKING ABOUT.
DO YOU HAVE A LARGE WATER? THIS IS THESE ARE THE ONLY ONES WHO HAVE ONE NOW.
BUT IF THEY DON'T HAVE ONE, IT'S PROBABLY A GOOD IDEA TO CONSIDER GETTING AN ORDINANCE IF THEY'RE A CITY OR A TARIFF, IF THEY'RE A PRIVATE WATER COMPANY, SO THAT THEY'VE DONE THE WORK IN ADVANCE.
AND THIS ISN'T TRUE ONLY OF DATA CENTERS.
IT'S TRUE OF OTHER INDUSTRIES LIKE THE HYDROGEN INDUSTRY, OTHER INDUSTRIES THAT MAY COME ALONG AND WANT TO USE A LOT OF WATER.
SO NOW TO TO SUM IT UP, THE POLICY GAPS IN OUR ASSESSMENT, WE LOOKED AT ALL THE INDUSTRIAL USE PERMITS THAT HAVE BEEN TAKEN OUT IN THE THREE COUNTY SERVICE AREA IN THE LAST SINCE 2000, I THINK IT WAS 2008.
AND WE DON'T SEE ANY KIND OF INCREASE IN REQUESTS FOR INDUSTRIAL USE PERMITS.
SO. AND SO OUR CONCLUSION IS THE ADVENT OF DATA CENTERS HAS NOT, TO DATE CAUSED AN INCREASE IN THE USE OF REPLENISHED GROUNDWATER.
YOU KNOW THAT THAT SORT OF INDICATES A TREND OR IS MEANINGFUL.
AND WE POINT OUT THAT THE DIRECTOR, AS I MENTIONED BEFORE, HAS THE AUTHORITY TO DETERMINE NOT TO ISSUE AN INDUSTRIAL USE PERMIT IF IT WOULD BE INCONSISTENT WITH THE ACTIVE MANAGEMENT PLAN.
I'LL SAY ANOTHER THING THAT'S IMPORTANT. WE HAVE A REQUIREMENT IN OUR IN OUR ACTIVE MANAGEMENT AREAS FOR ANY ENTITY THAT IS USING WATER FOR COOLING, LARGE FACILITY COOLING TO REPORT THEIR WATER USE ACROSS THE 3 A.M.
EHS. WE. WE DID NOT SEE AN INCREASE IN WATER USE FOR LARGE FACILITY COOLING.
WHEN WE LOOKED AT THE ANNUAL REPORTS WHERE THIS INFORMATION IS REQUIRED TO BE REPORTED.
SO HERE'S THE MAP THAT SHOWS THE ACTIVE MANAGEMENT AREAS.
YOU CAN SEE THAT THE PANEL AMA DOESN'T COVER THE ENTIRE COUNTY, JUST LIKE THE PHOENIX AND PIMA AND TUCSON AREAS DON'T COVER ALL OF MARICOPA AND TUCSON OR PIMA COUNTY, THE PLACES OUTSIDE OF THE AMA'S, THE WHITE AREAS ON THIS MAP, OR EVEN THE SALMON, WHATEVER ORANGE COLORED AREAS.
THESE ARE PLACES WHERE THERE IS NO LIMITATION ON THE USE.
YOU KNOW, DRILLING A WELL AND USING THE WATER FOR A BENEFICIAL PURPOSE.
SO IN OUR ASSESSMENT, THIS IS THE THESE ARE THE REGIONS THAT ARE, FROM A WATER PERSPECTIVE, MOST VULNERABLE TO NEW HIGH VOLUME USE.
THEY'RE ALSO NOT CONVENIENT FOR DATA CENTERS.
[00:50:04]
SO WE DON'T SEE IT AS A A REAL RISK RIGHT NOW.THERE ARE VERY FEW PROPOSALS FOR DATA CENTERS THAT AREN'T REALLY CLOSE TO MORE, YOU KNOW, URBAN AREAS BECAUSE THEY NEED THE OTHER INFRASTRUCTURE.
NEXT SLIDE PLEASE. SO HERE ARE OUR CONCLUSIONS.
AS THE ECONOMY EVOLVES, WATER DEMAND IS GOING TO EVOLVE.
WE'LL PROBABLY SEE LESS WATER GOING TO AGRICULTURE, MORE WATER GOING TO OTHER TYPES OF USES, INCLUDING THE GENERATION OF POWER.
RIGHT NOW, DATA CENTER USE IS NOT A WATER PROBLEM.
MOST PEOPLE ARE PROTECTED, BUT WE HAVE IDENTIFIED THESE TWO POLICY GAPS.
ONE IS OUTSIDE OF AMAS, NOT REALLY APPLICABLE TO WHERE THE ACTION IS IN PINAL COUNTY IN PINAL COUNTY, BUT THERE MIGHT BE SOMETHING TO KEEP IN MIND.
AND SECOND, IF A SOMEBODY CAME ALONG AND SAID, WE'RE GOING TO DRILL A GREAT BIG WELL AND EXTRACT A HUGE AMOUNT OF GROUNDWATER TO COOL OUR JUST PRIMITIVE, EVAPORATIVE COOLED DATA CENTER, THEN, YOU KNOW, I THINK YOU'D WANT TO HAVE A CONVERSATION WITH THE DEPARTMENT OF WATER RESOURCES DIRECTOR ABOUT WHETHER THAT WOULD BE CONSISTENT WITH THE MANAGEMENT PLAN FOR THIS REGION. SO THAT'S IT.
I'M GOING TO HAND IT BACK TO KELLY UNLESS THERE ARE ANY MORE QUESTIONS ABOUT WATER.
ANY MORE QUESTIONS? SUPERVISOR.
JUST TO VERIFY. BUT IN ORDER FOR THEM TO DROP A WELL, THEY GOT TO GET A PERMIT TO DO IT IN THE FIRST PLACE. YES.
THEY HAVE TO THEY HAVE TO APPLY FOR AN INDUSTRIAL USE PERMIT.
THERE ARE SOME OTHER WAYS OF DOING IT, BUT IF THEY WANT TO DRILL A NEW WELL, THEY WOULD HAVE TO GO GET AN INDUSTRIAL USE PERMIT AND THEY WOULD HAVE TO MEET A BUNCH OF CONDITIONS, INCLUDING YOU HAVE TO BE I THINK IT'S TWO OR YOU HAVE TO BE A CERTAIN DISTANCE OUTSIDE OF THE SERVICE AREA OF A, OF A PROVIDER, A WATER PROVIDER, NOT AN ARMY WITHIN AN ARMY.
SO THERE ARE SEVEN TOTAL CONDITIONS, BUT THE BIG ONE IS IT HAS TO BE CONSISTENT WITH THE MANAGEMENT PLAN FOR THE A M A LOTS OF PERMITS, JUST LIKE DOING LIKE PAVING A DRIVEWAY.
YEAH. THERE'S, THERE'S A WAY THAT YOU CAN CONVERT AN EXISTING GROUNDWATER USE TO A DIFFERENT USE. THOSE OPPORTUNITIES HAVE REALLY BEEN LARGELY, YOU KNOW, TO A GREAT EXTENT THEY'VE BEEN EXPLOITED.
AND THEN I THINK, THIRD, THERE'S A DATA CENTER IN MESA THAT BUYS LONG TERM STORAGE CREDITS. SO THEY THEY'RE THEY'RE SERVED BY THE CITY OF MESA OR THEY'RE USING GROUNDWATER, BUT THEY'RE BUYING. I CAN'T REMEMBER EXACTLY HOW THEY'RE GETTING THEIR WATER, BUT THEY'RE, THEY'RE TRYING TO BUY LONG TERM STORAGE CREDITS TO GET TO NET ZERO.
THAT'S ALSO USING GROUNDWATER.
OKAY. YEAH. SO ON THE INDUSTRIAL SIDE OF IT, IF YOU'RE GETTING A PERMIT FOR AN INDUSTRIAL.
THAT COULD BE A WAREHOUSE THAT'S I MEAN, THAT'S KIND OF SHADY BECAUSE YOU HAVE TO YOU QUANTIFY YOUR WELL SIZE AND YOUR USE.
SO IT'S, IT'S A LITTLE HARDER.
YOU COULDN'T JUST GO AND SAY, I'M GOING TO HAVE A LITTLE TINY WELL TO SERVE MY BREAK ROOMS AND BATHROOMS AND THEN DRILL A MASSIVE WELL TO PUMP OUT, YOU KNOW, A MILLION GALLONS A DAY.
SO THEY'D HAVE TO PROVIDE WHAT THEY'RE GOING TO. THEY HAVE TO SPECIFY THAT EXACTLY BECAUSE INDUSTRIAL COULD BE VERY SMALL.
YEAH. OKAY. YEAH. NO ONE WOULD ACTUALLY APPLY FOR AN INDUSTRIAL USE PERMIT TO JUST PUMP OUT A TINY AMOUNT OF WATER BECAUSE, YOU KNOW, YOU COULD JUST GET AN EXEMPT WELL, TO DO THAT A LITTLE WELL.
THANK YOU VERY MUCH, MISS PORTER. APPRECIATE IT. MISS BARR, YOU'RE BACK UP. YOU'RE BACK VERY BRIEFLY, I PROMISE YOU.
I'M JUST GOING TO INTRODUCE PATRICK BOGLE.
PATRICK IS THE DIRECTOR OF DATA CENTER STRATEGY FOR APS.
SO HE'S GOING TO COME AND TALK ABOUT THE APS SITUATION RELATIVE TO DATA CENTERS.
AND THEN RIGHT AFTER PATRICK'S DONE, I'LL JUST GIVE BOTH OF THESE OUT OF THE WAY.
NATE TATE, WHO IS THE DIRECTOR OF TRANSMISSION PLANNING FOR SRP, IS GOING TO COME AND GIVE YOU THE SAME INFORMATION FROM SRP PERSPECTIVE.
ALL RIGHT. THANK YOU FOR HAVING ME TODAY. LIKE KELLY SAID, MY NAME IS PATRICK BOGLE. I'M THE DIRECTOR OF DATA CENTER STRATEGY AT APS.
MY ROLE WAS BUILT ABOUT A YEAR AND A HALF AGO WHEN WE REALLY SAW AN INFLUX OF DATA CENTER INTEREST IN THE APS SERVICE TERRITORY.
I HAVE FIVE PEOPLE THAT ARE ON MY TEAM, AND REALLY OUR RESPONSIBILITY IS TO FIGURE OUT HOW TO SERVE THE DATA CENTER LOAD THAT IS WANTING TO COME TO OUR SERVICE TERRITORY, BUT DO IT IN A RESPONSIBLE MANNER.
I'LL GET A LITTLE BIT INTO WHAT THAT MEANS.
YOU KNOW, WE TALK TO A HANDFUL OF DATA CENTER CUSTOMERS.
MANY OF THEM WERE IN THE, THE RIGHT CATEGORY THAT KELLY PRESENTED A LOT OF DATA CENTER DEVELOPERS THAT YOU WOULD CLASSIFY AS LIKE A COLO WHERE THEY'RE
[00:55:04]
BASICALLY LEASING SPACE TO THE HYPERSCALER OR THE END USE CUSTOMER.BUT WE'RE ALSO DEALING WITH A NUMBER OF THE HYPERSCALERS THAT ARE IN OUR SERVICE TERRITORY AS WELL. SO YOU KNOW, IF THERE'S ANY QUESTIONS TOWARDS THE END.
I CAN DEFINITELY TRY TO TO GIVE SOME OF THE INSIGHT FROM THE TRENDS AND THINGS THAT WE'RE SEEING FROM THOSE CONVERSATIONS WITHOUT, YOU KNOW, MENTIONING ANY SPECIFIC CUSTOMER INFORMATION. BUT YEAH, WE CAN JUMP INTO THE NEXT SLIDE.
SO APS AS A COMPANY, OUR SERVICE TERRITORY IS SHOWN THERE ON THE SCREEN.
YOU KNOW, WE'VE GOT A MIX OF, OF DIFFERENT AREAS THAT WE SERVE.
YOU KNOW, WE'VE GOT 11 OF THE 15 COUNTY COUNTIES, 1.4 MILLION CUSTOMERS.
BUT WE HAVE SOME AREAS LIKE PHOENIX WHERE YOU'VE GOT HIGHLY DENSELY POPULATED YOU KNOW, CUSTOMERS WHERE YOU'VE GOT ENERGY USE. BUT THEN WE HAVE MANY OF THE RURAL AREAS OF ARIZONA AS WELL. AND SO THAT REALLY PRESENTS DIFFERENT YOU KNOW, DIFFICULTIES IN SERVING BECAUSE, YOU KNOW, PHOENIX AREA, YOU'VE GOT, YOU KNOW, MUCH HIGHER PEAK USAGE IN THE SUMMER WHERE MAYBE FLAGSTAFF AND SOME OF THE NORTHERN AREAS, YOU HAVE A LITTLE BIT DIFFERENT USAGE PROFILE.
AND SO JUST IN GENERAL, WE'VE GOT, YOU KNOW, A LOT OF A LOT OF THE MAJOR METROPOLITAN AREAS COVERED, INCLUDING SOME IN PINAL COUNTY, AND SOME OF THAT IS PROBABLY SOME OF OUR FASTEST GROWING TERRITORIES IN A LOT OF MOVEMENT TOWARDS ELOY COOLIDGE, CASA GRANDE AND SERVING ADDITIONAL CUSTOMERS.
AND IT'S NOT ALL DATA CENTER CUSTOMERS EITHER.
SOME OF IT IS YOU KNOW, SUPPLY CHAIN CUSTOMERS THAT MAY BE SERVING THE SEMICONDUCTOR INDUSTRY.
SOME OF IT MIGHT BE ADDITIONAL MINING AS WELL.
SO WE'RE SEEING A LOT OF GROWTH ACROSS THE STATE, BUT, BUT TYPICALLY IN PINAL COUNTY AS WELL.
SO FROM A DATA CENTER PERSPECTIVE I WANTED TO JUST KIND OF LAY OUT THIS SLIDE A LITTLE BIT.
SO WHEN YOU LOOK AT LAST SUMMER, OUR PEAK LOAD THAT WE SERVED WAS 8.6GW OR 8600MW. SO WE KIND OF TALKED EARLIER, A MEGAWATT SERVES ABOUT LIKE A LARGE SUPER TARGET, WALMART, COSTCO TYPE STORE.
MEGAWATT IS ALSO EQUIVALENT TO ABOUT 150 TO 160 CUSTOMERS LIKE RETAIL CUSTOMER HOUSEHOLDS, RESIDENTIAL HOUSEHOLDS.
AND SO THAT WAS OUR PEAK WE HIT LAST SUMMER.
I WILL TELL YOU, LAST SUMMER WE HIT THREE ALL TIME PEAKS.
SO OUR LOAD CONTINUES TO GROW AND EXPECT THAT IN 2026, WE WILL HIT A NUMBER HIGHER THAN THAT.
ON TOP OF THAT LOAD, WE HAVE COMMITTED TO 4.5GW OF DATA CENTER CUSTOMERS.
THIS IS WHERE WE FELT WE COULD RESPONSIBLY SERVE IN A RELIABLE MANNER.
STEP BACK ON THAT, THAT 8.6 NUMBER THAT INCLUDED ROUGHLY 450 TO 500MW OF DATA CENTER CUSTOMERS. SO THAT 4.5 IS WHAT YOUR TARGET DATE ON THAT.
IT'S REALLY DEPENDENT ON THE SPECIFIC PROJECTS, LET'S CALL IT THROUGH 2030, 31, 32.
SOME OF THESE DATA CENTERS HAVE MUCH, YOU KNOW, EXTENDED TIMELINES AS TO WHAT THAT BUILDOUT LOOKS LIKE FOR THEM.
BUT WE'VE, THOSE ARE THE COMMITMENTS WE'VE MADE.
SO OVER THE NEXT. DOES THAT MEAN YOU CAN MEET THAT DEMAND NOW? NOT TODAY. DOES IT MEAN THAT YOU'LL HAVE TO EVOLVE WITH THEM? WE'RE GOING TO HAVE TO EVOLVE TO SUPPORT THAT LOAD AS WELL. OKAY.
HENCE ALL THE POWER PLANTS THAT ARE COMING TO US.
YEAH. YEAH. YEAH. SO THE REASON WHY I ASKED THAT QUESTION IS I THINK IT'S IMPORTANT FOR US BECAUSE IF WE SEE WHAT'S COMING, WE'RE GOING TO BE MORE AND MORE INVOLVED IN THE DECISION MAKING ON WHAT WE NEED TO LOOK FORWARD OR LOOK FORWARD.
WE NEED TO BE THINKING AND HAVING THESE DISCUSSIONS, KNOWING WHAT THE DEMAND IS GOING TO BE, WHERE YOU GUYS ARE PLANNING ON IT, WHERE SRP IS GOING. ARE WE WILLING TO DO THAT? OKAY. YEAH, ABSOLUTELY.
AND WE DO A LONG TERM PLANNING PROCESS.
I BELIEVE OUR IRP FILING, OUR RESOURCE PLAN IS IS FILED LATER THIS YEAR. AND IT WILL SPELL OUT SOME OF HOW WE'RE PLANNING ON MEETING THAT DEMAND AS WELL AS THEORETICAL CASES AS TO WHAT IF THAT DEMAND GROWS MORE.
SO WHAT OTHER INDUSTRY ARE YOU DOING THE SIMILAR WITH OTHER INDUSTRY THAT'S COMING TO THE AREAS LIKE MANUFACTURING AND THINGS LIKE THAT.
CAN I ANSWER THAT IN A SECOND? YEAH. OKAY. BECAUSE I'LL GET TO THAT PIECE SPECIFICALLY.
ON TOP OF THE 4.5GW WE'VE COMMITTED TO SERVE, WE HAVE NORTH OF 20GW OF CUSTOMERS THAT HAVE SAID THEY WANT TO BE LOCATED IN OUR SERVICE TERRITORY, BUT WE DON'T HAVE THE ABILITY TO SERVE THEM TODAY.
SO WE'VE SAID WE WILL SERVE YOU, BUT WE NEED TO BUILD THE CAPACITY, THE INFRASTRUCTURE, EVERYTHING THAT WOULD BE REQUIRED TO SERVE YOU.
THAT'S YES, JUST DATA CENTER CUSTOMERS.
WOW. AND SO THE INTERESTING PART ABOUT THAT THOUGH, AND YOU TALKED A LITTLE BIT ABOUT HOW THIS IS HAPPENING ACROSS THE COUNTRY. WE ARE NOT THE ONLY ONE WITH AN UNCOMMITTED QUEUE.
YOU KNOW, EVERY MAJOR STATE THAT'S, THAT'S LOOKING TO ADD DATA CENTERS HAS A
[01:00:03]
SIMILAR QUEUE. WE'VE TALKED TO A NUMBER OF DIFFERENT UTILITIES.YOU KNOW, I THINK THE TEXAS Q IS, I THINK, NORTH OF 50GW.
BUT THERE'S OTHERS ACROSS THE COUNTRY THAT HAVE MUCH LARGER. VIRGINIA'S GOT A VERY LARGE. Q SO THE WHY I STATE THAT IS BECAUSE WHEN YOU TALK ABOUT THESE, CUZ IT'S A VERY TRANSIENT SET OF PROJECTS, IF THEY CAN GET THE POWER SOMEWHERE ELSE QUICKER, THEY WILL TAKE THAT PROJECT AND THEY MIGHT NOT BUILD IT IN ARIZONA, YOU KNOW, THEY MIGHT BUILD IT IN VIRGINIA OR GEORGIA OR WHEREVER IT BE.
RIGHT. SO WHEN YOU START LOOKING AT THESE Q NUMBERS, A LOT OF PEOPLE ARE YOU ALWAYS ASK THE QUESTION OF HOW REAL IS THAT 20GW? IT'S REALLY HARD TO KIND OF PINPOINT BECAUSE I MEAN, THAT THAT SAME PROJECT COULD BE IN SEVEN, EIGHT, TEN DIFFERENT QUEUES ACROSS THE COUNTRY.
YEAH. SO WHEN WE LOOK AT THAT NUMBER, I MEAN, I THINK IT'S AN OPPORTUNITY FOR US TO GROW INTO THE FUTURE AS WE GET, YOU KNOW, THE INFRASTRUCTURE TO RELIABLY SERVE, BUT WE'RE NOT NECESSARILY, YOU KNOW, REALLY KIND OF FORECASTING.
HOW REAL DO WE THINK THAT 20GW IS TODAY? SO EXCUSE ME. SO IN THE ASPECT OF DATA CENTER COMING, THEY SAY THEY'RE GOING TO BE WORKING WITH APPS OR ANY UTILITY.
HOW DO I KNOW THAT? THAT'S TRUE? BECAUSE I'VE HAD A RUN IN ON A DIFFERENT PROJECT.
HOW DO I KNOW THAT THEY'RE ACTUALLY WORKING WITH YOU? AND IF YOU'RE FIVE, SEVEN YEARS OUT AND THEY'RE 2 TO 3 YEARS OUT TO START BUILDING THIS THING, HOW AM I SUPPOSED TO APPROVE SOMETHING IF I KNOW THEY DON'T HAVE AT THAT PARTICULAR TIME, THE POWER? IT'S AN INTERESTING QUESTION.
AND I THINK WHAT YOU'VE STARTED TO SEE, I'M GOING TO REFERENCE THE CITY OF PHOENIX ORDINANCE. AND IF YOU AREN'T AWARE, CITY OF PHOENIX PUT IN AN ORDINANCE TO TRY TO CONTROL DATA CENTER LOAD AND WHERE IT WAS BEING PLACED.
AND BECAUSE WHAT THEY WERE SEEING IS A LOT OF THEIR HIGHEST AND BEST USE ECONOMIC DEVELOPMENT OPPORTUNITIES WERE BEING BOUGHT OUT BY DATA CENTERS, AND THEY WERE TRYING TO KIND OF CONTROL THAT A LITTLE BIT.
AND SO PART OF WHAT WE DISCUSSED WITH THE CITY, IT WAS MORE OF AN EDUCATION EXPERIENCE OF WHEN WE GET TO A POINT WHERE WE ARE READY TO SERVE A DATA CENTER CUSTOMER, THERE WILL BE A AN AGREEMENT THAT WE PUT INTO PLACE CALLED A LOAD COMMITMENT AGREEMENT GOING FORWARD.
AND SO THAT IS REALLY OUR COMMITMENT TO SERVE THEM, BUT IT'S ALSO THEM MAKING COMMITMENTS TO US ON HOW MUCH POWER THEY'RE GOING TO USE, WHAT THE TERM OF THAT AGREEMENT WILL LOOK LIKE, ETC..
SO WHEN I LOOK AT PINAL COUNTY SPECIFICALLY, WE HAVEN'T MADE ANY COMMITMENTS TO ANY DATA CENTER PROJECTS THAT ARE IN PINAL TODAY.
SO WHEN YOU LOOK AT THAT FOUR AND A HALF GIG NUMBER, THAT DOESN'T INCLUDE ANY COMMITMENTS FOR PROJECTS TODAY.
HOW WOULD YOU KNOW THAT GOING FORWARD? THAT'S A GOOD QUESTION. I DON'T, I DON'T THINK WE HAVE NECESSARILY A PATH ON HOW WE WOULD DELIVER THAT OTHER THAN, YOU KNOW, THAT MIGHT BE A QUESTION TO ASK OF THE DATA CENTER DEVELOPER SPECIFICALLY.
DO YOU HAVE A COMMITMENT FROM APPS TO SERVE OR WHOEVER THEIR UTILITY BE? RIGHT. IT MIGHT NOT BE US, MIGHT BE OTHERS THAT HAVE KIND OF OVERLAPPING SERVICE TERRITORIES, BUT IT MIGHT BE A DIRECT QUESTION TO SAY, YOU KNOW, WHAT IS YOUR PATH TO POWER? AND HAS THAT BEEN COMMITTED TO DOES THAT HELP KIND OF ON THE CONSTRUCTION OF A DATA CENTER CAPITAL INTENSIVE, RIGHT? YEAH. SO IF THEY DON'T HAVE THE POWER, IT'S LIKELY NOT GOING TO. YEAH.
AND THAT'S JUST JUST AS A NOTE, IF YOU'RE GOING TO SPEAK, YOU NEED TO COME TO THE MICROPHONE SO THAT WE CAN RECORD IT. YEAH.
SO SO BACK TO THAT. I MEAN, IT IS A VERY CAPITAL INTENSIVE BUSINESS.
THEY'RE, THEY'RE LOOKING TO, TO BUILD OUT EVEN THE SHELL.
SO, YOU KNOW, IF WE'RE FIVE YEARS OUT ON THE POWER SIDE, YOU KNOW, TYPICALLY THEY'RE NOT GOING TO START THAT, THAT BUILD OUT OF THAT SHELL UNTIL THEY HAVE SOME KIND OF PATHWAY TO WHAT THAT POWER LOOKS LIKE.
YOU KNOW, THAT CAN BE DEPENDING ON THE SIZE OF THE PROJECT.
I MEAN, HUNDREDS OF MILLIONS OF DOLLARS. OKAY. SO THERE IS A COMMITMENT FINANCIALLY THAT THEY WOULD HAVE TO PUT DOWN.
SO IN THE CASE OF WHAT WE'RE CALLING THE LOAD COMMITMENT AGREEMENT, THAT'S WHERE WE'RE BASICALLY SAYING WE WILL DELIVER.
LET'S I'M GOING TO CALL IT 100 MEGAWATT PROJECT, RIGHT? YOU'VE GOT 100 MEGAWATT DATA CENTER.
WE ARE COMMITTING TO SERVE THAT.
IT WILL HAVE. THAT AGREEMENT HAS A LOAD RAMP AS TO HOW THEY'RE GOING TO BRING THAT DATA CENTER ONLINE. BUT IT'S ALSO COMMITMENTS FOR.
WE WILL SERVE THAT FOR A DEFINED PERIOD OF TIME.
HERE'S WHAT YOU'RE GOING TO PAY FOR THAT PERIOD.
AND YOU'RE GOING TO HAVE ENERGY MINIMUMS BUILT INTO THAT AS WELL, AND DEMAND MINIMUMS TO ENSURE THAT IF WE'RE BUILDING OUT INFRASTRUCTURE AND PROCURING RESOURCES TO SERVE YOU, THAT WE'RE GETTING THE COLLECTION, WE NEED TO MAKE SURE THAT OTHER CUSTOMERS ARE NOT IMPACTED BY THAT. OKAY.
NEXT SLIDE. SO WHEN I TALKED ABOUT YOUR QUESTION EARLIER WE'VE REALLY BUILT MY TEAM AROUND THREE CORE PRINCIPLES.
ONE IS WE ARE NOT GOING TO SERVE MORE DATA CENTER LOAD IN THE APPS SERVICE TERRITORY.
[01:05:01]
IF WE CANNOT DO IT RELIABLY OR AFFORDABLY, WE'RE NOT GOING TO PUT OTHER CUSTOMERS AT RISK OF HAVING RELIABILITY ISSUES.IN ARIZONA TO SERVE MORE, MORE DATA CENTERS, JUST NOT GOING TO HAPPEN.
I MEAN, ENERGY IS A LIFEBLOOD FOR THE STATE.
IT IS A CRITICAL ASPECT WHEN YOU START LOOKING AT HEALTH AND SAFETY OVER THE SUMMER.
I MEAN, WHEN YOU'RE 115 DEGREES OUTSIDE, YOU NEED THAT COOLING AND YOU NEED TO RELY ON YOUR, YOUR UTILITY TO BE ABLE TO SERVE THAT.
AND WE'RE NOT GOING TO PUT THAT AT JEOPARDY JUST TO SERVE MORE DATA CENTERS. SO THAT'S KIND OF PRINCIPLE ONE. WE GET BACK TO THE AFFORDABILITY CONCEPT.
WE WILL ONLY DO IT IN A MANNER THAT THAT DOES NOT CREATE A COST SHIFT TO EXISTING CUSTOMERS. WE'RE NOT GOING TO SERVE MORE DATA CENTERS AND ASK OUR RETAIL RESIDENTIAL CUSTOMERS TO PAY FOR THOSE DATA CENTERS TO COME AGAIN.
IT'S, YOU KNOW, THE EXAMPLE WE USE IS GRANDMA DOWN THE STREET.
SHOULD NOT BE PAYING FOR GOOGLE OR MICROSOFT OR INSERT HYPERSCALER HERE TO BUILD THE DATA CENTER IN ARIZONA. EXCUSE ME WHEN YOU'RE SAYING THAT I ALSO SAW A SLIDE THAT THERE WAS A 7% INCREASE TO RESIDENTIAL, A 3% INCREASE TO COMMERCIAL, AND A 2% DECREASE IN INDUSTRY.
THAT WAS A SLIDE CAME FROM YOUR GUYS WEBSITE.
DID THAT ALSO BREAK OUT THE EXTRA? SO DATA CENTERS ARE SERVED UNDER A RATE CLASS CALLED EXTRA HIGH LOAD FACTOR.
IT JUST HAD THOSE THREE CATEGORIES. AND SO WHEN I SAW INDUSTRIAL THAT'S WHY I WAS ASKING THE QUESTION EARLIER BECAUSE INDUSTRIAL LIKE I SAID, CAN BE A LOT OF THINGS.
CORRECT. SO HOW ARE THEY GETTING YOU KNOW, YOU SAY YOU WANT TO PROTECT THE RESIDENTIAL PEOPLE, BUT THEY HAD A 7% INCREASE, 3% INCREASE FOR COMMERCIAL AND A 2% DECREASE IN INDUSTRIAL. SO WHAT I WOULD POINT TO THERE IS WE ARE IN THE PROCESS OF GOING THROUGH A RATE CASE AT THE THE ARIZONA CORPORATION COMMISSION, AND IN THERE WE HAVE PROPOSALS FOR WHAT THE DIFFERENT RATE CLASSES WILL LOOK LIKE GOING FORWARD. OBVIOUSLY THAT HAS TO BE KIND OF LITIGATED AND VOTED ON BY THE COMMISSION.
BUT IN THAT CASE, THE EXTRA HIGH LOAD FACTOR CUSTOMER, WHICH IS WHERE A DATA CENTER WOULD BE SERVED, THAT'S THEIR RATE CLASS IS ACTUALLY SEEING AN INCREASE OF 46%. SO IT'S ONLY FAIR THAT SOMETHING LIKE THAT IS DONE.
WE, I'VE SEEN SOMETHING SIMILAR TO WHAT YOU'RE TALKING ABOUT IN MY OWN COMMUNITY WHERE UTILITY WAS INSUFFICIENT.
AND THE CURRENT RATEPAYERS ARE PAYING FOR WHAT THEY HAD TO IMPROVE FROM THE PAST PROVIDER SO THAT THEY COULD CONTINUE TO GROW IN MY COMMUNITY.
AND NOW THE CURRENT RATEPAYERS ARE PAYING FOR WHAT THEY HAD TO BUILD IN ORDER TO FOR THE FUTURE. AND THE A, C, C COULDN'T SEE THAT BACK THEN, BUT IT SOUNDS TO ME LIKE YOU GUYS ARE ADDRESSING THAT RIGHT NOW, WHICH IS GOOD. THAT NEEDS TO BE.
YEAH. AND I THINK WHEN YOU LOOK AT OUR RATE CASE AND THE STRATEGY THAT WE'RE USING, WE'RE CALLING IT GROWTH PAYS FOR GROWTH. I DON'T KNOW IF THAT WAS TERMED BY US OR THE COMMISSION, BUT IT'S KIND OF BEEN A TERM THAT ALL OF THE UTILITIES IN ARIZONA HAVE ADOPTED.
AND IT'S REALLY TO ENSURE, YOU KNOW, THAT, THAT EACH CUSTOMER CLASS IS PAYING THEIR FAIR SHARE BASED ON THE GROWTH CAUSED BY THAT CUSTOMER CLASS. AND SO WE'RE NOT GOING TO BURDEN THE, YOU KNOW, RESIDENTIAL CUSTOMER CLASSES FOR, FOR DATA CENTER GROWTH. AND I THINK WHEN YOU EVEN LOOK AT THAT, THE RATE CASE THAT'S GOING IN, IT'S BASED ON A TEST YEAR OF COSTS, WHICH WAS, I BELIEVE, 24, 2024, WHICH AT THAT POINT, I MEAN, WE DON'T HAVE WE'RE STILL BUILDING INTO THAT.
LIKE I SAID, OUR PEAK HAD 450MW OF DATA CENTER.
SO DATA CENTERS ARE NOT A BIG DRIVER OF OUR LOAD FOR THAT TEST YEAR, LESS THAN 5%. SO WE'RE CONTINUING TO GROW IN AND TRY TO SET THESE THESE PRINCIPLES IN TODAY SO THAT WHEN THAT GROWTH HAPPENS, WE'RE PREPARED TO, TO, TO DO IT IN A WAY THAT DOES NOT IMPACT OTHER CUSTOMERS.
SO IS SRP IS IN THE AUDIENCE AS WELL.
CORRECT. YEAH. SO YOU JUST SAID THAT A DATA CENTER DOESN'T GET ANY PREFERENCE, BUT WE JUST TURNED DOWN A VERY DECEPTIVE SOLAR COMPANY WHO WAS NOT GOING TO PUT THEIR POWER INTO THE GRID. IT WAS GOING TO GO DIRECTLY TO ONE DATA CENTER ONLY IN THE FLORENCE AREA. SO THAT'S SOMETHING APS WOULD NOT DO.
AND SRP. HOW WAS THAT GOING TO WORK? RIGHT. IT WAS NOT GOING TO HELP THE AVERAGE CITIZEN.
IT WAS ONLY GOING TO HELP THE DATA CENTER.
WE DON'T KNOW BECAUSE THEY HAD NO AGREEMENT. YEAH.
NO AGREEMENT. NONE OF THAT WAS DONE.
SO. BUT THAT'S WHAT THEY WERE INTENDING TO DO.
SO THIS IS THIS IS WHY WE'RE HAVING THIS DISCUSSION BECAUSE A LOT OF THESE THINGS COME UP AND, YOU KNOW, TO THE AVERAGE PEOPLE, THE AVERAGE PERSON, YOU KNOW, THEY'RE TIRED OF HEARING ABOUT THESE.
HOW MUCH BETTER IS OUR LIFE GOING TO BE WHEN WE HAVE A DATA CENTER ON EVERY CORNER? AND THAT'S WHAT THE PEOPLE DON'T UNDERSTAND AND DON'T SEE, AND I DON'T SEE IT. I HAVE PLENTY OF POWER IN MY PHONE AND MY COMPUTER HERE.
[01:10:06]
ONE OF THE ONE OF THE QUESTIONS WE'RE GOING TO TRY TO GET WHEN IS ENOUGH ENOUGH? AND ONE OF THE QUESTIONS I'VE CONTINUALLY ASKED IS LIKE SELF CELL PHONES.WHEN I DRIVE BACK TO APACHE JUNCTION, I HAVE A DEAD SPOT BETWEEN FLORENCE AND FLORENCE JUNCTION, WHICH IS WHY THEY TRY TO DO COVERAGE WITH CELL TOWERS EVERY SO OFTEN, EVERY 1015 MILES. OUR DATA CENTERS THE SAME WAY.
IF IF, LET'S SAY WYOMING DOESN'T HAVE ANY DATA CENTERS, ARE THEY NOT GOING TO BE ABLE TO KEEP UP? AND WE'RE ONLY GOING TO BE DOWN HERE IN OUR HIGHLY TECHY AREA, OR I DON'T KNOW IF YOU'RE THE ONE TO ASK THAT QUESTION TO.
YEAH. SO SO KELLY TALKED A LITTLE BIT ABOUT IT AND THE IDEA THAT DATA CENTERS LIKE TO BE CLOSER TO THE POPULATIONS THEY'RE SERVING.
AND SO SOME OF THE DEMAND FOR DATA CENTERS IN ARIZONA IS DRIVEN BY THE POPULATIONS THAT WE HAVE. THAT BEING SAID, THERE IS ALSO A TREND THAT I HAVE SEEN WHERE THEY WILL GO TO WHERE THEY CAN GET THE ENERGY THE FASTEST.
WHETHER THAT'S ARIZONA, WHETHER THAT'S WYOMING IN YOUR EXAMPLE, IF THEY CAN GET POWER SOMEWHERE, THEY'RE GOING TO LOOK TO SEE IF THERE'S A FEASIBLE WAY TO MAKE A PROJECT WORK THERE.
AND IF. AND ANOTHER QUESTION I'VE ASKED IF, IF ONE GOES IN, IN WYOMING, DOES IT BENEFIT US HERE? YEAH. SO THEY'RE ALL CONNECTED.
SO LET'S PUT THEM ALL IN ARGENTINA.
LET'S PUT A THOUSAND OF THEM IN ARGENTINA.
WHY DO WE NEED ANY OF THEM? YES. I THINK THEY DON'T SPEAK ARGENTINA FOR ONE THING.
AND SO IF I HAVE A PROBLEM I DON'T WANT TO HAVE TO CALL.
BUT ANYWAY, IF I COULD JUST INTERJECT REAL QUICK, BECAUSE WHAT I'M HEARING FROM YOU AS A PROVIDER OF POWER IS THAT YOU ARE DEVELOPING A PROCESS TO WHERE THE DATA CENTER, WHOEVER'S COMING HERE HAS SKIN IN THE GAME.
THEY'RE HELPING PAY FOR THE INCREASE, WHATEVER IS NECESSARY.
THE DELIVERY SYSTEM, WHATEVER HAS TO HAPPEN, EVEN IN THE CASE OF THIS FAKE SOLAR THAT WAS COMING, THEY WERE BRINGING A POWER SOURCE THAT WAS GOING TO BE NECESSARY FOR THEM TO FUNCTION. THEY WERE BRINGING SOME TYPE OF POWER SOURCE TO A DATA CENTER THAT WAS BEING PROPOSED. THAT WAS THEIR CONCEPT.
WHETHER THEY GOT TO THAT POINT OR NOT, THAT WAS THEIR INTENT BASED ON WHAT WE'VE HEARD FROM THEM. BUT THAT'S WHAT SOUNDS TO ME LIKE WHAT YOU'RE ARE, ARE REQUIRING SO THAT THEY'VE GOT SKIN IN THE GAME.
IF THEY'RE GOING TO, YOU'RE NOT GOING TO HURT THE CURRENT BASE THAT WE'VE GOT RIGHT NOW.
YOU'RE PUTTING MECHANISM IN PLACE TO WHERE IF THEY'RE GOING TO COME, THEY'VE GOT TO THEY GOT TO PONY UP.
CORRECT. AND WE'LL TALK A LITTLE BIT ABOUT THE DIFFERENT SERVICE MODELS HERE IN A SECOND. THAT'S WHAT I'M HEARING. YEAH. BUT TO THAT POINT, YOU KNOW, WHEN WE EVALUATE THOSE RESOURCES THAT MAYBE GET BROUGHT TO US FROM A PROJECT PERSPECTIVE, ONE OF THE THINGS WE'RE LOOKING AT IS DOES IT HAVE A RELIABILITY IMPACT TO OUR EXISTING CUSTOMERS? AND IF, IF THERE IS, YOU KNOW, IF A RESOURCE PORTFOLIO, SOMETIMES IT'S NOT JUST SOLAR, SOMETIMES IT'S THERE'S BIGGER PROJECTS THAT MAYBE PEOPLE PROPOSE THAT INCLUDE SOLAR, BUT ALSO GAS OR OTHER RESOURCES.
IF THAT CAN RELIABLY SERVE, WE WOULD BE OPEN TO A CONVERSATION POTENTIALLY. BUT I WILL SAY IF IT'S JUST A SOLAR TYPE PROJECT LIKE THAT, MAYBE POTENTIALLY BEHIND THE METER, IT PROBABLY IS NOT GOING TO HAVE A POSITIVE RELIABILITY IMPACT TO OUR CUSTOMERS AND WOULD BE SOMETHING WE WOULD SAY, YOU KNOW, AGAIN, PRINCIPLE ONE, WE'RE NOT GOING TO IMPACT BASED ON WHAT I WAS TOLD. AND AGAIN, THERE WAS NO FINAL AGREEMENT MADE OR ANYTHING ELSE OF THAT NATURE.
THEY WERE GOING TO ACTUALLY TIE IN TO THE GRID.
OKAY. YEAH. I'M NOT FAMILIAR WITH THE SPECIFIC PROJECT, BUT AGAIN, IT NEVER REALLY GOT THAT FAR ANYWAY.
SO WE DON'T KNOW. IT NEVER REALLY WORKED OUT THE PARTICULARS.
YEAH. OKAY. YEAH. SO, SO TO THE THREE PRINCIPLES WE TALKED ABOUT THE FIRST TWO, THE THIRD GOES BACK TO YOUR YOUR QUESTION, SUPERVISOR GOODMAN IS, YOU KNOW, HOW ARE WE ENSURING THAT THERE'S ROOM FOR GROWTH IN EXISTING? YOU KNOW, IT'S NOT JUST DATA CENTERS THAT ARE WANTING TO COME TO ARIZONA. I MEAN, WE'RE SEEING LARGE GROWTH IN THE SEMICONDUCTOR INDUSTRY.
I THINK THERE'S, YOU KNOW, THERE'S VIEWPOINTS THAT THAT'S A NATIONAL SECURITY CONCERN. YOU KNOW, I THINK IT'S VERY PUBLIC THAT TAIWAN SEMICONDUCTOR IS IN OUR SERVICE TERRITORY AND LOOKING TO CONTINUE TO GROW.
ALONG WITH THAT, THEY BRING THEIR SUPPLY CHAIN. THERE'S, YOU KNOW, ALL KINDS OF YOU KNOW, CHEMICALS AIR DIFFERENT.
I DON'T WANT TO SAY ELEMENTS, BUT LIKE HELIUM IS A BIG, YOU KNOW, DIFFERENT GAS COMPONENTS THAT ARE PART OF THAT MANUFACTURING PROCESS. AND ALL OF THAT SUPPLY CHAIN IS COMING WITH THEM, WHICH INCREASES GROWTH. AND THEN, YOU KNOW, AGAIN, EMPLOYMENT. YOU'VE GOT THE RESIDENTIAL GROWTH. SO WHILE WE ARE LOOKING TO SERVE DATA CENTERS WHERE WE CAN, SOME OF WHAT WE'RE ALSO LOOKING TO DO IS ENSURE THAT WE'VE GOT, YOU KNOW, FOSTERING GROWTH IN THOSE, THOSE OTHER AREAS AS WELL.
AND SO WE ARE KIND OF TRYING TO, TO CREATE A BALANCE OF HOW DO WE SERVE DATA CENTERS VERSUS OTHER MANUFACTURING AS WELL, INCLUDING,
[01:15:04]
YOU KNOW, POTENTIALLY MINES AND OTHERS AS WELL.SO. SO PATHWAYS TO SERVICE, YOU KNOW, WE'VE, WE'VE TALKED A LITTLE BIT ABOUT THIS.
IF YOU'RE AN EXISTING CUSTOMER IN A DATA CENTER BRINGING A DATA CENTER, YOU'RE UNDER WHAT WE CALL KIND OF OUR TARIFF SERVICE.
SO THIS IS OUR TRADITIONAL PATHWAY THAT, THAT ANY RETAIL CUSTOMER WOULD GET SERVICE THROUGH. IF YOU WANT TO SIGN UP YOUR HOUSE AND HOOK INTO THE APS SYSTEM, YOU WOULD TAKE TARIFF SERVICE.
AND THERE'S A RATE SCHEDULE THAT DEFINES WHAT THAT SERVICE LOOKS LIKE.
ANYTIME WE WANT TO CHANGE THOSE RATES, MODIFY THOSE RATES, IT HAS TO GO THROUGH A RATE CASE THAT THEN HAS, YOU KNOW, A WHOLE PROCESS ASSOCIATED WITH IT.
SO IF YOU'RE AN EXISTING DATA CENTER CUSTOMER, YOU'RE TAKING SERVICE UNDER THAT, THAT, THAT BOX ONE THE FOLKS THAT ARE SITTING IN THE UNCOMMITTED QUEUE ARE ALSO WAITING FOR SERVICE UNDER THAT BOX ONE.
SO WHEN YOU'RE, YOU'RE PUTTING YOUR POSITION DOWN IN THAT QUEUE, IT'S FOR SERVICE UNDER BOX ONE.
WE'VE ALSO CREATED KIND OF A DIFFERENT METHOD HERE WE TALK ABOUT IN BOX TWO, WHICH IS IF YOU'RE A DATA CENTER AND YOU'RE WILLING TO FULLY COVER ALL OF THE INCREMENTAL COSTS ASSOCIATED WITH SERVICE, WE MAY BE ABLE TO SERVE YOU SOONER, BUT YOU'RE GOING TO HAVE TO SIGN A BILATERAL AGREEMENT THAT'S TAKEN TO THE COMMISSION.
IT'S MAYBE OUTSIDE OF A TARIFF RATE SERVICE, BUT IT GIVES YOU A PATHWAY TO TO MAYBE GET YOUR SITE IN SERVICE SOONER.
BUT IT ALSO COMES WITH A SIGNIFICANT UPFRONT COST AND INVESTMENT.
AND EFFECTIVELY WHAT IT ALLOWS US TO DO IS MAKE INVESTMENTS SOONER, BECAUSE WE'RE USING THE BALANCE SHEET OF THE DATA CENTER TO MAKE THOSE INVESTMENTS.
YOU KNOW, AS A UTILITY, WE'VE GOT TO MANAGE CERTAIN FINANCIAL METRICS, AND WE ONLY HAVE SO MUCH CAPITAL WE CAN INVEST EVERY YEAR.
AND SO THIS IS KIND OF AN OPPORTUNITY TO SAY, IF YOU'RE WILLING TO PAY FOR AN UPFRONT, THE, THE FINANCING, YOU KNOW, ASPECTS, WE CAN HAVE THOSE CONVERSATIONS.
BUT TO YOUR POINT, YOU KNOW, AGAIN, IT GOES BACK TO THOSE PRINCIPLES.
WE'RE NOT GOING TO DO IT IF IT'S GOING TO IMPACT RELIABILITY OR YOU'RE CREATING ANY TYPE OF COST SHIFT TO EXISTING CUSTOMERS.
IT'S OFF THE TABLE AT THAT POINT. OKAY. SO WHERE WOULD THAT POWER COME FROM IF YOU'RE ABLE TO MOVE THEM UP, IF YOU CAN'T GENERATE IT FROM GAS POWER PLANTS TAKING 5 TO 7 YEARS.
SOLAR IS NOT GOING TO GENERATE ENOUGH.
WHERE WOULD THE EXTRA POWER COME FROM QUICKER? YEAH. SO LET ME I'LL PAINT A LITTLE EXAMPLE HERE.
SO SAY YOU'RE IN THAT UNCOMMITTED QUEUE AND YOUR MEGAWATT 15,000 IN THAT QUEUE, RIGHT? YOU MIGHT BE MORE THAN A DECADE OUT FROM SERVICE, BUT IF YOU'RE WILLING TO BUILD A GAS GENERATOR AND PAY FOR THE COST OF BUILDING THAT GAS GENERATOR YOURSELF AND ALL THE INFRASTRUCTURE THAT WOULD BE REQUIRED TO SERVE IT. I MEAN, YOU GOT YOU GOT GAS LATERALS, YOU GOT TRANSMISSION UPGRADE.
THERE'S A LOT MORE THAN JUST BUILDING THE ACTUAL TURBINE, AND YOU'RE WILLING TO KIND OF ENSURE THAT YOU'RE GOING TO COVER THE COSTS OF MAINTAINING AND OPERATING ALL OF THAT INFRASTRUCTURE FOR A 20 YEAR PERIOD.
LIKE WE MIGHT BE ABLE TO ACCEPT THAT AS AN OPTION WHERE YOU BUILD THE GENERATION, BUT WE WOULD WANT OWNERSHIP OF THAT ASSET, THEN WHY NOT GO BEHIND THE METER? WELL, AND THAT'S THAT IS AN ANSWER THAT THEY COULD GO FOR.
BUT WHAT WE'VE HEARD IN GENERAL IS THAT BEHIND THE METER DOESN'T PROVIDE THE LEVEL OF RELIABILITY THAT A DATA CENTER WOULD EXPECT OR YOU'RE HAVING TO, I THINK, AS KELLY MENTIONED, YOU'RE BUILDING OUT SIGNIFICANTLY MORE CAPACITY TO ACCOUNT FOR THINGS LIKE OUTAGES YOU KNOW, MAINTENANCE ON THOSE PLANTS, ETC..
SO THAT HASN'T BEEN A PATHWAY WE'VE SEEN A LOT OF FOLKS DO TODAY.
BUT A GAS GENERATING PLANT CAN'T RUN 247 EITHER THOUGH.
CORRECT. SO YEAH, THAT'S WHERE YOU'RE HAVING TO TAKE.
YOU'D HAVE TO BUILD EITHER TWO GAS GENERATORS OR A GAS GENERATOR OR SOLAR AND EVEN BATTERIES. YOU HAVE TO HAVE A WAY TO CHARGE THAT BATTERY. SO I MEAN, IT'S, IT GETS COMPLICATED.
AND THAT'S PART OF WHAT WE'RE LOOKING AT IS, YOU KNOW, WE TAKE THOSE RESOURCE PORTFOLIOS UNDER UNDER OPTION TWO, AND WE RUN THEM THROUGH OUR RESOURCE PLANNING TEAM THAT EVALUATES THE RELIABILITY, NOT JUST, YOU KNOW, THEY'VE RUN IT THROUGH THEIR COMPLEX MODELS AND SAY, THIS CAN PROVIDE RELIABLE SERVICE OR IT CAN'T.
OR IN ORDER TO GET RELIABLE SERVICE, YOU WOULD NEED TO ADD X, Y, AND Z TO TO MAKE IT A FIRM.
SO NOW I HEAR TWO FOR TWO SAYING BEHIND THE METER DOESN'T WORK.
SO WHO'S EVER LISTENING? PLEASE UNDERSTAND WHAT WE JUST HEARD.
THANKS. AND WE ALSO WANT TO HAVE THIS SAME TYPE OF A DISCUSSION REGARDING SMRS AND MICRONUCLEAR, WHICH THEY'RE SAYING ARE WAY OUT.
BUT WE THINK ONCE IT HAPPENS, IT'S GOING TO HAPPEN QUICKLY.
AND I KNOW YOU GUYS, YOU AND SRP ARE BOTH WAITING FOR THE TECHNOLOGY TO COME OR THE FUNDING. I THINK THE TECHNOLOGY IS ALREADY THERE.
SO WE'RE HOPING THAT WASHINGTON WILL START URGING THAT ALONG AS WELL.
YEAH. AND I THINK I MEAN, WE'VE BEEN WORKING WITH SRP AND TEP TO, TO EVALUATE NEW NUCLEAR OPTIONS IN ARIZONA.
[01:20:03]
YOU KNOW WHAT I WOULD SAY ABOUT THE SMRS, I THINK EVEN JUST YESTERDAY, I HEARD THE LARGEST SIZE IS ABOUT 300 TO 350MW ISH.THE LEVELS THAT WE'RE TALKING WITH A 20 GIGAWATT CU THERE COULD BE A REAL NEED FOR LIKE AN AP 1000, LIKE A FULL ON NUCLEAR FACILITY, RIGHT? NOT JUST THESE SMALL MODULAR, YOU CAN ALWAYS CHAIN THEM TOGETHER.
BUT, YOU KNOW, OUR STANCE HAS BEEN THAT WE DON'T WANT TO BE SERIAL NUMBER NUMBER ONE WHEN IT COMES TO THESE THESE ESSER MRS. BUT IF THERE'S KIND OF AN ADOPTION RATE THAT SHOWS THAT PROVES RELIABILITY PROVES THAT WE CAN DO THIS IN AN AFFORDABLE MANNER, THAT'S SOMETHING WE WOULD CONSIDER POTENTIALLY IN THE FUTURE. BUT IT'S, AGAIN, WE'RE OPEN TO KIND OF ALL NUCLEAR OPTIONS AND WORKING WITH THE OTHER UTILITIES IN ARIZONA TO DO THAT. YOU'RE GOING NUCLEAR AS WELL. BUT ALSO THE QUESTION IS, IS THAT IF WE KEEP HEARING THIS FROM ALL THE DIFFERENT POWER COMPANIES, WHO'S GOING TO BE FIRST? I DON'T WANT TO WAIT 20 YEARS.
SO I'M JUST SAYING SOMEBODY OR OR A COMBINED JOINT EFFORT MIGHT BE THE BEST WAY TO GO.
BECAUSE AGAIN, IF THIS IS FIVE YEARS OUT AND YOU COULD DO IT IN THREE YEARS MIGHT BE THE WAY TO WORK TOGETHER. AND, YOU KNOW, AGAIN, FINANCIALLY, IT SOUNDS LIKE LONG TERM THAT NUCLEAR IS GOING TO BE OR THESE MINI MINI NUKES ARE GOING TO BE THE FUTURE. BUT COME, COME BACK, COME BACK TO THE AGENDA.
THANK YOU. I KNOW I SAW YOU SO COME.
OKAY. ALL RIGHT. LET'S LET'S MOVE ON TO THE NEXT SLIDE.
SO AGAIN, I THINK WE TALKED A LITTLE BIT ABOUT THIS.
YOU KNOW, REALLY WHAT WE'RE LOOKING FOR IS IF WE'RE DOING THESE KIND OF BOX TWO TYPE OPTIONS, IT'S YOU GOT TO BRING SOMETHING THAT'S A FULL REQUIREMENTS PORTFOLIO THAT GIVES YOU RELIABLE SERVICE AS YOU EVALUATE THAT.
BUT AGAIN, IT COULD ACCELERATE SPEED TO SERVICE AND DOES PROVIDE SOME SOME PRICING BECAUSE YOU'RE A DEVELOPER WOULD BE FUNDING A SIGNIFICANT AMOUNT OF THAT OR THE COST OF ALL OF THAT INFRASTRUCTURE UPGRADES. THEY'RE GOING TO KNOW WHAT THEIR PRICING MODEL POTENTIALLY LOOKS LIKE FOR THAT 20 YEAR PERIOD.
SO WE CAN MOVE ON TO THE NEXT SLIDE.
SO AGAIN, YOU KNOW, BACK TO WHAT WE'RE LOOKING TO DO, YOU KNOW, WE'RE ASKING CUSTOMERS THAT ARE LOOKING FOR SERVICE THAT ARE OUTSIDE OF THAT, THE 4.5GW WE'VE COMMITTED TO, YOU'RE GOING TO HAVE TO MAKE COMMITMENTS TO US UNDER THAT, THAT LOAD COMMITMENT AGREEMENT THAT I TALKED ABOUT EARLIER.
THE STANDARD TERM IS 15 YEARS UNDER OUR KIND OF SUBSCRIPTION KIND OF BOX TWO.
IT'S IT'S LOOKING LIKE 20 YEARS WILL BE THE TERM.
BUT YOU'RE ALSO GOING TO HAVE TO ENSURE THAT YOU'RE ABLE TO FUND THE CAPITAL NEEDED TO SUPPORT EITHER OPTION IN A MANNER THAT DOES NOT IMPACT AFFORDABILITY TO OUR EXISTING CUSTOMERS AND PROTECTS THE COMPANY FINANCIALLY.
YOU KNOW, AGAIN, WE CAN'T GET OUR FINANCIAL METRICS IN A POSITION WHERE WE'RE DOWNGRADED FROM A CREDIT PERSPECTIVE THAT NOW HAS AN IMPACT TO ALL CUSTOMERS BECAUSE WE'RE NOW PAYING MORE FOR THE COST OF DEBT.
AND SO ALL OF THOSE THINGS ARE CONSIDERED AS WE'RE LOOKING AT THESE DIFFERENT OPTIONS.
AND, YOU KNOW, AGAIN, WE'RE OPEN TO WHATEVER TECHNOLOGIES THAT MAY BE. IF IT'S ESSER MRS IN THE FUTURE, YOU KNOW, I'M NOT IN THOSE CONVERSATIONS TODAY, BUT I MEAN, IT'S, IT'S, IT'S NOT OFF THE TABLE.
I WOULD THINK IF, IF THAT'S WHERE WE'RE GOING AS A COMPANY FROM A NEW GENERATION PERSPECTIVE. AND LASTLY, I MEAN, WE'RE GOING TO LOOK FOR WHOEVER THOSE CUSTOMERS ARE TO PROTECT US FROM A CREDIT PERSPECTIVE.
WE'RE GOING TO ASK THEM TO POST SIGNIFICANT COLLATERAL TO SAY IF IF THIS BECOMES A DATA CENTER BUBBLE AND YOU DISAPPEAR FIVE YEARS FROM NOW, WE NEED TO HAVE THE COLLATERAL TO SAY THAT, YOU KNOW, WE CAN CALL ON THAT TO PROTECT OUR OTHER CUSTOMERS FROM, YOU KNOW, WHATEVER COMMITMENTS WE MADE TO SERVE YOU. AND IT'S NOT PASSING THAT BACK TO OUR OTHER CUSTOMERS. SO THE COST OF A GENERATOR ARE SIGNIFICANT.
CORRECT. AND SO YEAH, AT THIS POINT, IF THERE'S ANY OTHER QUESTIONS, I'M HAPPY TO STAY.
OTHER QUESTIONS. THANK YOU VERY MUCH.
APPRECIATE IT. THANK YOU. THANK YOU.
SO LINDA GIVING YOU SOME LAST MINUTE ADVICE.
SO. GOOD MORNING. GOOD MORNING.
I WORK FOR SRP. I'M THE DIRECTOR OF TRANSMISSION PLANNING.
MY BOSS, ZACH HAIM GAVE THIS PRESENTATION PREVIOUSLY.
WE MISSED THE NAME CHANGE ON THE SLIDE.
APOLOGIZE. SO YOU'RE DEALING WITH NATE TATE.
THANKS FOR THE OPPORTUNITY TO COME AND TALK TO YOU ABOUT THE GROWTH THAT WE'RE EXPERIENCING DRIVEN LARGELY BY DATA CENTERS, BUT OTHER LARGE LOADS AS WELL.
AND SO HAPPY TO HAVE THE OPPORTUNITY TO TALK ABOUT THAT AND WHAT IT MEANS FOR SRP.
SO A LITTLE BIT ABOUT SRP BEFORE I JUMP INTO THE CONTENT.
SO WE'RE ONE OF THE NATION'S LARGEST PUBLIC POWER UTILITIES.
WE PROVIDE WATER AND POWER TO ABOUT 2 MILLION PEOPLE IN, IN THE VALLEY OF THE METRO PHOENIX AREA.
WE ALSO MANAGE A PRETTY EXTENSIVE WATERSHED THAT FEEDS INTO THE, THE VERDE AND SALT RIVERS.
NEXT SLIDE. SO WE SHARE A LOT OF THE SAME PRINCIPLES THAT YOU HEARD FROM APS,
[01:25:08]
AND WE'RE DEALING WITH THE SAME CHALLENGE AND HAVE COME TO A LOT OF THE SAME CONCLUSIONS.AND SO YOU'LL HEAR ME SAY A LOT OF THINGS THAT REALLY PARALLEL WHAT YOU HEARD FROM APPS, BUT I JUST WANTED TO PUT THE GROWTH IN PERSPECTIVE FOR YOU.
SO THIS CHART SHOWS HOW OUR PEAK LOAD PEAK DEMAND HAS GROWN GOING BACK OVER 100 YEARS TO 1920. AND SO YOU CAN SEE THAT THERE'S BEEN PERIODS OF TIME WHERE WE'VE DEALT WITH VERY SIGNIFICANT GROWTH RATES.
BUT WHEN YOU LOOK AT WHAT WE'RE DEALING WITH TODAY, THE AREA THAT'S DESIGNATED IN RED OVER THERE AND WHAT WE'RE FORECASTING TO EXPERIENCE IN THE FUTURE THAT THAT CHART REALLY SHOOTS, SHOOTS UP.
THIS IS REALLY UNPRECEDENTED GROWTH FOR US.
AND MAYBE TO PUT THAT IN PERSPECTIVE, WE CAN LOOK AT THE PERIOD OF TIME BETWEEN 1960 AND 1980. THAT WAS A BIG GROWTH PERIOD FOR CENTRAL ARIZONA.
WE SAW 7% ANNUAL AVERAGE GROWTH RATE.
BUT THAT ONLY EQUATED TO AN EXPANSION OF THE POWER SYSTEM OF 70, 72MW A YEAR. SO WE HAD TO EXPAND THE POWER SYSTEM SO WE COULD INCREMENTALLY DELIVER AN ADDITIONAL 72MW A YEAR ON AVERAGE DURING THAT PERIOD.
WHEN YOU LOOK AT WHAT WE'RE DEALING WITH TODAY AND THE NUMBERS ARE A LOT LARGER.
SO EVEN THOUGH THE GROWTH RATE IS SLIGHTLY LOWER, THAT THAT 5.7% GROWTH RATE EQUATES TO OVER 600MW A YEAR OF POWER SYSTEM EXPANSION.
SO OUR POWER SYSTEM TODAY DELIVERS A PEAK OF ABOUT 8500MW.
AND SO ADDING 600MW IN ADDITIONAL CAPACITY EVERY YEAR IS WHAT'S GOING TO BE REQUIRED FOR US TO DEAL WITH THE GROWTH THAT'S HERE.
NEXT SLIDE. THIS IS ANOTHER VIEW OF OUR GROWTH A SHORTER PERIOD OF TIME.
SO 2015 TO 2035. THE DASHED LINE IN THE CENTER THERE THAT DESIGNATES WHERE WE'RE AT TODAY. AND SO IT SHOWS SOME HISTORICAL DATA FROM A GROWTH STANDPOINT.
SO HISTORICALLY WE'VE GROWN AT ABOUT A 2% RATE.
AND THAT'S WHERE DATA CENTERS WOULD BE GREW AT ABOUT 4%.
HISTORICALLY 4.7%. BUT IF YOU LOOK AT WHAT WE'RE FORECASTING AND WHAT WE'RE DEALING WITH TODAY, YOU SEE A LOT OF OUR GROWTH BEING DRIVEN BY THE LARGE BUSINESS CUSTOMER CLASS, WHICH WOULD INCLUDE DATA CENTERS.
AND OUR FORECAST SHOWS IN 2035 THAT NEARLY 40% OF OUR PEAK DEMAND IS GOING TO COME FROM LARGE BUSINESS CUSTOMERS.
AND THAT'S SIGNIFICANT FOR A FEW REASONS.
THE OBVIOUS REASON IS WE HAVE TO BUILD A POWER SYSTEM THAT CAN SUPPLY THAT.
BUT LARGE LOAD CUSTOMERS HAVE A DIFFERENT LOAD PROFILE.
SO THE LOADS THAT WE HAVE TODAY ARE CYCLICAL.
YOU KNOW, IT'S PRETTY LOW IN THE MORNING, EARLY HOURS.
AND THEN AS FOLKS GET UP AND GO TO WORK AND BEGIN UTILIZING ENERGY, WE PEAK EARLY EVENING HOURS, WE PEAK, AND THEN WE COME BACK DOWN.
SO THAT KIND OF LOW PROFILE PRESENTS SOME OPPORTUNITIES FOR YOU TO PERFORM MAINTENANCE, TO DO OTHER THINGS TO THE SYSTEM, TO KEEP IT RELIABLE.
THESE LARGE BUSINESS CUSTOMERS, THEIR LOAD PROFILE IS A LOT FLATTER.
SO THEY'RE USING MORE ENERGY CONSISTENTLY THROUGHOUT THE DAY AND THE NIGHT.
AND SO YOU HAVE TO BUILD THE SYSTEM A LITTLE BIT DIFFERENTLY FOR IT TO CONTINUE TO BE RELIABLE. AND WHAT THAT MEANS IS MORE AND MORE INFRASTRUCTURE.
NEXT SLIDE. WE CAN JUMP TO THE NEXT ONE.
SO THIS LARGE INFLUX OF INTEREST FROM DATA CENTER CUSTOMERS HAS CAUSED US TO, TO CHANGE OUR PROCESSES A LITTLE BIT.
AND SO I'LL JUST TALK BRIEFLY ABOUT THE WAY WE PROCESS LARGE LOAD CUSTOMERS.
IN GENERAL. AND THEN I'LL TALK ABOUT THE SHIFT THAT WE'VE MADE.
I'M GOING TO GRAB MY BOTTLE OF WATER. BE RIGHT BACK. SURE.
LINDA, GIVE HIM A FULL BOTTLE OF WATER.
APOLOGIES. SO THE WAY WE STUDY THESE LARGE LOAD CUSTOMERS.
SO THEY COME TO US, THEY TALK TO US ABOUT THEIR PROJECT.
THEY GIVE US SOME CHARACTERISTICS, TELL US HOW BIG IT'S GOING TO BE AND WHAT WE'LL DO. SO THEY PROVIDE SOME FUNDING ALSO TO COVER THE COST OF THE STUDY.
WE HAVE A COMPUTER MODEL OF OUR ELECTRIC SYSTEM, AND WE CAN ADD THESE LOAD CUSTOMERS TO THAT MODEL, RUN SOME SIMULATIONS AND UNDERSTAND WHAT THE IMPACT IS TO THE SYSTEM.
[01:30:03]
AND SO YOU CAN IMAGINE, YOU KNOW, AT THE EXTREME END, 1000 MEGAWATT DATA CENTER WANTS TO INTERCONNECT.SO TO PUT THAT IN PERSPECTIVE, 8500 IS OUR PEAK NOW.
SO YOU ADD A LARGE 1000 MEGAWATT LOAD.
IT BREAKS SOME THINGS ON THE SYSTEM.
IT MAY REQUIRE ADDITIONAL INFRASTRUCTURE.
AND SO WE IDENTIFY WHAT THOSE NEEDS ARE.
AND WE ATTRIBUTE THE COST OF ALL OF THAT INFRASTRUCTURE TO THAT CUSTOMER.
SO THEY HAVE TO PAY THAT BEFORE WE'LL MOVE ON IN THE PROCESS AND ALLOW THEM TO INTERCONNECT. SO THE WAY WE USED TO DO THIS WAS IN A SERIAL FASHION.
AND TYPICALLY WE'D ONLY HAVE A HANDFUL OF CUSTOMERS THAT WOULD COME AND TALK TO US. AND SO, YOU KNOW, IN THIS EXAMPLE, IT'S JUST A WEEK.
WE GO THROUGH THAT PROCESS, WE TELL THEM WE NEED TO BUILD THREE NEW TRANSMISSION LINES. THIS IS HOW MUCH IT'S GOING TO COST.
YOU'RE GOING TO HAVE TO PAY THAT. WE GET ANOTHER CUSTOMER THE NEXT DAY WE GO THROUGH THE SAME PROCESS. BUT NOW WITH THAT CUSTOMER, WE'RE ASSUMING THAT WE'VE ALREADY ADDED THE TRANSMISSION LINES THAT WE ATTRIBUTED TO THE FIRST CUSTOMER. AND SO THESE MITIGATIONS BEGIN TO STACK.
AND SO YOU GET TO CUSTOMER FOUR.
YOU KNOW, WE MAY HAVE TEN NEW STATIONS AND HALF A DOZEN TRANSMISSION LINES THAT ARE BEING BUILT, AND THEY HAVE TO BE SEQUENCED TO SERVE THESE CUSTOMERS.
BUT INEVITABLY, WHAT HAPPENS IS SOMEONE HAS TO CHANGE THEIR PROJECT.
DIFFERENT LOCATION, THE SIZE OF THE PROJECT CHANGES.
AND BECAUSE WE'VE STACKED THESE UP, IT PUTS US IN A POSITION WHERE WE HAVE TO RESTUDY ALL OF THE PROJECTS TO REALLY UNDERSTAND WHAT THE IMPACTS ARE TO THE SYSTEM. AND THAT'S WHAT HAPPENS HERE ON FRIDAY WITH THE TOPPLING JENGA TOWER THERE.
SO IF YOU CAN SWITCH TO THE NEXT SLIDE.
SO WE'VE HAD TO MAKE AN ADJUSTMENT AND STUDY ALL OF THESE CUSTOMERS AT ONCE.
WE CALL IT THE CLUSTER APPROACH.
SO INSTEAD OF STUDYING THEM ONE AT A TIME WE'RE TAKING A GROUP OF THEM.
SO WE'RE DOING THIS FOR THE VERY FIRST TIME RIGHT NOW.
THERE'S 24 CUSTOMERS. THEY'RE ALL DATA CENTER CUSTOMERS.
WE PUT THEM ALL IN THE COMPUTER MODEL.
WE'RE STUDYING THEIR PROJECTS AND UNDERSTANDING WHAT THE IMPACTS ARE GOING TO BE TO THE SYSTEM. AND WE'RE GOING TO ATTRIBUTE THAT COST TO ALL OF THE CUSTOMERS THAT ARE IN THAT CLUSTER GROUP.
THEIR COSTS WILL VARY BASED ON THE SIZE OF THEIR PROJECT AND THEIR UTILIZATION OF THE NEW INFRASTRUCTURE. BUT THAT'S THE WAY WE'RE DOING IT, AND IT'S ALLOWING US TO GET THROUGH THE PROCESS MUCH QUICKER, PROVIDE AN UNDERSTANDING TO THE CUSTOMERS WHAT IT'S GOING TO TAKE FROM AN INVESTMENT STANDPOINT TO, TO INTERCONNECT, AND ALSO PUT US IN A POSITION WHERE WE HAVE A REALLY HOLISTIC PLAN TO BUILD THIS INFRASTRUCTURE TO SERVE THOSE CUSTOMERS.
NEXT SLIDE. SO THIS IS A VIEW OF THE LARGE BUSINESS CUSTOMERS THAT ARE IN OUR QUEUE. AND SO THERE'S A GEOGRAPHIC VIEW OF THE PHOENIX METRO AREA.
THAT GEOGRAPHIC VIEW CORRELATES WITH THE CHART YOU SEE ON THE RIGHT THE COLUMN IN THE CENTER. THOSE ARE PROJECTS THAT CAME AND TALKED TO US BEFORE WE MADE THIS ADJUSTMENT TO THE CLUSTER STUDY APPROACH.
AND SO ABOUT SEVEN GIGAWATTS WORTH OF LOAD, 35 PROJECTS THAT ARE BEING STUDIED.
AND THEN WE HAD THE 24 PROJECTS IN OUR CLUSTER A LITTLE OVER 7000MW THERE.
AND THEY'RE CURRENTLY BEING PROCESSED.
ULTIMATELY, WHAT ALL OF THESE CUSTOMERS WILL RECEIVE IS AN UNDERSTANDING OF THE INFRASTRUCTURE THEY'RE GOING TO HAVE TO FUND TO BE BUILT SO THAT WE CAN CONTINUE TO OPERATE THE SYSTEM RELIABLY IN A TIMELINE FOR ALL OF THAT INFRASTRUCTURE.
AND THE TIMELINE HAS REALLY BEEN A CHALLENGE BECAUSE YOU CAN IMAGINE, I MEAN, THIS IS NEARLY TRIPLING THE SIZE OF SRP.
AND SO THE AMOUNT OF TIME IT TAKES TO BUILD ALL OF THAT INFRASTRUCTURE, IF THESE PROJECTS MOVE FORWARD, THEY WON'T ALL MOVE FORWARD.
BUT IF THEY MOVE FORWARD, IT'S GOING TO TAKE, YOU KNOW, SEVEN, EIGHT, TEN YEARS TO GET SOME OF THIS BUILT.
THAT WAS THE LAST SLIDE I HAD.
QUESTIONS. ANY QUESTIONS FOR MR. TATE? ALL BURNED UP MR. VOGEL BEFORE. OKAY. I YEAH, I GUESS YOU SHOULD JUST SAY DITTO BECAUSE IT'D BE A LOT EASIER AND QUICKER.
I MEAN, AGAIN, CAN YOU JUST ADDRESS A FEW OF THOSE THAT WE ASKED? I MEAN, INSTEAD OF GOING OVER THE WHOLE THING AGAIN, I'M SURE THEY'RE THE SAME EXACT ANSWERS.
I'M SORRY HE HAD TO GO FIRST AND HAD ALL THOSE, BUT MAYBE JUST ADDRESS A FEW OF THE HIGHLIGHTS OF THE QUESTIONS WE ASKED EARLIER.
SURE, SURE I CAN. SO THE COST SHIFTING QUESTION.
SO WE'RE DOING VERY SIMILAR THINGS TO AVOID COST SHIFTING BETWEEN THESE LARGE LOAD CUSTOMERS, I DESCRIBED THE STUDY PROCESS.
[01:35:03]
ALL OF THAT NETWORK UPGRADE INFRASTRUCTURE THAT NEEDS TO BE BUILT.WE'RE GOING TO GET THAT FUNDING BEFORE WE'RE GOING TO WE'RE GOING TO HAVE THAT FUNDED SO WE CAN BUILD IT. WHEN IT COMES TO THE RESOURCES THAT ARE GOING TO BE REQUIRED TO SERVE THOSE LOADS, A SIMILAR RATE PLAN.
THERE'S AN 80% DEMAND CHARGE WITH SOME COLLATERAL REQUIREMENTS TO ENSURE THAT WE'RE NOT SHIFTING NOT ONLY THE COST, BUT THE RISK FROM THESE LARGE LOAD CUSTOMERS ONTO OUR RESIDENTIAL CUSTOMERS.
I'M TRYING TO THINK THROUGH WHAT SOME OF THE OTHER CONCERNS WERE. SO LIKE THE RATE, YOU KNOW, IF YOU'RE LOOKING TO ADJUST RATES, YOU'RE GOING MORE AFTER THE DATA CENTER OR THE BIG USER, AS OPPOSED TO OUR RESIDENTS WHO HAVE ALREADY GOTTEN SIGNIFICANT INCREASES OVER THE YEARS. CORRECT.
AND THEN THE SAME THING WITH THE BEHIND THE METER SITUATION.
YOU HAPPEN TO AGREE? I ASSUME YOU WOULD AGREE WITH APS THAT IT'S NOT LIKELY THERE'S AN ISSUE WITH POWER LONG TERM, THESE GENERATORS HAVE TO RUN 24 OVER SEVEN.
THERE COULD BE A BIG WATER USE.
YEAH WE WE AGREE WITH THAT ASSESSMENT.
THAT'S A THAT'S A CHALLENGING ARRANGEMENT TO COME TO.
AND I DON'T THINK IT'S VERY LIKELY.
AND AGAIN, IF WE'RE DEALING WITH PEOPLE WHO ARE COMING BEFORE US, WHETHER IT'S SOLAR DATA, WE HAVE TO KNOW.
AND YOU WOULD BE ABLE TO COMMUNICATE WITH US TO SAY YES OR NO.
AND THAT'S HOW WE KNOW AS A BOARD THAT WHETHER WE SAY YAY OR NAY, WE NEED TO KNOW WHERE THIS POWER IS COMING FROM.
YEAH, YEAH. THE DATA CENTER WOULD HAVE AN AGREEMENT, SOME SIGNED AGREEMENT WITH US WHERE WE'VE ACCEPTED THEIR COLLATERAL, WHERE WE'VE TAKEN FUNDING FOR THE NETWORK UPGRADES.
THEY HAVE SOME AGREEMENTS THEY'D BE ABLE TO SHOW YOU.
OR IN THE ASPECT OF THAT, WOULD IT BE.
WELL, WE'RE WORKING WITH THEM.
THAT DOESN'T REALLY. IFS, MAYBES AND BUTS DON'T WORK FOR ME.
I ASSUME THAT'S ASSUMED FOR YOU. SAME FOR YOU.
IT IS. YEAH. IT'S A CHALLENGING ENVIRONMENT. YOU SAW WE HAD 52 CUSTOMERS THAT WERE WE'RE WORKING WITH NOW. WE DON'T EXPECT THEM ALL TO MOVE FORWARD.
SUPERVISOR GOODMAN YEAH, I THINK PROBABLY IT WOULD BE HELPFUL IS IF IF YOU'VE GOT ANY OF THE CU BETWEEN YOU AND SHAPS SORRY ABOUT THAT.
I ALMOST CALLED YOU SRP APOLOGIZE, BUT IF I IT WOULD BE HELPFUL FOR US AS A COUNTY TO KNOW, AND WE PROBABLY DO ON SOME OF THESE PROJECTS.
I JUST YOU KNOW, AS FAR AS BECAUSE A LOT OF THESE HAVE NDAS AND SO ON AND SO FORTH, KIND OF GIVE US AN IDEA.
I WOULD LIKE TO SEE SOMETHING TO WHERE WHICH MAKES MOST SENSE AS FAR AS BEING ABLE TO DELIVER THE WITHOUT A LOT OF OF.
DO YOU GUYS HAVE GEOGRAPHICAL LOCATIONS THAT YOU COULD SAY YOU COULD LOCATE IT HERE? THAT WOULDN'T REQUIRE A LOT OF INFRASTRUCTURE, THAT YOU COULD BE ABLE TO MEET THE DEMANDS OF WHAT THEY'RE REQUESTING? I MEAN, YOU PROBABLY HAVE THAT KIND OF DATA THAT WOULD BE HELPFUL NOT ONLY FOR THEM, BUT I THINK FOR US AS WELL.
SO THAT AS WE LOOK AT IT, DO YOU UNDERSTAND MY QUESTION? YEAH. THAT'S A THAT'S A CHALLENGING, I KNOW.
SUPERVISOR MCCLURE HAD A LOOK ON HIS FACE LIKE YOU'RE WATCHING TOO MANY YOUTUBE LIKE NOT WATCH IT. YEAH. THAT'S A REALLY CHALLENGING QUESTION.
YOU KNOW, ON, ON THE SYSTEM, THERE ARE SOME AREAS THAT MAY BE BETTER EQUIPPED TO SERVE THAN OTHERS.
THE CHALLENGE IS THAT THESE NUMBERS ARE SO HUGE.
OKAY. SO, YOU KNOW, IF YOU'RE TALKING ABOUT A TEN MEGAWATT PROJECT OR A 15 MEGAWATT PROJECT. I THINK WE CAN DIRECT YOU WITH SOME CONFIDENCE, AND WE CAN PROVIDE THAT ADVICE TO YOU WITH SOME CONFIDENCE.
BUT WHEN YOU TALK ABOUT 500 MEGAWATT PROJECTS, THAT'S AN INFRASTRUCTURE ISSUE FOR YOU.
EVERY, EVERY PLACE, EVERY PLACE FOR THAT, BECAUSE IT'S GOING TO TAKE A LOT OF TIME TO BUILD THE INFRASTRUCTURE AND IT'S GOING TO BE VERY EXPENSIVE. OKAY. YEAH.
THAT TELLS US WHAT WE'RE UP AGAINST.
ANY OTHER QUESTIONS FOR MR. TATE? THANK YOU VERY MUCH.
APPRECIATE YOUR TIME. THANK YOU.
DOES THIS INCLUDE THE SERMON OR HAVE WE GOT MORE? NO, I THINK WE HAD AC AYE.
OH, YEAH. I'M SORRY ABOUT THAT.
NOT TRYING TO LEAVE YOU OUT. JUST SITTING OUT THERE DOING NOTHING. YOU KNOW? NO WORRIES.
AND I APPRECIATE YOU GUYS HOSTING THIS.
OKAY. MAYBE BEFORE I START, I'LL INTRODUCE MYSELF.
RYAN REESE, I'M THE EXECUTIVE VICE PRESIDENT AT THE ARIZONA COMMERCE AUTHORITY, I LEAD OUR ECONOMIC DEVELOPMENT GROUP.
SO PROJECTS, ATTRACTIONS, MANUFACTURING, DATA CENTER, ALL THE GAMBIT WE WORK THROUGH US TO LOCATE IN PINAL COUNTY AND OTHER COUNTIES ACROSS THE
[01:40:01]
STATE. ONE OF THE MAYBE POINT OF CLARIFICATIONS I WANTED TO ADD BEFORE I START WITH MY PRESENTATION IS ON THE PORTION TALKING ABOUT HOW DO YOU GUYS KNOW KIND OF WHO'S COMING INTO YOUR BACKYARD ESSENTIALLY, AND ARE THEY WORKING WITH POWER UTILITY PROVIDERS? ONE OF THE THINGS IS, IS THE KIND OF ORDER OF OPERATIONS IS THE ZONING PIECE HAS TO BE IN PLACE FIRST BEFORE THEY GET INTO ANY TYPE OF AGREEMENT WITH THE ANY UTILITY REALLY, BECAUSE YOU'RE TALKING ABOUT HUNDREDS OF MILLIONS OF DOLLARS BEING SPENT IN THOSE AGREEMENTS.SO THEY WANT ZONING TO DE-RISK THEIR, THEIR PROJECT BEFORE THEY WOULD GET ANY INTO ANY TYPE OF OFFICIAL AGREEMENT WITH A UTILITY GROUP, WITH THOSE PROJECTS. SO WE HAD SOME GREAT PRESENTATIONS TODAY ALREADY, BUT I'M GOING TO WALK THROUGH SOME OF THE LATEST DATA AND TECHNOLOGY AND SOME OF THE REAL WORLD PROJECTS THAT WE'RE SEEING AT THE COMMERCE AUTHORITY.
I THINK IT'S AN IMPORTANT ASPECT, BECAUSE A LOT OF WHAT WE'RE TALKING ABOUT HERE TODAY, AND WHAT WE'LL BE TALKING ABOUT IN THE FUTURE IS DATA CENTERS THAT WILL LOCATE HERE. A LOT OF THE MAYBE MISCONCEPTION WITH NARRATIVE IS THAT A LOT OF NARRATIVE COMES FROM KIND OF OLD TECHNOLOGIES OR OLDER TECHNOLOGIES OF DATA CENTERS THAT HAVE LOCATED FIVE, TEN, 20 YEARS AGO.
AND SO I THINK IT'S IMPORTANT TO KIND OF IDENTIFY THAT.
AND THEN ONE LAST THING BEFORE I START SERVERS VERSUS DATA CENTERS, I THINK ON THE SERVER SIDE, YOU'RE TALKING FILES, RIGHT? YOU'RE TALKING KIND OF LOCAL.
IT AN OFFICE DATA CENTERS, YOU'RE, YOU'RE TALKING COMPLEX DATA SETS, YOU'RE TALKING AUTONOMOUS VEHICLES TELEHEALTH AND THESE MORE COMPLEX THINGS THAT MAYBE AN INDIVIDUAL SERVER ROOM OR COULD NOT HANDLE.
SO ON THE DATA CENTER SIDE, I THINK WAYMO'S RIGHT.
THINK ROBOTICS, THINK VERTICAL AND TAKE OFF LANDING VEHICLES THAT ARE ALL AUTONOMOUS AND THINK THOSE KIND OF OPERATIONS.
AND I BRING THAT UP BECAUSE THE PROXIMITY THING IS ALWAYS A DEBATE BACK AND FORTH.
DOES IT MATTER KIND OF WHERE THEY'RE AT? AND I'LL GET INTO THAT IN MY PRESENTATION. BUT ONE OF THE REASONS IT WILL MATTER IS THE MORE COMPLEX THOSE OPERATIONS GET, THE MORE IMPORTANT THAT THE LATENCY, THE LATENCY IS REDUCED AS CLOSE TO ZERO AS POSSIBLE. THE ONE THING I ALWAYS THINK OF IS WHEN THEY START DOING PROCEDURES IN HOSPITALS WITH LIKE OPERATING, EVEN IF IT'S A REMOTE OPERATION, WHEN LIKE A SURGEON STOPS MOVING HIS HAND, YOU WANT HIM TO STOP MOVING HIS HAND RIGHT THEN AND THERE, RIGHT? THAT LATENCY IS SIGNIFICANT.
AND SO I'LL GET RIGHT INTO MY PRESENTATION WITH THAT.
SO AT A HIGH LEVEL, DATA CENTERS, THEY'RE NOT JUST REAL ECONOMIC DEVELOPMENT OPPORTUNITIES, RIGHT? BUT WE'RE TALKING ABOUT CRITICAL INFRASTRUCTURE.
I THINK WE HEARD IT MENTIONED A COUPLE TIMES ABOUT THE NATIONAL SECURITY PERSPECTIVE ON THIS. AND SO ANOTHER REASON WHY WE REALLY WANT TO MAKE SURE THAT THIS DATA CENTER GROWTH THAT WE'RE SEEING IS HAPPENING IN THE US VERSUS ARGENTINA OR CHINA OR NORTH KOREA OR OTHER AREAS, RIGHT? YOU THINK OF THESE SYSTEMS SUPPORT OUR MILITARY, OUR FINANCIAL MARKETS, HEALTH CARE SYSTEMS AND REALLY ALL OF OUR DOMESTIC INFRASTRUCTURE.
AND WHAT WE'RE SEEING IS THAT THE LOCATION DOES MATTER.
INCREASINGLY THE NATIONAL FOCUS IS REALLY ON BUILDING THE CAPACITY IN THE U.S., THE U.S. DOES HAVE THE LARGEST DATA CENTER MARKET RIGHT NOW.
I THINK WE HOLD A 44% SHARE OF THE DATA CENTER MARKET.
AND CHINA IS RIGHT BEHIND US AT JUST UNDER 30%.
BUT WHAT KIND OF PUTS THAT ON ITS HEAD IS THAT THE DATA CENTER MARKET IS EXPECTED TO DOUBLE BY 2030. SO WHEN YOU'RE TALKING ABOUT THAT DELTA OF 14%, IF IT'S GOING TO DOUBLE BY 2030, THERE'S NO TELLING WHERE IT'S GOING TO BE AND WHERE WE WANT OUR INFORMATION HELD. AND THE MORE COMPLEX THE DATA SETS, THE DATA CENTERS KIND OF TABULATE ARE, THE MORE WE WANT TO ENSURE THAT THEY'RE LOCAL. AND THEN WITH DATA CENTERS, THEY WANT TO BE IN KIND OF THESE STABLE AREAS, THESE STABLE REGIONS. THAT'S WHY ARIZONA IS VERY KIND OF POPULAR AREA FOR DATA CENTERS TO LOOK. WE TALK ABOUT NO NATURAL DISASTERS, A VERY STABLE BUSINESS ENVIRONMENT.
AND THEN THE GROWING POPULATION AND THE GROWING ADVANCED MANUFACTURING THAT WE HAVE HERE. ALL OF THOSE ARE COMPONENTS TO WHY THESE DATA CENTERS WANT TO BE IN ARIZONA AS A STATE. I THINK EVERYBODY'S NOTICED THAT WE'VE BECOME THIS ADVANCED MANUFACTURING HUB, RIGHT? AND SLOWLY BUT SURELY, WHAT WE'RE CONTINUING TO BECOME A PART OF AS WELL IS THIS DIGITAL BACKBONE OF THE COUNTRY.
THESE DATA, THESE DATA CENTERS THAT ARE CONTINUING TO GROW IN ARIZONA.
MESA HAS A GOOD CHUNK OF THEM.
PHOENIX ALSO HAS A GOOD CHUNK OF THESE DATA CENTERS THAT ARE GROWING IN ARIZONA, AND A MAJORITY OF THEM ARE RUNNING ON SOME OF THE LATEST TECHNOLOGY, SOME OF THAT TECHNOLOGY BEING PROVEN RIGHT HERE IN THE STATE.
SO THESE DIGITAL INFRASTRUCTURE PROJECTS, THEY, THEY'RE WORKING REALLY WITH ARTIFICIAL INTELLIGENCE, CLOUD COMPUTING.
WE MENTIONED THE HEALTH CARE SYSTEMS, FINANCIAL SERVICES, BUT ALSO ON MAIN STREET, RIGHT? THE SMALL BUSINESS, DIGITAL SERVICES, A LOT OF THIS STUFF, WHEN A SMALL BUSINESS DOESN'T HAVE A FULL MARKETING TEAM, THEY GO TO CHATGPT OR SOME TYPE OF AI TO TO HELP WITH THEIR MARKETING.
AND SO IT'S NOT JUST THESE MAJOR CORPORATIONS, BUT THESE SMALL BUSINESSES THAT USE IT AS WELL, RIGHT?
[01:45:02]
NEARLY EVERY DIGITAL INTERACTION THAT HAPPENS TODAY, FROM TELEHEALTH TO FINANCIAL SERVICES, ALL OF THAT GOES THROUGH A DATA CENTER IN ONE SHAPE, ONE SHAPE OR FORM.AND ALL OF THAT DEPENDS ON INFRASTRUCTURE.
AND SO RIGHT NOW, I MENTIONED BY 2030, THERE'S EXPECTED TO DOUBLE THE THE FOOTPRINT OF DATA CENTERS. WHERE THAT GOES IS REALLY GOING TO BE DEPENDENT ON WHERE IT'S WELCOME.
RIGHT. AND I DON'T NECESSARILY JUST MEAN ARIZONA, BUT WHAT COUNTRY IT'S MOST WELCOME IN.
THAT'S WHERE THOSE ARE GOING TO LOCATE. SO THE QUESTION REALLY IS WHO'S GOING TO CAPITALIZE ON IT AND WHO'S GOING TO KIND OF PLAN IT INTO THEIR DEVELOPMENT.
AND I THINK THAT'S WHERE WE HAVE A STRATEGIC ADVANTAGE AS A STATE. AND I THINK THAT'S WHERE PINAL COUNTY HAS A STRATEGIC ADVANTAGE AS WELL. IF YOU LOOK HERE, WE'VE HEARD A LOT ABOUT THE WATER USE OR I THINK THE PRESENTATION BEFORE ME REALLY TOUCHED ON REALLY MAYBE LIKE THE LACK OF WATER USE, RIGHT? BUT A LOT OF THE TECHNOLOGY, ALL THE PROJECTS WE'RE SEEING SITE IN THE LAST YEAR AND IN THE NEXT 3 TO 5 YEARS, ALL OF THEM ARE USING CLOSED LOOP SYSTEMS. AND WHAT THAT CLOSED LOOP SYSTEM IS, IS ONE INJECTION OF WATER.
AND THEN FROM THERE, THERE'S A THERE'S A SLIGHT TOP OFF AFTER THAT.
BUT WHAT THAT ISN'T IS CONSTANT LIKE EVAPORATIVE.
THINK OF LIKE AIR CONDITIONING VERSUS LIKE EVAPORATIVE COOLING, RIGHT? LIKE YOU'RE NOT SEEING CONSTANT WATER GO IN AND OUT AND RUSH THROUGH OUR, OUR WASTEWATER TREATMENT FACILITIES.
SOME OF THE HEADLINE NEWS OF WATER CONTAMINATION, AS YOU WERE MENTIONING EARLIER, A LOT OF THAT IS DUE TO THE EVAPORATIVE SYSTEMS BECAUSE WATER IS CONSISTENTLY LEAVING THE SYSTEM.
AND IT IS A IT IS ACTUALLY AN INFRASTRUCTURE BREAKDOWN AT A DATA CENTER BREAKDOWN.
BUT WHEN IT'S CONSISTENTLY LEAVING THE SYSTEM LIKE THAT, IT'S HARDER TO PINPOINT.
LIKE, WHEN DID THAT START? HOW LONG HAS IT BEEN GOING ON VERSUS A CLOSED LOOP SYSTEM? IT'S MUCH MORE EASY TO CONTROL AND MONITOR AND IDENTIFY IF THERE IS ANY BREAKS IN THE INFRASTRUCTURE. SO A COUPLE OF THINGS HERE.
THE OTHER THING THAT IS INTERESTING ABOUT THIS, THIS CATEGORY OR THIS INDUSTRY IS THAT A LOT OF THE RESEARCH DONE IN THIS INDUSTRY, THE SECOND IS PUBLISHED IS, IS VERY MUCH OUTDATED ALREADY.
AND I MENTIONED THAT BECAUSE THE TECHNOLOGIES JUST ADVANCES SO FAST, I THINK MICROSOFT IS THE FIRST ONE WHO'S INCORPORATED THIS KIND OF CLOSED LOOP SYSTEM, RIGHT. AND THEY'VE INCORPORATED IT RIGHT HERE IN PHOENIX, ARIZONA. AND WITH THAT, THEY SAW A SIGNIFICANT DECREASE IN THE WATER USE, JUST THE ONE KIND OF INJECTION INTO THE FACILITY.
BUT ALL OF THESE LIKE BREAKTHROUGHS IN TECHNOLOGY IN THIS INDUSTRY, AS SOON AS YOU KIND OF GET A REPORT OUT OF, HERE'S WHAT THE DATA THE DATA CENTER INDUSTRY IS DOING. THE VERY NEXT DAY, THE VERY NEXT WEEK, YOU SEE THE TECHNOLOGY UPGRADING, MODERNIZING, AND THAT'S JUST IN THE OPERATIONAL PIECE OF THE WATER USE.
BUT THERE'S ALSO THE CHIP SIDE.
YOU GUYS HEAR THAT IN ARIZONA, WE'RE MAKING SOME OF THE MOST ADVANCED CHIPS IN THE WORLD IN NORTH PHOENIX.
AND A LOT OF THOSE CHIPS ARE GOING INTO DATA CENTER SETS.
AND WHETHER IT BE TSMC OR AMKOR THAT CONTINUE TO EVOLVE THEIR DATA, THEIR CHIP SETS AND THEIR ADVANCED PACKAGING, THAT WILL CONTINUE TO ADVANCE HOW WELL RESOURCED AND HOW WELL THESE DATA CENTERS USE THESE RESOURCES. SO A COUPLE OF THINGS I'M GOING TO.
I THINK THE THREE MAJOR CATEGORIES THAT WE TYPICALLY TOUCH ON WITH DATA CENTER REALLY DO ARE POWER, WATER, AND THEN COMMUNITY IMPACT AND ECONOMIC IMPACT, RIGHT. THE COMMUNITY AND ECONOMIC IMPACT I CAN BUNCH INTO ONE.
SO ON POWER, THIS IS A COMMON CONCERN THAT WE HEAR ACROSS EVERY.
THE COST OF THE EXISTING CUSTOMERS.
I THINK YOU HEARD FROM OUR ELECTRIC UTILITIES ALREADY, RIGHT? IT'S THE IT'S THE KIND OF THE STRATEGIC PARTNERSHIP FOR GROWTH OR THE PAY FOR GROWTH PHILOSOPHY THAT THE APS AND SRP HAVE AND TEP HAS AS WELL.
AND THIS, I THINK THEY DID A GREAT JOB AT LEARNING FROM THE MISTAKES OF OTHERS, MAYBE LEARNING FROM UNREGULATED MARKETS ACROSS THE COUNTRY, LEARNING FROM OTHER REGULATED MARKETS AND REALLY SEEING LIKE, HOW DO WE NOT LEAVE EXCESS CAPACITY OR STRANDED COSTS ON THE RATEPAYER? AND HOW DOES THAT GO DIRECTLY TO THE END USER THAT'S INCURRING THOSE COSTS? AND SO WITH THEIR, WITH THEIR PROGRAM AND THAT KIND OF PAY FOR GROWTH PHILOSOPHY, IT'S REALLY BEEN EFFECTIVE AND IT REALLY SEPARATES THE HYPERSCALERS OR THE PEOPLE THAT ARE THE COMPANIES THAT ARE REALLY LOOKING TO GROW IN THE AREA VERSUS MAYBE THE MORE SPECULATIVE PROJECTS. AND JUST LIKE ANY OTHER TYPE OF PROJECT, WHETHER IT BE MANUFACTURING OR IN R&D OR DATA CENTER.
THERE'S THERE'S DEFINITELY GREAT PARTNERS THAT HAVE.
AND THERE'S MAYBE NOT SO GREAT PARTNERS TO HAVE. RIGHT. AND WHEN YOU TALK ABOUT THE HYPERSCALERS AND YOU TALK ABOUT STAYING AT THE CUTTING EDGE OF DATA CENTER OR ADVANCED MANUFACTURING, THOSE ARE THOSE ARE THE GROUPS YOU WANT TO BE WITH. YOU WANT TO BE WITH THE HYPERSCALERS AS THEY ADVANCE THEIR TECHNOLOGY AND THEY ADVANCE THEIR TECHNOLOGY IN OUR STATE. THE ONE, THE OTHER THING TO INCLUDE ON THE POWER SIDE IS I THINK THEY TOUCHED ON IT, BUT IT INCLUDES GENERATION TRANSMISSION AND DISTRIBUTION UPGRADES, RIGHT? SO THERE IS NO COST KIND OF UNSEATED WHEN IT COMES TO THESE EXTREME USERS.
[01:50:04]
AND WHETHER IT BE A ADVANCED MANUFACTURER THAT'S A VERY HIGH USER OR A DATA CENTER THAT'S A VERY HIGH USER.ON THE UTILITY SIDE, THEY'RE BUNCHED INTO THE SAME BUCKET.
SECOND ONE WE'LL TALK A LITTLE BIT ABOUT IS NOISE.
SO ONE OF THE ONE OF THE NARRATIVES THAT GOES AROUND MORE COMMONLY IS YOU CAN ALWAYS HEAR THE NOISE OR THE BUZZ OF THE DATA CENTERS.
A LOT OF WHERE THAT COMES FROM IS ACTUALLY THE COOLING TOWERS FROM THE EVAP SYSTEMS, THE NEWER SYSTEMS, THE CLOSED LOOP SYSTEMS HAVE DONE AWAY WITH THAT STACK AND THAT COOLING TOWER. SO THAT BUZZ IS NO LONGER ACTUALLY A FACTOR.
45 TO 50 DBA IS WHERE THESE MODERN DATA CENTERS ARE HAVE THEIR KIND OF NOISE AT.
AND WE EQUATE THAT TO LIKE A SIDE RESIDENTIAL STREET OR LIKE A CONVERSATION IN A BACKYARD.
SO AT THE END OF THEIR PROPERTY LINE, THAT'S THE VOLUME THAT YOU'LL HEAR AT THE END OF THEIR AT THE END OF THEIR SITE.
SO LAST ONE. SO ECONOMIC IMPACT.
AND SO THIS IS MORE COMMUNITY COMMUNITY ENGAGEMENT, RIGHT? I THINK A SINGLE HYPERSCALER CAMPUS TYPICALLY REPRESENTS 1 TO $1 BILLION IN CAPITAL INVESTMENT INTO THEIR DATA CENTER CAMPUS.
TYPICALLY, IT'S 1 TO 4 FACILITIES IS WHAT WOULD CONSTITUTE A DATA CENTER CAMPUS DURING CONSTRUCTION THAT CAN BE ANYWHERE FROM 500 TO 2000 CONSTRUCTION JOBS.
THE INTERESTING THING ABOUT THESE TYPICALLY CATEGORIZED CONSTRUCTION JOB AS TEMPORARY JOBS, RIGHT? THESE THESE DATA CENTERS, THOUGH THEY WORK IN PHASES.
SO TYPICALLY IT'S 2 TO 4 PHASES.
THE CONSTRUCTION WILL TAKE TWO YEARS FOR THEIR FIRST PHASE, 2 TO 3 YEARS. AND THEN THEIR SECOND PHASE AN ADDITIONAL 2 TO 3 YEARS.
AND SO IF THEY'RE DOING FOUR BUILDINGS OR IN FOUR PHASES, SO IT CAN ALMOST GO PAST TEN YEARS UP TO THE 12 YEAR MARK FOR THESE QUOTE UNQUOTE, TEMPORARY JOBS, RIGHT? AND I THINK THAT'S AN IMPORTANT KEY THING TO TOUCH ON THE ACTIVITY SUSTAINED OVER A LONG PERIOD OF TIME FOR THESE CONSTRUCTION JOBS.
BUT THEN THE OTHER KIND OF MISNOMER, ESPECIALLY WITH THESE ADVANCED FACILITIES, IS THE PERMANENT JOBS, ESPECIALLY WITH THE HYPERSCALERS.
WE'RE REALLY TALKING ANYWHERE BETWEEN 200 AND 500 FULL TIME EMPLOYEES.
FOR THESE DATA CENTER CAMPUSES, AND THOSE ARE LIKE HYPERSCALE SPECIFIC, HYPERSCALER SPECIFIC IN THESE KIND OF AI FOCUSED DATA CENTERS, WHICH IS A, I THINK, A BIG MISNOMER FROM MAYBE THE TRADITIONAL NARRATIVE OF LIKE WHAT DATA CENTER STAFFING LOOKS LIKE.
AND BECAUSE A LOT OF THAT, A LOT OF THAT WAS REALLY REFERENCING ADVANCED SERVER ROOMS OR CO-LOCATED DATA CENTER FACILITIES WHERE EVERY COMPANY OWNS JUST A SMALL PORTION. BUT WHEN YOU'RE IN A HYPERSCALER AND IT'S ALL ONE COMPANY, THERE'S A SIGNIFICANT, THERE'S A SIGNIFICANTLY LARGER NUMBER OF, OF EMPLOYEES IN EACH OF THOSE CENTERS.
WHAT WOULD YOU SAY THE PAY SCALE WOULD BE ROUGHLY IN SOMETHING LIKE THAT? GREAT QUESTION. SO THAT'S WHERE WE'RE AT RIGHT HERE.
SO WHEN YOU LOOK RIGHT HERE, DATA CENTER TECHNICIANS AVERAGING $75,000 FACILITIES AND OPS MANAGERS AVERAGING 145,000 IN THESE NETWORK AND SYSTEM ENGINEERS, 10,000. ALL OF THOSE WE.
AT THE ACA, WE TALK ABOUT BEING WELL ABOVE THAT KIND OF PRODUCTION WAGE, RIGHT? AND ALL OF THOSE, WHETHER YOU'RE IN RURAL OR METRO OR SERVE AS WELL ABOVE OUR PRODUCTION WAGE FOR QUALIFYING FOR INCENTIVES.
THE OTHER INTERESTING COMPONENT IS THE THREE TIMES MULTIPLIER, RIGHT? THE INDIRECT OR THE INDUCED JOBS.
THAT'S A CRITICAL PATH BECAUSE WHEN YOU COMPARE THESE THESE COMPANIES, THESE DATA CENTERS, THIS IS NEW MONEY COMING INTO THE STATE, COMING INTO THE COUNTY.
AND SO THAT'S NEW MONEY COMING IN AND NEW MONEY BEING SPENT, NOT NECESSARILY MONEY JUST GETTING RECYCLED THROUGH THE SAME MUNICIPAL AREAS OR THE SAME COUNTY. AND SO THAT'S A, THAT'S A GREAT THING TO KIND OF HIGHLIGHT, ESPECIALLY WHEN YOU DO HAVE UP TO 2000 CONSTRUCTION WORKERS OR 500 PERMANENT PEOPLE OUTSIDE, YOU'RE TALKING ABOUT LONG TERM ECONOMIC BENEFIT.
AND THEN I'M GOING TO GO BACK ONE.
BUT ON THIS SLIDE, THIS IS REALLY JUST A, AT A GLANCE OF MAYBE SOME OF THE OLDER ASSUMPTION AND OLDER NARRATIVE THAT'S OUT THERE VERSE, SOME OF THE CURRENT REALITIES AND SOME OF THE THINGS WE'RE EXPERIENCING IN ARIZONA WHERE WHETHER IT BE WATER AND COOLING, POWER GRID OR NOISE.
A LOT OF THE, A LOT OF THE KIND OF MISNOMERS ARE REFERENCING ANTIQUATED TECHNOLOGY.
I SAY ANTIQUATED, BUT IT'S ONLY BEEN EIGHT YEARS.
TEN YEARS HASN'T BEEN THAT LONG.
YEAH. AND SO THIS IS A GOOD KIND OF SNAPSHOT OF LIKE, WHAT, WHAT THEY'VE ALREADY DONE TO LIKE ADDRESS IT AND MOVE FORWARD IN THESE AREAS.
EXCUSE ME. CAN YOU GO TO THE NEXT SLIDE? I JUST HAD A QUESTION OR TWO, IF YOU DON'T MIND.
GREAT. YOU KNOW, I'D LOVE TO SEE THOUSANDS AND THOUSANDS OF CONSTRUCTION JOBS.
NO ISSUE THERE. THE QUESTION HAS BEEN, I'VE HEARD ANYWHERE ON A BUILDING COULD HAVE
[01:55:05]
ANYWHERE BETWEEN 100. AND SO IF 59 BUILDINGS WERE COMING INTO A PARTICULAR AREA AND THERE WERE 100,000 SQUARE FOOT BUILDINGS.I'VE HEARD TEN JOBS, 50 JOBS, 200 JOBS, 500 JOBS.
YOU'RE YOU'RE QUOTING THAT THERE.
BUT THEN WHEN WE'VE HAD SOME OF THESE DATA CENTERS COME HERE TO ASK US FOR A COMPREHENSIVE PLAN. WELL, IT'S 100 JOBS PER BUILDING.
WELL, IT'S 50 JOBS PER BUILDING.
HOW DO YOU GET 500 PLUS JOBS? IS THAT A 59 BUILDING, 60 BUILDINGS, 80 BUILDINGS, 100,000FT². BECAUSE AGAIN, THE PAY SCALE IS FANTASTIC.
BUT IS IT WHAT IS THE REAL NUMBER? BECAUSE I'VE HEARD FROM CHANDLER, THE NUMBERS WERE ABOUT 50 JOBS PER BUILDING.
BUT WHEN I HEAR 500, I GET EXCITED.
BUT THEN ALSO I HEAR 50 AND I GO, OH YEAH, YEAH.
AND SO THERE'S A COUPLE THERE'S A COUPLE VARIABLES, RIGHT? THE FIRST THING IS AGAIN, HYPERSCALER VERSUS LIKE A CO-LOCATED FACILITY. I WOULD SAY LIKE, THINK OF IT AS LIKE A SHOPPING CENTER, RIGHT? WHEN, WHEN EVERY KIND OF CUBBY IS A DIFFERENT COMPANY, THE PERMANENT EMPLOYEES THERE ARE NOT LIKELY TO BE MANY.
AND THE QUOTE UNQUOTE, PERMANENT EMPLOYEES THAT ARE THERE ARE LIKELY CONTRACTED, WHICH WE DON'T NECESSARILY COUNT AS EMPLOYEES BECAUSE THEY'RE CONTRACTED THROUGH A THIRD PARTY THAT WAS LIKELY ALREADY HERE. AND WHERE YOU GET THE 200 TO 500 IS WHAT WE WOULD CALL LIKE A DATA CENTER CAMPUS, ANYWHERE FROM MAYBE 3 TO 6 FACILITIES, KIND OF IN THAT SQUARE.
IT HAS FOUR UNIQUE FACILITIES.
AND THAT'S WHERE YOU GET THAT 200 AND 200 TO 500 EMPLOYEE COUNT.
SO A CAMPUS, NOT NECESSARILY A SINGLE BUILDING, BUT THERE ARE VERY FEW HYPERSCALERS THAT ARE JUST GOING TO BUILD A SINGLE BUILDING.
THEY'RE LIKELY GOING TO BUILD A CAMPUS OF AT LEAST FOUR AND THEN WITHIN A 50 MILE PROXIMITY, BUILD ANOTHER ONE AND ANOTHER ONE TO REALLY ENHANCE THE NETWORK EFFECT OF THE DATA CENTER. IN ADDITION TO THAT, LOOK AT THE LAST NUMBER THERE THREE TIMES.
I THINK THAT'S, YOU KNOW, THAT'S, THAT'S HARD TO CALCULATE WHAT THE WHAT THE INDIRECT OR THE WHAT'S GOING TO BE INDUCED BECAUSE OF ALL OF THIS.
I MEAN, THE WHOLE INDUSTRY ITSELF IS EVOLVING FROM WHERE IT WAS TO WHERE IT IS TODAY.
AND IT'S EVEN GOING TO INVOLVE MORE.
IT'S GOING TO GO EVEN MORE THAN THAT.
I MEAN, I DO LIKE SOME OF THE THINGS THAT EVERYBODY'S BEEN SAYING IN THAT.
I MEAN, I THINK OF IT AS WHEN I FIRST OPENED UP MY OFFICE, I WENT INTO AN EXECUTIVE SUITE.
I RENTED IT AND WE HAD A COMMON RECEPTIONIST OUT AT THE FRONT.
AND I THINK BASED ON WHAT THE ORIGINAL, THE FIRST DISCUSSION IN THE BEGINNING, THE, THE YOUNG LADY THAT INTRODUCED US, THE WHOLE SYSTEM IN THE FIRST PLACE TALKED ABOUT THAT CONCEPT. AND THEN IT JUST EVEN EVEN ON THE HYDRO ONES, THE ONES THAT ARE MUCH BIGGER ARE STILL THE SAME CONCEPT.
MULTIPLE COMPANIES ARE GOING TO BE DEALING WITH THAT.
THE DATA CENTERS. WE HAVE A DATA CENTER HERE.
PEOPLE CAN GO ON OUR WEBSITE MIGHT NOT BE THE BEST ONE YET, BUT WE'RE WORKING ON IT.
BUT THEY CAN ACTUALLY GATHER AND GATHER INFORMATION ON IT.
IF THEY WANT TO DO A SPLIT A LOT, THEY CAN GO ONLINE AND THEY CAN.
IT'S THE SAME SCENARIO HERE, JUST ON A LARGER SCALE.
YEAH. NO, ABSOLUTELY. AND THE I THINK THE OTHER PIECE TO TO HIGHLIGHT ON THAT THREE TIME MULTIPLIER IS WE TALK ABOUT SUPPLIERS IN ALL OF OUR OTHER INDUSTRIES AND SEMICONDUCTOR AND BATTERY TECHNOLOGY.
WE EVEN TALK ABOUT BUILDING SUPPLIER PARTS. BUT SUPPLIERS HERE ARE VERY SIGNIFICANT AS WELL. THE AMOUNT OF FIBER THAT IS LAID IN A DATA CENTER, THAT THOSE ARE COMPANIES THAT RELOCATE THEIR ENTIRE HEADQUARTERS TO WHERE THE ACTIVITY IS HAPPENING AND LOCATE THEIR THEIR BUSINESS OUT OF THERE FOR THE FORESEEABLE FUTURE BECAUSE OF THE AMOUNT OF ACTIVITY THAT'S HAPPENING IN, IN THAT AREA. WELL, AND I, YOU KNOW, BASED ON INDUSTRIES TAKING US THAT DIRECTION IS WHAT I'M SEEING.
AND I'VE GOT 80% OF MY POPULATION THAT LEAVES OUR AREA TO GO TO WORK.
AND I'VE ALWAYS BEEN OF THE MINDSET.
THAT'S WHY YOU DON'T HAVE TIME TO WATCH YOUTUBE. YOU'RE STANDING ON THE CORNER. IT'S HIM DOWN THERE THAT'S BEEN WATCHING YOU. THAT'S WHY I SAY YOU'RE JUST DOING MY JOB.
JUST ANOTHER QUICK QUESTION. PUBLIC SAFETY.
THESE BUILDINGS GO UP IN FLAMES.
PEOPLE WANT TO KNOW. OBVIOUSLY, IT'S A BUNCH OF COMPUTERS, A BUNCH OF PLASTIC. IT'S PROBABLY THE SAME AS KIND OF A BATTERY FIRE.
IT'S GOING TO BURN FOR AN X AMOUNT OF TIME OR WHAT? NO. SO DEFINITELY NOT THE SAME AS BATTERY FIRE.
THAT'S THE THAT'S THE COMPONENT IN BATTERY THAT REALLY CAUSES THEM TO, TO BE A UNIQUE. BUT THERE'S FIRE SUPPRESSION HERE SUFFICIENT TO KEEP IT INTERNAL.
RIGHT? ALL ALL OF THESE DATA CENTERS.
THE OTHER PIECE TO MAYBE NOTE ON THAT IS THAT THE MORE ADVANCED THESE CENTERS ARE, THE MORE THEY HAVE KIND OF WARNING MECHANISMS EVEN PRIOR TO ANYTHING LIKE THAT BEING POSSIBLE TO HAPPEN. BECAUSE, I MEAN, IT GOES UP IN FLAMES.
YOU'RE TALKING ANY TIME, ANY AMOUNT OF TIME THEY ARE OFFLINE.
THERE ARE TENS, HUNDREDS OF MILLIONS OF DOLLARS A DAY THAT THEY'RE LOSING OUT ON.
RIGHT. AND SO THE MORE ADVANCED THE DATA CENTER, THE MORE WARNING SIGNS OR WARNING SYSTEMS THAT THEY WOULD HAVE FAR BEFORE ANY TYPE OF
[02:00:02]
FIRE OR ANYTHING LIKE THAT. I GET THAT QUESTION. AND I'M JUST LIKE, IT'S, YOU KNOW, SAME AS YOUR HOUSE, WHICH IS ACTUALLY WORSE, BUT OKAY. YEAH, YOUR HOUSE. I ASKED THAT QUESTION BECAUSE I'M A PUBLIC SAFETY GUY. SO YEAH.AND I'LL OPEN UP TO SOME OTHER QUESTIONS, BUT ONE OTHER THING I JUST WANTED TO TOUCH ON. I THINK THIS IS MY LAST COUPLE SLIDES IS IT REALLY IS A PROVEN ECONOMIC ENGINE IN THE STATE ALREADY. YOU CAN SEE RIGHT HERE OVER $10 BILLION WHAT HAS CONTRIBUTED SINCE 23 TO THE STATE'S GDP, THE NUMBER OF JOB CREATION.
AND THAT DOESN'T INCLUDE CONSTRUCTION JOBS SINCE 23.
AND THEN LOCAL AND STATE TAX REVENUES THAT HAVE BEEN COLLECTED FROM 21 TO 23.
WE TALK ABOUT OUR INCENTIVES THAT ABATE THE TAXES FOR THE THE EQUIPMENT THAT GOES INTO THE DATA CENTERS. BUT WHAT IS TYPICALLY LEFT BEHIND IS THE, THE STRONG BASE OF PROPERTY TAX THAT THESE DATA CENTERS GENERATE GOING FROM RAW LAND, RIGHT? OR WHETHER IT BE PRIVATE OR STATE LAND AND GOING TO THIS VERY KIND OF CUTTING EDGE, MOST ADVANCED FACILITY.
AND THAT THAT DOES THAT DOES NUMBERS TO THE PROPERTY TAX BASE.
AND SO WHETHER IT BE ONE FACILITY OR 4 OR 6 THAT THAT JUST CONTINUES TO GROW.
THE PROPERTY TAX BASE AND THE EQUIPMENT IN EACH OF THE FACILITIES IS SWITCHED OUT.
CALL IT EVERY 4 TO 6 YEARS, FURTHERING, INCREASING AND IMPROVING THE THE PROPERTY TAX IN THAT ON THAT FACILITY.
AND THEN THIS IS THE OTHER THING WHERE AND YOU GUYS CAN TOUCH ON, WE TOUCHED ON THIS A LITTLE BIT, BUT JUST THE LONG TERM THINKING, RIGHT? LONG TERM THINKING. ONE OF THE GREAT THINGS ABOUT BEING IN PINAL COUNTY IS THAT THERE IS ROOM, THERE IS THE OPPORTUNITY TO LIKE TO PICK THE DEVELOPMENT, PICK WHERE IT'S GOING, RIGHT? YOU'RE NOT TRYING TO INFILL A DATA CENTER RIGHT IN THE MIDDLE OF A CITY.
YOU CAN YOU CAN VERY MUCH PROJECT AND MOVE OUT WHAT, WHAT THESE DATA CENTERS WILL LOOK LIKE, WHAT THE MAKE SURE THAT THEY ARE IN CLOSE PROXIMITY TO ADVANCED MANUFACTURING, AND MAKE SURE THAT YOU HAVE THE AREAS WHERE YOU WANT THEM TO BE. AND I KNOW WE WORK WITH YOUR ECONOMIC DEVELOPMENT TEAM ON A REGULAR BASIS WHEN WE'RE SITING ADVANCED MANUFACTURERS AND OTHER PROJECTS AND WHEN WE WORK WITH THEM, WE'RE LEO AND JOEL.
AND WHEN WE WORK WITH THE UTILITIES, THAT'S EXACTLY WHAT WE'RE LOOKING FOR.
LIKE, HEY, WHAT MAKES SENSE? WHAT DO YOU GUYS HAVE PLANNED HERE? WHERE DOES IT MAKE THE MOST SENSE TO BE HERE? AND SO I THINK THAT'S THE MAYBE THE GOLD STANDARD OF WHAT THE KIND OF GOOD NEIGHBOR LOOKS LIKE. WE WANT TO MAKE SURE WE'RE SITING THESE IN GOOD PLACES. THANK YOU.
SUPERVISOR. GOOD SIR. THAT ONE OVER THERE.
YOU HAVE A QUESTION. SO THIS MIGHT BE OUR I ASKED QUESTIONS FROM THE THE ELECTRIC COMPANIES AND THEY DIDN'T HAVE THE ANSWERS OF COURSE, BECAUSE IT'S NOT THEIR SPECIALTY. AND THIS MIGHT BE OUR ONLY CHANCE TO GET SOME ANSWERS BECAUSE USUALLY WE'RE DEALING WITH LOBBYISTS AND IT'S AND DEVELOPERS, IT'S, THEY JUST WANT THEIR PROJECTS APPROVED.
SO THEY'LL TELL US WHATEVER THEY THINK WE WANT TO HEAR.
BUT A LOT OF I STILL HAD SOME QUESTIONS OUT THERE.
HOW MUCH IS WHEN IS ENOUGH IS ENOUGH? AND DO WE BENEFIT FROM THEM IN OTHER AREAS? IF WE DO, THEN WE DON'T REALLY NEED TO KEEP PACE.
WE DON'T WANT PINAL COUNTY TO FALL BEHIND OTHER COUNTIES OR OTHER STATES.
SO DO WE NEED TO KEEP BRINGING THESE HERE IN ORDER TO KEEP PACE? WHEN YOU'RE TALKING ABOUT BRINGING THINGS LIKE WAYMO, PEOPLE DON'T CARE ABOUT WAYMO IF WE NEVER SEE ONE OF THOSE.
SO THAT'S NOT EVEN ON, YOU KNOW, WE REPRESENT THE CITIZENS.
WE DON'T CARE WHAT THE DEVELOPERS THINK OR WHAT WAYMO OR PEOPLE LIKE THAT ARE GOING TO DO. AND ALSO, IF YOU BRING AND WE ALSO HAVE TO WEIGH UP HERE, IF WE'RE BRINGING IN 500 JOBS FOR THIS DATA CENTER, ARE WE COSTING 2000 JOBS THAT THEY'LL BE REPLACING BY TECHNOLOGY THAT THIS WOULD.
NOW, IS IT INEVITABLE THAT THAT'S GOING TO HAPPEN ANYWAY? BUT MY MAIN QUESTIONS ARE HOW SATURATED DO WE HAVE TO BE? ARE THEY LIKE CELL TOWERS OR CAN WE BENEFIT FROM THEM FROM OTHER AREAS? YEAH. SO I'LL TOUCH ON THE AI PIECE, MAYBE LIKE ON THE JOB LOSS VERSUS CREATION, RIGHT? BECAUSE OBVIOUSLY AT THE COMMERCE AUTHORITY. OUR WHOLE PREMISE IS JOB CREATION AND IN ADVANCED ADVANCED INDUSTRIES.
AND ONE OF THE. THE BIG THING WITH AI AND KIND OF THIS JOB IS WE SEE IT MORE AS AN ADDITIVE VERSUS A KIND OF A FULL REPLACEMENT WHEN IT COMES TO POSITIONS, RIGHT. IT WASN'T TOO LONG AGO WHEN WE'RE WHEN IT WAS LIKE HENRY FORD AND THE FORD ASSEMBLY LINE, RIGHT. AND THERE WAS SOMEBODY TO PUT TOGETHER THE WIDGET AND THEN INSPECT THE WIDGET AND THEN TIGHTEN THE LIKE EVERY EVERYBODY DID ONE THING, ONE THING OR ANOTHER. RIGHT? AND NOW LIKE MAYBE 3 OR 4 OF THOSE JOBS ARE ONE JOB, BUT IT IS NOT AN ENTRY LEVEL JOB.
IT IS AN HOURLY TECHNICIAN THAT MAKES A GREAT WAGE.
I MEAN, LUCID MOTORS IS A GREAT EXAMPLE, RIGHT? HOURLY TECHNICIAN THAT MAKES GREAT WAGE AND IS ABLE TO IS ABLE TO KIND OF PROVIDE FOR THE FAMILY.
AND SO I THINK WE SEE AI AND LIKE THE EVOLUTION OF IT MORE AS THAT WHERE IT'S GOING TO ENHANCE AND MAKE PEOPLE MORE PRODUCTIVE IN THEIR JOBS, NOT NECESSARILY REPLACE JOBS, AT LEAST.
ON THE OTHER SIDE, THE WHEN IS ENOUGH, ENOUGH,
[02:05:01]
ON THE DATA CENTER SIDE.RIGHT NOW THEY ARE. THEY'RE BUILDING OUT CAPACITY.
THAT'S WHAT'S HAPPENING, RIGHT? I THINK OF IT VERY MUCH LIKE THE ELECTRIFY IN THE US.
RIGHT. THEY'RE BUILDING OUT CAPACITY RIGHT NOW. AND SO RIGHT NOW EVEN RIGHT NOW LATENCY AND PROXIMITY IS IMPORTANT FOR KEY CATEGORIES.
AND I REFERENCED WAYMO AS AN EXAMPLE.
AND IT'S NOT, IT'S ONE OF THOSE KIND OF TECHNOLOGIES.
LIKE THEY'RE NOT IMPORTANT UNTIL THEY ARE RIGHT.
I KNOW PINAL COUNTY IS GROWING VERY, VERY QUICKLY.
AND SO WITH THE MANUFACTURING YOU HAVE HERE IN A VERY SHORT AMOUNT OF TIME, YOU'RE GOING TO START TRYING TO ATTRACT HEADQUARTERS HERE, AND THEN THEY'RE GOING TO BE LOOKING AT AMENITIES. AND SOME OF THOSE AMENITIES ARE GOING TO BE ROBOTAXIS AND SOME OF THESE OTHER THINGS THAT RELY ON DATA CENTERS TO, TO REALLY KIND OF PUSH THE PUSH IT FORWARD, RIGHT? BUT THERE DOESN'T HAVE TO BE ONE.
THEY'RE NOT GOING TO BE LIKE CELL TOWERS WHERE THEY HAVE TO BE ON EVERY CORNER. I THINK THE, THE MORE, THE BETTER WAY TO LOOK AT IT IS YOU WANT JUST LIKE ROAD INFRASTRUCTURE IS YOU WANT TO BE AHEAD OF IT.
YOU WANT TO BUILD AND PLAN FOR THE FUTURE.
BECAUSE THE MORE COMPLEX THAT THESE DATA SETS GET, THE MORE THAT THAT LATENCY IS GOING TO BE CRITICAL.
THE FASTER THE TECHNOLOGY GETS IN THESE DATA CENTERS, THE MORE IT'S GOING TO BE IMPORTANT THAT THEY'RE MORE LOCAL THAN ACROSS THE WORLD OR ACROSS THE COUNTRY. AND THE MORE OF OUR PERSONAL LIKE AS A POPULATION, THE MORE OF OUR PERSONAL INFORMATION, WHETHER IT BE HEALTH CARE OR OTHERWISE THAT WE PUT IN THERE, THE MORE CRITICAL IS GOING TO BE THAT WE WANT IT IN CLOSE PROXIMITY.
DOES THAT ANSWER THAT? BUT MORE SO, YES.
OKAY. SO THERE WILL BE A POINT WHEN WE HAVE ENOUGH AND LIKE YOU ALREADY SAID, HAS WE DON'T KNOW HOW MANY MESA HAVE MADE IN MARICOPA COUNTY BECAUSE WE ONLY HEAR OUR NEWS OUT HERE. AND YOU KNOW, WE HEARD THAT, YOU KNOW, TUCSON DIDN'T APPROVE THAT HUGE ONE DOWN THERE WOULD HAVE BEEN ONE OF THE BIGGEST ONES. AND I KNOW QUEEN CREEK, WHOSE THEY WON EVERYTHING.
YEAH. BRING IT UP HERE. WE'LL TAKE IT, YOU KNOW, AND IT'LL BE INDUSTRY DRIVEN, I WOULD IMAGINE. YEAH. YEAH. AND I THINK IT'S GOING TO BE A BALANCE, RIGHT. LIKE AS YOU GET FURTHER AND FURTHER BUILT OUT, I THINK IT'S GOING TO BE ONE OF THOSE TOPICS WHERE YOU HAVE TO LIKE CONTINUE TO EVALUATE AS, AS YOU'RE 85, 90, 95%, LIKE BUILT OUT THE SPACE THAT IS AVAILABLE THAT'S REMAINING IS SOMETHING THAT YOU'LL HAVE TO EVALUATE WHAT IS THE BEST AND HIGHEST USE FOR THAT SPACE. AND LOOKING AT THOSE STRUCTURES 30 YEARS FROM NOW, WHEN THIS IS ALL OBSOLETE, YOU CAN'T USE THOSE AS WAREHOUSES.
THEY'LL BE THEY'LL, THEY'LL, THEY'LL BE HOMELESS SHELTERS.
I DON'T THINK THEY CAN BE REPURPOSED FOR I WON'T PREDICT 30 YEARS FROM NOW.
BUT YEAH, NEVER KNOW. ALL THE PEOPLE THAT YOU PUT OUT OF A JOB WILL BE LIVING IN THOSE.
SO IT'LL BE FINE. IT'LL BE FINE.
OKAY. ANY OTHER QUESTIONS FOR MR. TATE? I'M SORRY FOR MR. REESE. THANK YOU. THANK YOU.
ALL RIGHT. I THINK THAT CONCLUDES THE.
THANK YOU. WE WILL THEN NOW MOVE ON TO ITEM NUMBER SIX,
[6. Work Session on PZ-C-001-26: Pinal County Development Services, Planning Division, to discuss the Pinal County Development Services Code, Section 2.150.300, related to Hillside Development under case PZ-C-001-26 applicable to properties in the unincorporated area of Pinal County, Arizona. (Dedrick Denton/Joe Ortiz)]
WHICH IS PINAL COUNTY DEVELOPMENT SERVICES.AND I BELIEVE, MR. DENTON, YOU ARE UP.
THANK YOU. BUT WHAT DID YOU LEARN? I MEAN, MY GOD, YOU KNOW, I LEARNED A LOT.
OH, THERE YOU GO. YOU GUYS, BUT I DID.
I APPRECIATE IT. THANK YOU ALL FOR COMING TODAY.
THANK YOU. WELL. GOOD AFTERNOON.
DEDRICK DENTON, I'M THE INTERIM COMMUNITY DEVELOPMENT DIRECTOR.
AND TODAY I HAVE THE PLEASURE TO PRESENT THE HILLSIDE DEVELOPMENT STANDARDS TO THE BOARD.
AND AS PART AS THIS AS PART OF THIS CODE UPDATE THIS PARTICULAR ORDINANCE IS A PROVISION IN THE ORDINANCE TO ALLOW SOME FLEXIBLE DEVELOPMENT IN THE HILLSIDE, OR A LOT THAT IS CONSIDERED A HILLSIDE.
CURRENTLY WE DON'T HAVE LIKE ANY STANDARDS OUT THERE.
SO BUT THIS PROVISION IS TO HELP TO CREATE THAT FLEXIBILITY SO PEOPLE CAN BUILD BELOW, ABOVE THAT 15% SLOPE LINE, AND THEN ALSO PROTECT THE HILLSIDE AS WELL.
SO DID YOU JUST SAY BUILD IT QUICK BEFORE WE PUT A STANDARD IN PLACE? DID WHAT? BUILD IT QUICK BEFORE WE PUT A STANDARD IN PLACE.
IS THAT WHAT YOU JUST SAID? NO. OKAY. YOU KNOW, WE DON'T WANT TO MENTION THAT.
SO I WANT TO TALK ABOUT LIKE THE PURPOSE AND INTENT.
AND THEN ALSO I WANT TO GO AND DO AN OVERVIEW OF THE THE REGULATIONS, THE DRAFT REGULATIONS.
BUT I WANTED TO ASK YOU GUYS I COULD DO A HIGH LEVEL OVERVIEW, BUT IF YOU GUYS HAVE TIME, WE CAN GET INTO THE WEEDS AND GO LINE BY LINE, BUT I WILL LEAVE IT TO YOU, SPRAY SOME ROUNDUP AND DO THE HIGH LEVEL, HIGH LEVEL. OKAY. AND THEN AFTER THAT, SOME OF THE NEXT STEPS THAT WE HAVE IN PLACE.
PINAL COUNTY CURRENTLY DOES NOT HAVE AN ORDINANCE TO ADDRESS HILLSIDE DEVELOPMENT.
[02:10:06]
THE PURPOSE IS TO ALLOW REASONABLE AND BENEFICIAL USE OF PRIVATE PROPERTY WITHIN AREAS WITH THE HILLSIDE SLOPE GREATER THAN 15% AND ALSO PRESERVING THE RIDGE LINES.IN THIS OVERVIEW, I HAVE EVERYTHING FROM KEY DEFINITIONS THAT'S IN THE DRAFT REGULATIONS AND THEN ALL THE WAY DOWN TO OUR SUBMISSION SUBMISSION REQUIREMENTS.
THANK YOU VERY MUCH. WELL, LET ME GIVE YOU LIKE A BEFORE WE GET THERE.
I KNOW IT'S LUNCH TIME, BUT BEFORE WE GET THERE, LET ME GO A LITTLE BIT OVER.
SOME OF THE THINGS AT A HIGH LEVEL THAT IS ALSO IN THE REGULATIONS.
SO WITH THAT, WE DO HAVE LET ME GO BACK HERE ONE MORE.
WE DO HAVE SOME KEY DEFINITIONS IN THERE THAT KIND OF ADDRESS WHAT A DISTURBANCE AREA MEANS, WHAT HILLSIDE MEANS AND WHAT RIDGELINE MEANS.
AND THEN WE ALSO HAVE SOME EXAMPLES IN THERE.
FOR EXAMPLE, THAT SHOWS YOU WHAT IS A HILLSIDE LOT.
WHAT DOES A PORTION OF A HILLSIDE LOT LOOKS LIKE? AND THEN ALSO WHAT'S NOT CONSIDERED A HILLSIDE LOT? UNDER GENERAL PROVISIONS, WE ALSO HAVE SOME APPLICATION TRIGGERS THAT LET YOU KNOW THERE'S LIKE CERTAIN THINGS THAT OR CONDITIONS LIKE ABOVE THE 15%, 15% SLOPE LINE. THAT WILL DEEM AYE THAT WOULD DEEM LIKE DEVELOPMENT STANDARDS WOULD NEED TO BE MADE WITHIN A A LOT THAT'S ABOVE THE 15% SLOPE LINE.
SO FOR INSTANCE PRIOR TO THE ISSUANCE OF A BUILDING PERMIT AND ALL ZONING DISTRICTS, THE HILLSIDE DEVELOPMENT STANDARDS SHALL APPLY TO THE DISTURBANCE AREA.
IF ANY PORTION OF THE LAND DEEMED HILLSIDE IS DISTURBED FOR DEVELOPMENT.
AND THEN ALSO IN THE GENERAL PROVISIONS, WE TALK ABOUT DISTURBANCE AREAS.
THE CODE INCLUDES EXAMPLES OF WHAT WOULD BE SUBJECT TO HILLSIDE DEVELOPMENT STANDARDS AND WHAT AREAS WOULD NOT BE SUBJECT TO HILLSIDE DEVELOPMENT DEVELOPMENTS.
WE ALSO HAVE A GRANDFATHER CLAUSE THAT WOULD BASICALLY IF THEY ALREADY PULLED A PERMIT THEY CAN JUST CONTINUE ON AND MAKE THEM TO APPLY TO THE NEW STANDARDS.
AND THEN ALSO, THERE'S A PROVISION TO CHALLENGE THE BUILDING SAFETY DECISION REGARDING WHETHER THEY DETERMINE THAT YOUR LOT MEETS THE 15% OR GREATER THAN THE 15% SLOPE LOT LINE. EXCUSE ME.
AND THEN WITH THAT, THEY WOULD NEED TO PROVIDE LIKE A WRITTEN REPORT BY A REGISTERED OR ARIZONA REGISTERED CIVIL ENGINEER WILL BE REQUIRED.
AND THEN THEY WOULD NEED TO INCLUDE SOME SILL TOPOGRAPHIC PLANS.
SO. THIS IS STUFF WE HAVEN'T BEEN DOING THEN.
RIGHT. CORRECT. WE DON'T HAVE NO MECHANISM IN PLACE RIGHT NOW.
OKAY. SO WE'VE GOT WE'VE GOT THESE TYPE OF CONSTRUCTIONS THAT ARE BEING DONE RIGHT NOW THAT I'M AWARE THAT SOME AREAS THIS HAS COME OUT OF THE RESULT OF ALL THAT.
YES, BECAUSE THERE WERE SOME AREAS IN THE COUNTY WHERE THEY BUILT IN THE HILLSIDE, BUT WE NEVER HAD ANY MECHANISMS TO PLACE ANY STANDARDS ON THAT.
OKAY. ANOTHER TOOL IN THE TOOLBOX.
BUT THAT'S BEEN HAPPENING QUITE FREQUENTLY, WHICH YOU GUYS BOTH NOW HAVE PART OF THAT AREA WHERE THAT'S BEEN HAPPENING OVER HERE.
SO YEAH, GOOD LUCK. I LIVE ON HILLTOP, SO YEAH.
AND THEN WE ALSO HAVE SOME DEVELOPMENT STANDARDS THAT WOULD ADDRESS GRADING AND DRAINAGE REQUIREMENTS FOR YOUR TOTAL DISTURBANCE AREA.
IT ACTUALLY DOES. ACTUALLY LIKE CARVE OUT WHAT AREA OF THE LOT THAT YOU CAN DISTURB.
SO IT'S 35% OF THE GROSS TOTAL LOT AREA OR 2200, NOT 220,000FT², WHICHEVER IS SMALLER.
SO YOU ONLY CAN DISTURB JUST A PORTION OF THE LOT AND NOT THE ENTIRE LOT.
OKAY. WE ALSO HAVE SOME REQUIREMENTS FOR SEWAGE AND DISPOSAL SYSTEMS. THERE'S SOME REQUIREMENTS FOR UTILITY LINES DRIVEWAY REQUIREMENTS.
I WANT TO MAKE SURE THAT THE ROAD LEADING UP TO YOUR HILLSIDE IS NOT TOO STEEP.
[02:15:05]
TYPICALLY LIKE 12% LIKE GRADE.YEP. WE DON'T WANT THEM TO GET TOO STEEP.
AND THEN ALSO FOR ROADWAYS, MAKING SURE THAT THE HILLSIDE DISTURBANCE SHALL NOT CONTAIN WITHIN DEDICATED RIGHT OF WAY SUBDIVISION, PRIVATE STREET TRACTS OR EASEMENTS.
ROADWAYS WITHIN EASEMENTS ARE INCLUDED IN THE MAXIMUM GROSS LOT DISTURBANCE.
AND THEN ROADWAY MAXIMUM SLOPES FOR PUBLIC STREETS SHALL ADHERE TO THE REQUIREMENTS OF THE PINELLAS COUNTY SUBDIVISION AND INFRASTRUCTURE DESIGN MANUAL.
WE DO HAVE SOME REQUIREMENTS FOR THE BUILDING AND STRUCTURE THAT NO BUILDING OR STRUCTURE SHALL BE PLACED OUTSIDE OF THE LOT.
BUILDABLE, BUILDABLE AREA WITHIN ANY PORTION OF A REQUIRED YARD THAT HAS A HILLSIDE SLOPE.
THIS SHALL NOT BE CONSTRUED TO PREVENT RELIEF FROM THE STANDARDS WITH AN APPROVAL OF A SPECIAL USE PERMIT. SOME DRAINAGE REQUIREMENTS AND THEN CUT AND FILL SLOPE REQUIREMENTS. SOME REQUIREMENTS FOR RETAINING WALLS THAT EFFICIENT THAT THE FINISHED SURFACE OF ANY RETAINING WALL SHALL BLEND INTO THE NATURAL SETTING.
SOME REQUIREMENTS FULFILL REQUIREMENTS.
FILL PARTS HIGHER THAN TEN FEET.
SHALL BE DESIGNED BY GEOTECHNICAL ENGINEER.
WE ALSO HAVE SOME REQUIREMENTS IN THERE FOR SLOPE STABILIZATION AND RESTORATION.
AND THEN THE NEXT SECTION OF THE ORDINANCE DEALS WITH HEIGHT REGULATION.
SO ON THE HILLSIDE PROPERTY OF ANY PROPERTY, THE HEIGHT OF ALL BUILDING STRUCTURE SHALL NOT EXCEED 30. THE 30 FOOT PLANE PARALLEL TO THE AVERAGE NATURAL SLOPE.
THIS IS MEASURED VERTICALLY FROM THE GROUND OF THE NATURAL SLOPE THROUGH ANY BUILDING, CROSS SECTION TO THE 30 FOOT PLANE PARALLEL TO THE AVERAGE NATURAL SLOPE.
SO YOU KNOW. SO THE BUILDING DOESN'T GET LIKE TOO HIGH UP.
THERE'S SOME MAXIMUM HEIGHT FOR THE RETAINING WALL THAT IT SHOULD BE NO MORE THAN EIGHT FEET. AND AND THEN SOME AND THEN FOR THE RETAINING WALL THERE'S SOME LIKE COLOR TREATMENT AND TEXTURE AND STUFF.
SO IT CAN BLEND IN WITH THE SURROUNDING AREA.
DO WE HAVE PICTURES TO GO WITH THIS? IT'S IN YOUR PACKET. IT WAS IN THE PACKET. NO, I KNOW, BUT I MEAN I'M JUST YOU JUST WANT. NO NO NO. WELL, I'M A VISUAL KIND OF A GUY AND I KNOW SOME OF THEM OUT THERE ARE VISUAL.
OH, WE DO HAVE. YOU DO HAVE PICTURES AND JUST AS.
OH YEAH. OKAY, YOU GUYS WROTE ALL THIS STUFF UP.
THAT'S A PICTURE. LOOK. NO, BUT I WAS JUST LOOKING. OH, THERE WE GO.
THAT'S ONE FOR THE BUILDING HEIGHT. BUT WHEN YOU WROTE ALL THIS. WE DON'T HAVE COLORS, THOUGH. OH, MAN. GET YOUR CRAYONS QUICK.
WHEN YOU DID ALL THIS STUFF, THOUGH, I MEAN, YOU TOOK THIS FROM SOMEONE THAT'S ALREADY DONE THIS. DID WE JUST WRITE THEM FROM SCRATCH, DUDE? YEAH. THEY LOOKED AT OTHER AREAS LIKE MARICOPA COUNTY IN THE VALLEY.
AND THEN WE ALSO HAD OUR COUNTY ENGINEER LOOK AT THEM AS WELL.
YEAH. YES. BUT JUST A POINT, YOU KNOW, SOME CASES.
SO ANYWAY, OKAY. BUT, BUT I'M JUST SAYING, BUT WE TOOK THOSE THINGS AND LOOKED AT THEM, TAILORED THEM TO PINAL COUNTY. OKAY, GOOD. THANK YOU. GOT IT.
AND THEN THE LAST SECTION OF THE ORDINANCE JUST DEAL WITH PROCEDURAL, LIKE BASICALLY SUBMITTING.
SO THEY GOT TO SUBMIT A PLOT PLAN.
AND THEN THE PLOT PLAN BASICALLY HAS TO INCLUDE A CONTOUR INTERVAL NOT EXCEEDING TWO FOOT INTERVALS AND TOPOGRAPHIC SURVEY PREPARED AND SEALED BY CIVIL ENGINEER.
AND THEN THE SCALE OF YOUR SITE PLAN.
AND THEN THEY ALSO NEED TO SHOW SOME CROSS SECTIONS AND GRAPHICAL DEPICTIONS OF OF ALL THE DISTURBED AREAS AND SHOWN SHOW THE PROPOSED METHODS OF THE FINAL TREATMENT.
GRADING AND DRAINAGE PLAN WILL BE REQUIRED.
THE LOCATION OF ALL PROPOSED UTILITY LINES, SEPTIC TANKS AND SEWAGE DISPOSAL AREA.
LEGAL DESCRIPTION. AND THEN SOME MORE LIKE THE TABLE FOR THE ACTUAL PLOT PLAN WOULD NEED TO BE SOME OF THOSE THINGS THAT THEY WOULD NEED TO SUBMIT FOR US FOR REVIEW.
THAT'S GOOD. AND TO BE THAT THOROUGH.
YEAH. AND THEN OUR NEXT STEP AFTER THIS MEETING WE DO HAVE A LIST OF ABOUT 15 FOLKS THAT WE IDENTIFIED THAT WOULD BE IN OUR STAKEHOLDERS GROUP.
SO WE'RE GOING TO SEND THIS INFORMATION OUT TO THEM TO GET SOME COMMENTS AND FEEDBACK FROM THEM. WE ALSO WORKING ON A WEBSITE THAT'S KIND OF SIMILAR TO THE SUBDIVISION REGULATIONS. SO WE CAN POST IT ONLINE SO PEOPLE CAN TAKE A LOOK AND COMMENT ON IT.
[02:20:05]
THOSE FOLKS THAT ARE WORKING IS THIS TO PRIORITIZE? IS THAT WHAT THAT'S ABOUT? WELL, I'M NOT FALL INTO PRIORITIZE.WELL WE WE HAVE SOME ISSUES WITH WITH WEDDING VENUES IN RURAL, IN RESIDENTIAL NEIGHBORHOODS.
SO WE'D LIKE TO LIKE GET THAT ONE TO THE TOP TO GET SOME RELIEF AS SOON AS POSSIBLE.
YEAH. YEAH. WE YOU KNOW, WE'RE WELL, WELL, WE ARE WELL AWARE THAT YOU GUYS HAVE SOME PRIORITIES TOO.
I THINK WE SPOKE TO A NUMBER OF YOU GUYS, AND PART OF THAT IS TO MOVE A LOT OF THOSE THINGS UP TO THE TOP TO ADDRESS THOSE ISSUES.
YEAH. AND BUT THIS ONE HERE IS REALLY CAUSING SOME MAJOR PROBLEMS IN THESE AREAS WHERE THEY ARE BUILDING IN THE HILLTOPS.
AND IT'S BUT RATHER THAN TRY TO DO ALL THE ORDINANCES ALTOGETHER, THIS WAS THEY'RE TRYING TO DO IT INDIVIDUALLY AND THIS IS ONE OF THEM.
BUT I GET WHERE YOU'RE COMING FROM TOO.
YEAH. THERE'S A, WE DO HAVE A HANDFUL OF ONES THAT WE HAVE HEARD FROM YOU GUYS THAT WE WANT TO PRIORITIZE. YEAH. ADDRESS THOSE ISSUES.
ANY OTHER RELEVANT QUESTIONS FOR MR. DENTON? JUST OBVIOUSLY THIS WILL GO OUT TO THE PUBLIC.
THIS IS NOT SOMETHING THAT'S GOING TO JUST BOOM.
WE'RE ANNOUNCING IT TODAY THAT THIS IS GOING TO BE PUBLICIZED.
SOCIAL MEDIA WEBSITE AND OKAY, I JUST WANT TO MAKE SURE OF THAT.
I HAVE IT OUT THERE ABOUT ESTIMATE LIKE 30 DAYS OF THE PUBLIC HAVE A CHANCE TO COMMENT ON IT. THEN AFTER THAT, THEN WE'LL DO A WORK SESSION WITH P AND Z, THEN A HEARING WITH P AND Z, THEN COME BACK TO THE BOARD.
OKAY. AND THEN ALSO THE HOW DID YOU DETERMINE THE 15 PEOPLE? THAT'S ALL. WELL, WHAT WAS THE FORMER COUNTY ENGINEER? HE HAD A PRETTY GOOD LIST OF CONTRACTORS THAT HE DEALS WITH ALL THE TIME.
OKAY. THANKS. GOOD. THANK YOU.
I THINK THERE ARE NO MORE QUESTIONS FROM THE BOARD.
THANK YOU, MR. DENT. APPRECIATE YOUR TIME.
THANKS FOR HANGING OUT AND LEARNING ALL ABOUT THE POWER OF STUFF AND DATA CENTERS.
HEY, I NEED THE INFORMATION AND I SEE THE REST OF THE CREW OUT THERE LEARNING THAT TOO.
YEP. YOU'RE WELCOME. AND WITH THAT, THERE'S
NO MORE BUSINESS BEFORE THE BOARD. WE'RE ADJOURNED.